M.Gasior, CERN-BE-BILHC Optics Measurement and Corrections Review, 17-18 June 2013 1 Diode ORbit and OScillation (DOROS) System Marek GASIOR Beam Instrumentation.

Slides:



Advertisements
Similar presentations
Bunch-by-Bunch Instrumentation Module Design Goals: –Unified conceptual design for all bunch-by-bunch instrumentation Beam position monitoring Bunch tune.
Advertisements

ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Lecture 4: Signal Conditioning
P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
M.Gasior, CERN-AB-BIBase-Band Tune (BBQ) Measurement System 1 Base-Band Tune (BBQ) Measurement System Marek Gasior Beam Instrumentation Group, CERN.
Lock-in amplifiers Signals and noise Frequency dependence of noise Low frequency ~ 1 / f –example: temperature (0.1 Hz), pressure.
Potentiostat Basics I’m Max Yaffe
Experimental set-up at E.S.R.F. L. Farvacque. 1/04/2004L. Farvacque - E.S.R.F.2 Experimental set-up Hardware Kickers Bpms Software Data acquisition processing.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Testing and Development of Feed-Forward System for ATF2 A. Kalinin Accelerator Science and Technology Centre, Daresbury Laboratory, UK Fifth ATF2 Project.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
Novocontrol Alpha Analyzers Fundamentals
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
RF Synchronisation Issues
Principles of Electronic Communication Systems
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
Part B-5 OSCILLATORS: Condition for oscillations. RC-phase oscillator with transistor and FET, Hartley and colpitts oscillators, Wien bridge oscillator,
Numerical algorithms for power system protection Prof. dr. sc. Ante Marušić, doc. dr. sc. Juraj Havelka University of Zagreb Faculty of Electrical Engineering.
Chapter 19 Electronics Fundamentals Circuits, Devices and Applications - Floyd © Copyright 2007 Prentice-Hall Chapter 19.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Commissioning requirements for Trajectory, Orbit and Tune measurements T. Lefevre on the behalf of the BI teams involved LBOC 9 September 2014.
L.Royer– Calice DESY – July 2010 Laurent ROYER, Samuel MANEN, Pascal GAY LPC Clermont-Ferrand R&D LPC Clermont-Fd dedicated to the.
Announcements mid-term Thursday (Oct 27 th ) Project ideas to me by Nov 1 st latest Assignment 4 due tomorrow (or now) Assignment 5 posted, due Friday.
Feedback on Nanosecond Timescales (FONT) - Review of Feedback Prototype Tests at ATF(KEK) Glenn Christian John Adams Institute, Oxford for FONT collaboration.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
M.Gasior, CERN-BE-BIBE-KT Innovation Day, 3 June Base Band Tune (BBQ) measurement systems - observing beam oscillations with sub-micrometre amplitudes.
Introduction to collimators Integration of BPM Mechanical design Electrical design Processing Simulations Results Conclusions & Outlook.
Beam phase and intensity measurement Grzegorz Kasprowicz Richard Jacobsson.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
ELECTRONIC INSTRUMENTATION & PLC DKT Signal Conditioning Circuits.
I could be brief… LHC BPM Status. I could be brief… BPM – Water cooled racks Thermalized Racks (BPM & BLM) consist of: o A temperature controller module.
BBQ system Tatiana and Benoit, thanks to a lot of help from Christian Boccard, Marek Gasior and Ralph Steinhagen (BE/BI-QP)
Future FONT BPM Processors C.Perry 25 June Types of Processor Two types of processor: a) present mixer type b) baseband type Both will be made because:
Unit 8 Operational Amplifier. Objectives: Ideal versus practical operational amplifier Performance parameters Some applications –Peak detector –Absolute.
M.Gasior, CERN-BE-BI 1 3D & the BBQ - Observing beam oscillations with sub-micrometre amplitudes Talk based on a Beam Instrumentation Workshop presentation.
Adapting the LHC 1TFB electronic circuit to other equipments The candidates are: PS 1TFB PS TFB PS CBFB PSB TFB PSB 1TFB 1 Alfred Blas Working group meeting.
M.Gasior, CERN-BE-BI8th DITANET Topical Workshop on Beam Position Monitors, January 2012, CERN 1 BPM Signal Processing with Diode Detectors Marek.
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
BI day /12/00 1 PIPOS Project (TT2 & TT10) (Beam performances) G. Vismara  Present situation  Proposals  Beam parameters  Technical solution.
Collimator BPM electronics – Results from the lab, SPS and LHC
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
1Ben ConstanceFONT Meeting 1st August 2008 ATF2 digital feedback board 9 channel board with replaceable daughter board (RS232 etc.) − Board will log data.
Principles of Electronic Communication Systems
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
Superfast BPM Processor Scheme and First Results Stephen Molloy, QMUL 2 nd Mini-Workshop for Nano-Project at ATF.
BeamCal Electronics Status FCAL Collaboration Meeting LAL-Orsay, October 5 th, 2007 Gunther Haller, Dietrich Freytag, Martin Breidenbach and Angel Abusleme.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
BPM stripline acquisition in CLEX Sébastien Vilalte.
DaMon: a resonator to observe bunch charge/length and dark current. > Principle of detecting weakly charged bunches > Setup of resonator and electronics.
Development of a High Resolution Cavity BPM for the CLIC Main Beam
High precision phase monitoring Alexandra Andersson, CERN Jonathan Sladen, CERN This work is supported by the Commission of the European Communities under.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
CLIC Beam instrumentation work shop, CERN, 2 nd & 3 rd of June 2009, Lars Søby BPM overview CLIC instrumentation work shop 2-3 June BPM overview.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
FUNCTION GENERATOR.
CI Lecture Series Summer 2010 An Overview of IQ Modulation and Demodulation Techniques for Cavity LLRF Control.
Superfast BPM Processor Scheme Stephen Molloy, QMUL Nano-Project Mini-Workshop at ATF.
Results of the 2007 BLM hardware tests in LSS5
Beam Secondary Shower Acquisition System: Front-End RF Design
INDUSTRIAL ELECTRONICS/ELECTRICITY
SAR ADC Input Types TIPL 4003 TI Precision Labs – ADCs
for the BI DOROS team (G. Baud, M. Gasior, M. Lasch, J. Olexa)
Electronic Devices Ninth Edition Floyd Chapter 16.
BCTW calibration status and future
Limits on damping times
Status of muon monitor R&D and construction
Feed forward orbit corrections for the CLIC RTML
ECE 3336 Introduction to Circuits & Electronics
8.5 Modulation of Signals basic idea and goals
Presentation transcript:

M.Gasior, CERN-BE-BILHC Optics Measurement and Corrections Review, June Diode ORbit and OScillation (DOROS) System Marek GASIOR Beam Instrumentation Group

M.Gasior, CERN-BE-BIDiode ORbit and Oscillation (DOROS) System 2  Each jaw end motorised independently  Beam centring required on each collimator end  Four button BPMs, one on each extremity of each jaw  Requirements for the collimator BPM electronics: resolution in the 1 µm range beam centring accuracy in the 10 µm range  Slow orbit measurement sufficient, 1000-turn averages acceptable  Bunch-by-bunch not needed Collimator BPMs

M.Gasior, CERN-BE-BIDiode ORbit and Oscillation (DOROS) System 3  Very good experience with diode detectors for tune measurement (BBQ systems): simple conversion of nanosecond beam pulses into slowly varying DC signals; sub-micrometre resolution possible with standard button and stripline BPM; very simple and robust.  Standard diode detectors not precise enough for orbit measurement (diode forward voltage, its temperature dependency)  New scheme for orbit measurement: compensated diode detectors The new idea: compensated diode detectors

M.Gasior, CERN-BE-BIDiode ORbit and Oscillation (DOROS) System 4  The most important part: Compensated Diode Detectors (CDD)  Initially designed for very precise beam centring, only later considered as a candidate for the LHC orbit measurement with regular BPMs  One processing and one ADC channel per BPM electrode  Beam position fully evaluated in the digital domain  24-bit ADCs sampling at f rev and averaged down to the standard 25 Hz, compatible with the current BPM system, UDP transmission  One DOR unit is for two collimators or two regular BPMs (8 channels for 4 planes)  Data throughput: 4 electrodes  32-bit samples  25 Hz = 400 bytes per second per BPM Diode ORbit (DOR) F = Follower CDD = Compensated Diode Detector MC = Main Controller SC = Synchronisation Circuitry EPL = Ethernet Physical Layer LPF = Low Pass Filter PGA = Programmable Gain Amplifier

M.Gasior, CERN-BE-BIDiode ORbit and Oscillation (DOROS) System 5 DOR front-end prototype

M.Gasior, CERN-BE-BIDiode ORbit and Oscillation (DOROS) System 6 DOR FE prototype installation on 2 BPMs in PT5

M.Gasior, CERN-BE-BIDiode ORbit and Oscillation (DOROS) System 7 DOR results with the collimator BPMs (SPS coasting beam)

M.Gasior, CERN-BE-BIDiode ORbit and Oscillation (DOROS) System 8 BPMSW.1L5: Standard vs. DOR during fill #3316

M.Gasior, CERN-BE-BIDiode ORbit and Oscillation (DOROS) System 9 BPMSW.1L5: Standard vs. DOR during fill #3316

M.Gasior, CERN-BE-BIDiode ORbit and Oscillation (DOROS) System 10 BPMSW.1L5: Diode ORbit during fill #3316

M.Gasior, CERN-BE-BIDiode ORbit and Oscillation (DOROS) System 11 Diode ORbit: stability measurement in the lab Diode ORbit and Oscillation (DOROS) System

M.Gasior, CERN-BE-BIDiode ORbit and Oscillation (DOROS) System 12  Optimisation: Standard: universal, bunch-by-bunch. DOR: orbits only, (sort of) bunch average.  Amplitude and time resolution: Standard: 12-bit ADCs sampling at 40 MHz. DOR: 24-bit ADCs sampling at f rev, samples averaged down to 25 Hz.  Gain switching: Standard: two gains (high and low). DOR: Many gains to maintain a fairly constant amplitude at the compensated diode detectors. The first prototype had 5 dB gain steps, the final will have 1 dB.  Calibration: Standard: simulated beam pulses. DOR: simulated beam pulses with variable filling pattern and amplitude and calibration with beam signals (e.g. swapping electrode signals on two DOR channels, two DOR channels connected to the same BPM electrode).  Architecture: Standard: modular, VME. DOR: standalone unit with Ethernet UDP data transmission, modular inside the DOROS unit. DOR vs. standard BPM electronics

M.Gasior, CERN-BE-BIDiode ORbit and Oscillation (DOROS) System 13  DOS ≈ BBQ on each BPM for phase advance measurement. The idea demonstrated by Ralph Steinhagen in the SPS in 2008 (see CERN-ATS ).  BPM + part of analogue processing + data transmission shared with the DOR  Largest overhead w.r.t. the DOR part is the beam synchronous timing (BST), which DOR does not need  24-bit ADCs sampling at f rev, real-time phase calculation, results at 25 Hz compatible with the orbit system, sent together in common UDP frames  Each DOS unit measures the phase advance w.r.t. a common reference derived from the BST  Real-time phase calculation at two frequencies (H+V) for coupling measurement  One DOROS FE = 4 orbits + 4 phases (typically H+V.B1 + H+V.B2) DOR + OScillation (DOROS) CDD = Compensated Diode Detector DPD = Diode Peak Detector DA = Differential Amplifier MC = Main Controller SC = Synchronisation Circuitry EPL = Ethernet Physical Layer LPF = Low Pass Filter PGA = Programmable Gain Amplifier F = Follower

M.Gasior, CERN-BE-BIDiode ORbit and Oscillation (DOROS) System 14 DOS lab measurements More on DOS in CERN-ATS : Prototype system for phase advance measurements of LHC small beam oscillations

M.Gasior, CERN-BE-BIDiode ORbit and Oscillation (DOROS) System 15  Optimisation: BBQ: frequency measurement with very small beam oscillations DOS: phase advance measurement in a sub-system “glued” to the diode orbit system  Amplitude sensitivity: DOS is a “slave” sub-system added to the DOR “master”, optimised for orbit measurement, while the BBQ is an “independent” system optimised for beam oscillation sensitivity. Therefore, DOS will be less sensitive than the BBQ. Probably part of the “sensitivity loss” can be compensated by longer phase advance measurement, which for the tune typically are not possible.  Synchronisation: All DOS units will be synchronised to a common phase reference from the beam synchronous timing; BBQ system units are synchronised to a common frequency reference (f rev ) with an arbitrary phase and therefore are not optimised at all for phase advance measurement.  Excitation: BBQ can operate with residual “natural” beam oscillations, while DOS will require proper beam excitation, hopefully in the 10 µm range. This is caused not only by the smaller DOS sensitivity, but also by the “explosive” nature of the natural beam oscillations.  Analogue filtering: BBQ has very heavy analogue filtering (6 th order Chebychev + f rev notch filters), introducing large phase shift, likely to change from one unit to another. DOS will have only simple analogue filters and the “heavy filtering” will be done in the digital domain, assuring very good symmetry between the DOS units.  Data rate: BBQ delivers data at f rev allowing observation of the full beam spectrum. DOS will deliver data at the regular orbit feedback rate (25 Hz) with real-time phase advance calculation in the DOS unit. In the normal mode DOS will deliver data only at the two beam excitation frequencies. Only in the test/full mode DOS will provide turn-by-turn data for development purposes. DOS vs. BBQ

M.Gasior, CERN-BE-BIDiode ORbit and Oscillation (DOROS) System 16  The new DOROS system should allow beam orbit measurement with sub-micrometre resolution and micrometre long term stability  DOROS will allow proper phase advance and coupling measurement, hopefully with beam excitation at the 10 μm level  For the start-up the DOROS will be installed as the only electronics on: Collimator BPMs (some 16 collimators) New BPMs in point 4 dedicated for BGIs (4 BPMs)  DOROS will be installed installed in parallel to the regular BPM electronics: First BPM before each experiment (4 experiments x 2 beams x 2 sides = 16 BPMs and 8 DOROS FEs) ???  The above locations will be used to: Evaluate the DOROS system, especially its long term stability Optimise its hardware and software Summary

M.Gasior, CERN-BE-BIDiode ORbit and Oscillation (DOROS) System 17 Spare slides

M.Gasior, CERN-BE-BIDiode ORbit and Oscillation (DOROS) System 18 DOS phase calculation

M.Gasior, CERN-BE-BIDiode ORbit and Oscillation (DOROS) System 19 DOS synchronisation

M.Gasior, CERN-BE-BIDiode ORbit and Oscillation (DOROS) System 20 Diode detectors: modes of operation Input (V i ) and output (V o ) voltages of a peak detector with an ideal diode Input (V i ) and output (V o ) voltages of a peak detector with a real diode Input (V i ) and output (V o ) voltages of an average-value detector

M.Gasior, CERN-BE-BIDiode ORbit and Oscillation (DOROS) System 21 Peak detector with a (more) realistic diode Charge balance equation for the following assumptions: -a simple diode model with a constant forward voltage V d and a constant series resistance r. -constant charging and discharging current, i.e. output voltage changes are small w.r.t. the input voltage. A numerical example: LHC, one bunch. For LHC τ ≈ 1 ns and T ≈ 89 μs, so for V o ≈ V i one requires R/r > T / τ. Therefore, for r ≈ 100 Ω, R > 8.9 MΩ. -For large T to τ rations peak detectors require large R values and a high input impedance amplifier, typically a JFET-input operational amplifier. -The slowest capacitor discharge is limited by the reverse leakage current of the diode (in the order of 100 nA for RF Schottky diodes). V i  V d n bunches