– Machine Controls Coordinators (MCC): team and role – Overview of renovations during LS1 – Proposal for after-LS1 Commissioning organization ACCOR PROJECT.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

TEC at SLM 24 Aug 2011 Vito Baggiolini Reporting about work initiated or coordinated by me.
FESA 3 Implementation Status Stephane Deghaye BE/CO On behalf of the FESA team and many users.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Accelerator Complex Controls Renovation, LHC Excluded Purpose and Scope M.Vanden Eynden on behalf of the AB/CO Group.
Release & Deployment ITIL Version 3
Controls Renovation for AB-BI Outline: Reminder of AB-BI-SW mandate History of controls renovation Renovation work-packages (-> 2012) – Projects known.
Coordinating EC Research Projects Paul Drath Singleimage Limited 3 Foundry Walk St Ives Cambs PE27 5FW phone fax
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
Roles Committees Meetings
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Status Report – Injection Working Group Working group to find strategy for more efficient start-up of injectors and associated facilities after long stops.
1 1. Some recent views ( ) 2 Linac tunnel
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Management Tools K. Pommès. Management Tools - The Project Planning Design Purchasing Production Installation To follow the project through its phases.
Debriefing of controls re-commissioning for injectors after LS1 TC 09 October 2014.
Nov, F. Di Maio, M.Vanden Eynden1 CO Proposal concerning AB Front-End Software Responsibilities First detailed proposal based on the global Front-end.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CERN Raul Murillo Garcia BE-CO LS1 review – TE-EPC feedback BE-CO LS1 review TE-EPC feedback Raul Murillo Garcia on behalf of TE-EPC Daniel Calcoen Stephen.
Planning & Installation meeting New working group EDMS th October 2014LIU PLI meeting - J.Coupard1.
Session 7: I-LHC Organization: Chamonix Summary Session7; Oliver Brüning 1 -session organized in collaboration with D. Manglunki and all speakers.
BE-CO review Looking back at LS1 CERN /12/2015 Delphine Jacquet BE/OP/LHC Denis Cotte BE/OP/PS 1.
LS1 Review P.Charrue. Audio/Video infrastructure LS1 saw the replacement of BI and RF analog to digital video transport Was organised in close collaboration.
Jan 23rd, 2008M.Vanden Eynden on behalf of the AB-CO Group1 AB-CO MTTR & Spare Part Policy for the LHC Injectors, Experimental Areas & other Facilities.
POST-ACCOR renovations until LS2 – DEBRIEFING – Marine Pace, CO3 – 17 September 2015 Input from Chris, Marc, Stephen, Stephane, Wojtek.
The ACCOR Project Status Report and Outlook for 2010 and beyond M.Vanden Eynden on behalf of the ACCOR Project Team 1M.Vanden Eynden (BE/CO) - IEFC Workshop,
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Standby Services or Reliance on Experts for Accelerator control? Claude-Henri Sicard AB/CO ATC/ABOC Days 2007.
2/2/12 2ACCOR PROJECT – BE-CO-TC – M.Vanden Eynden.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
LHC Section Meeting 1.eLogbook 2.LHC Controls Security Panel.
LS1 – View from Applications BE-CO LS1 review – 1 December 2015 Greg Kruk on behalf of the Applications section.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
Proposal: Use of ECRs for “Controls” Changes and Renovations Rende Steerenberg, Samy Chemli, Marine Gourber-Pace, Klaus Hanke, Verena Kain, Bettina Mikulec,
The OP Viewpoint on the Accelerator Complex Controls Renovation R. Steerenberg on behalf of the OP group Accelerator Complex Controls Renovation Workshop.
© 2001 By Default! A Free sample background from Slide 1 Controls for LEIR AB/CO Technical Committee - 18 th March 2004.
Digital LLRF: achievements and LS1 plans M. E. Angoletta, A. Blas, A. Butterworth, A. Findlay, M. Jaussi, P. Leinonen, T. Levens, J. Molendijk, J. Sanchez.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Marine Pace Technical Committee -12 Dec DRY RUNS COMMISSIONING & EARLY BEAM OPERATION STABLE OPERATION.
JIRA in BE-CO for Exploitation Marine BI Seminar 20 November
E. Hatziangeli – LHC Beam Commissioning meeting - 3 rd March 2009.
Feedback on Controls from 2015 Operation Marine Pace, on behalf of BE-CO. Evian Workshop Dec 2015 Marine Pace, BE-CO -Evian Workshop 2015.
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
Contents  Samplers and OASIS  New Controls Platform & Strategy  CTF3 Mini Pilot Project  Concluding Remarks IEFC Workshop, March 2011 Rende.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)
LS1 Review BE-CO-SRC Section Contributions from: A.Radeva, J.C Bau, J.Betz, S.Deghaye, A.Dworak, F.Hoguin, S.Jensen, I.Koszar, J.Lauener, F.Locci, W.Sliwinski,
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
TEXAS NODAL (ERCOT REVISIONS)
Accelerator Controls Renovation Project “ACCOR”
ICE SECTION The coolest place to be! Elias Métral
Update on the Critical Path of the PS Booster Schedule for the EYETS
Status and Plans for InCA
BE-ICS Activities during the LS2 Period (15 min)
LIU Wire Scanner Milestones June 2017
LINAC4 50 MeV phase BIS STATUS
Installations, modifications, consolidation in 2005:
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
Japan proposal on schedule
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
Overview & baseline of LS2 and roadmap for CRG
Japan proposal on schedule
ABP/RTL Main RTL Activities for 2007/8:-
Radiation Working Group RADWG
Presentation transcript:

– Machine Controls Coordinators (MCC): team and role – Overview of renovations during LS1 – Proposal for after-LS1 Commissioning organization ACCOR PROJECT – IEFC, June 8th, 2012 – M.Vanden Eynden1

2LS1 Plans and Organization – TC October 18th, 2012 MACHINEMCCSPECIFICITIES Linac3 + LEIR (ions)MarineMainly renovated in 2012 Linac4IoanNew machine Linac2 + PSBSteen CO system mainly developed + maintained by CO REX + ISOLDEFrank CPSMarine ADMatthieu SPSMarineCO system maintained by EQP GPs CTFMickNo shutdown - Live test bed

3LS1 Plans and Organization – TC October 18th, 2012

4 New Request Solution agreed Functional specification Breakdown in work packages MCC Gather renovation or upgrade request Organize technical meetings Provide EDMS Document HW FE What when Who SW FE What when Who AP What when Who DM What when Who HW tests Commissioning Plan Renovation Request Installation Team CO LS1 Planning officer Development of Work packages Follow and ensure planning is met Deployment - HW Tests OP Commissioning Follow deployment Participate to commissioning, led by OP Ensure it is complete + successful Transfer to Exploitation team Organize taking over by EXPL Commissioning Plan OP EXPL EQP OP CO EQP EXPL

LS1 Plans and Organization – TC October 18th, 2012

9 MACHINEFECAlready Renovated Renovation in LS1FE NOT renovated after LS1 LINAC ? LEIR LINAC 2915 (3*)3 PSB (+7?*) CPS AD (+3 ?*) SPS250±90±90 *±70 * Isolde-REX CTF42268?10 ? LINAC 4Continuous installation of new FE * Partial CO renovations * current RF crates, hot spares * Under discussion Leftovers Huge effort in LS1 By end LS1, % of FECs will be renovated * Uncertainty from RF & BI Initial

11LS1 Plans and Organization – TC October 18th, 2012

12

Record the issue Breakdown in WorkPackages WP1 HW install Jan 13 Manu WP2 Driver Mar 13 Toto WP3 FESA Apr 13 Titi Automatic Notification when action is completed Follow-up Progress Detect bottenecks Follow-up Progress Detect bottenecks EDMS Doc Prepare deployment

Slots will appear in the official accelerator schedule (decision at OP commissioning meetings) Time for fix / repair Time for final tuning LS1 Plans and Organization – TC October 18th, 2012 OP-CO-EQP collaboration Tests by OP OP-CO-EQP collaboration Tests by OP