WEEK 6 Introduction to Project Management. Wk 6 Agenda Verify Hybrid Wk 5 Review Wk 5 ◦ Compressing the Schedule ◦ Risk Identification Techniques ◦ Project.

Slides:



Advertisements
Similar presentations
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Project Monitoring Section B 1.
Advertisements

WEEK 6. InitiatingPlanning Executing Controlling Closing “keeping things in control and in order“ Controlling Projects.
Project Management Shuffle Directions: take the definitions from the following cards and write a song using the tune from “Cupid Shuffle”
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
WEEK 5 Introduction to Project Management. Agenda Hybrid Wk4 Review Phase 2: Planning ◦ Compressing the Schedule ◦ Risk Analysis Phase 3: Executing.
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Degree and Graduation Seminar Scope Management
Project Change Management
Projmgmt-1/33 DePaul University Project Management I - Risk Management Instructor: David A. Lash.
Project Integration Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project.
Modern Systems Analysis and Design Third Edition
Project Scope Management
What is a project? Project Management Institute definition
1 SWE Introduction to Software Engineering Lecture 6 - Software Project Management.
Project Management Session 7
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Chapter 3: The Project Management Process Groups
Author:Prof.Dr.Tomas Ganiron Jr1 CHAPTER 7 PROJECT EXECUTION, MONITOR & CONTROL PROCESS 7-1 Project Executing process 7-2What is Project monitor & control.
Purpose of the Standards
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Management Body of Knowledge PMBOK
WEEK 7 Introduction to Project Management. Wk 7 Agenda Review Phase 5: Closing Out the Project Review for test Assignment Discussion Quiz.
Copyright 2002 Prentice-Hall, Inc. Managing the Information Systems Project 3.1 Chapter 3.
WEEK 5 Introduction to Project Management. Agenda Phase 2: Planning ◦ Compressing the Schedule ◦ Risk Analysis Phase 3: Executing.
4th Phase : 4th Phase : CONTROL Why is control necessary? Because:  People make mistakes  External factors can have impact on the project  Requirements,
Project Management : Techniques and Tools (60-499) Fall 2014 / Winter 2015.
Introduction PMBOK® © Whizlabs.
Certificate IV in Project Management Introduction to Project Management Course Number Qualification Code BSB41507.
1. 2 IMPORTANCE OF MANAGEMENT Some organizations have begun to ask their contractors to provide only project managers who have been certified as professionals.
WEEK 2 Introduction to Project Management. Agenda Wk 1 Review: ◦ Treasure Hunt Review Project Life Cycle Identify Stakeholders Phase 1: Initiating.
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
WEEK 6. Agenda Phase 4: Controlling Controlling Projects “keeping things in control and in order“ InitiatingPlanning Executing Controlling Closing.
Managing Project Resources. Project Resources Human Resources Project stakeholders: – Customers – Project team members – Support staff Systems analyst.
SacProNet An Overview of Project Management Techniques.
BSBPMG505A Manage Project Quality Manage Project Quality Project Quality Processes Diploma of Project Management Qualification Code BSB51507 Unit.
Project Life Cycle.
Apply Project Scope Management Techniques Project Scope Processes – Part 2 Certificate IV in Project Management Qualification Code BSB41507 Unit.
Copyright 2008  Project management process groups progress from initiating activities to planning activities, executing activities, monitoring and controlling.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 5 Project Integration Management.
Lecture 3 Title: Information Technology Project Methodology By: Mr Hashem Alaidaros MIS 434.
Agenda Interthink – 2003 Organizational Project Management Baseline Study –Industry Profile –Country Profile –Organization Size –Data On Schedule –Data.
Apply Quality Management Techniques Project Quality Processes Certificate IV in Project Management Qualification Code BSB41507 Unit Code BSBPMG404A.
Business Management. 2 “Copyright and Terms of Service Copyright © Texas Education Agency. The materials found on this website are copyrighted © and trademarked.
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Project Quality Processes C ertificate IV in Project Management
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Integrated Change Control 1 MEC-8. Processing of a Change Processing of a Change 2 Assess Impact within KA Change Request Implemented Change Create a.
Project Management Project Integration Management Minder Chen, Ph.D. CSU Channel Islands
Introduction to Project Management
Quick Recap.
Project Management Processes for a Project
Apply Project Scope Management Techniques Project Scope Processes – Part 2 Week 4 Certificate IV in Project Management Qualification Code BSB41507.
1. WHAT IS A PROJECT? “A project is a problem scheduled for solution.” This definition forces us to recognize that projects are aimed at solving problems.
SOFTWARE PROJECT MANAGEMENT
WEEK 6 Introduction to Project Management. Agenda Phase 4: Controlling.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
Chapter 7 Project Management and Event Implementation
The Project Management Process Groups
Project Management PTM721S
Software Configuration Management
Software Project Configuration Management
5.5 Control Scope The process of monitoring the status of both the project and product scope Focuses on managing any changes to the scope baseline and.
Controlling Projects “keeping things in control and in order“
Project Integration Management
Project Scope Management
Project Integration Management
Project Scope Management
Project Integration Management
Presentation transcript:

WEEK 6 Introduction to Project Management

Wk 6 Agenda Verify Hybrid Wk 5 Review Wk 5 ◦ Compressing the Schedule ◦ Risk Identification Techniques ◦ Project Assignment Questions? Execution Phase Continued Phase 4: Controlling

Any Questions of what we have seen so far?

Review Wk 5 - Compression What is compressing the schedule? How can you compress the schedule? What is the important rule to remember regarding compression? Which one is better? ◦ Look at all potential choices and then select the choice or choices that have the least negative impact

Review Wk 5 - Risks Risk Identification Techniques Affinity Diagrams:

Affinity Diagrams – How To: Read all ideas Sort ideas (generally done IN SILENCE so that no one is influenced by anyone else’s comments) Sort into natural themes by asking: ◦ What ideas are similar? ◦ Is this idea connected to any of the others? Keep moving the cards around until consensus is reached Create total group consensus

Controlling Projects “keeping things in control and in order“ InitiatingPlanning Executing Controlling Closing

Controlling Phase Ensuring that the project objectives are met by monitoring and measuring progress and taking corrective action when needed.

Controlling Phase Focus Involves measuring progress toward project objectives, monitoring deviation from the plan, and taking correction actions Outputs include performance reports, requested changes, and updates to various plans

Triple Constraint You must work with your clients to determine what their definition of success is. Scope Time Quality Cost

Project Change Management Definition: “a general term describing the procedures used to ensure that changes are introduced in a controlled and coordinated manner.”

Change Management Processes Change Request ◦ Requests to expand or reduce the project scope, modify policies, processes, plans or procedures, modify costs or budgets, or revise schedules. Change Order ◦ Used in some companies to identify approved change requests (order once it has been approved)

Changes Most change requests are the result of:  An external event  An error or omission in defining the scope of the product or project  A value-adding change (e.g., new technology, new software version, etc.)

Scope Creep Changes to the project that result in additional work. If not properly identified and managed properly, your project may come in considerably over budget and/or behind in schedule.

Hybrid / Homework Chapter 4

Quiz Time