SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph HST Quarterly Review – Instrument Status Charles D. (Tony) Keyes.

Slides:



Advertisements
Similar presentations
11/08/2001 FSW/GS Splinter Meeting 3 rd FSW/GS Splinter November 8, Ball COS WFC3 (morning session, auditorium) O. Lupie, WFC3 STScI Review of Goals.
Advertisements

SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Science Calibration & Instrument Status TIPS 20 Nov 2003 Last COS TIPS Aug 2003.
Spectral Characterization of calibration lamps: STIS An improved list of emission lines for STIS Calibration Enhancement Florian Kerber, ST-ECF TIPS Meeting.
Post-SM4 Sensitivity Calibration of the STIS Echelle Modes Azalee Bostroem With help from: Ralph Bohlin, Alessandra Aloisi, Charles Proffitt, Kenneth Hart,
Page 1 9/4/01 SMS Test Phase 2 & 3 WFC3 FSW and STScI Development Flow through SMGT 4/1/02-6/30/02 FSW 2.1 C&UT 7/8/01-8/15/01 FSW 2.2 C&UT - WFC3 Software.
Initial Alignment Check / Calibration in Vacuum Dennis Ebbets With substantial contributions from Tom Delker, Erik Wilkinson, Steve Osterman, Ken Brownsberger,
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 21 August 2001.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Language(s) We plan to develop CALCOS using Python and C Another programming language?
STIS Closeout Plan Paul Goudfrooij 2005 HST Calibration Workshop, 10/26/2005.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS TV Update 21 December 2006 Agenda Agenda Testing Setup and Status Testing Setup.
Cosmic Origins Spectrograph Hubble Space Telescope James C. Green University of Colorado Cosmic Origins Spectrograph Instrument Design and Capabilities.
Page 1. Page 2 SMOV Status SMOV is proceeding on-track Key programs executed –ERO program –Geometric distortion program completed –ACS to FGS alignment.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Status FUV Detector “1-bounce design” NUV Detector HST aberration fully-corrected Calibration.
TIPS Meeting 1.Observing Solar System Objects with JWST Ed Nelan 2.COS - Updates on COS DevelopmentKen Sembach 3.NICMOS StatusTommy Wiklind Next TIPS Meeting.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS TAGFLASH System Requirements Review COS Lamp Lifetime Estimates for TAGFLASH Scenarios.
Keyes - 5 Mar 2001 Slide 1 of 16 COS Science Team Meeting – STScI Status  STScI Integrated Scheduling System Development – TIME-TAG (primary science mode)
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 20 October 1999.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated.
COS PIPELINE PDR Daryl Swade December 7, 2000OPUS / OTFR Space Telescope Science Institute 1 of 24 Science Data Processing
HST Quarterly Review Page 1 Space Telescope Science Institute 12 February 2004 SI Status: COS STScI Support of COS Thermal-Vacuum Testing COS Thermal-Vacuum.
18 May 2006 Slide 1 of 10 STScI TAGFLASH Ground System Development Current ground system could support immediate COS launch Current ground system could.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Hubble Mission Status Review Charles D. (Tony) Keyes Last Review: 10 June August 2003.
TIPS COS Overview - Keyes : 18 May 2000 COS Overview v CDR: April 2000 v FUV delivery: January 2001 v Environmental (Thermal-Vac): spring 2002 v Launch:
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS: STIS Report Paul Goudfrooij 1.Unusual Target ACQ Failures: Update & Resolution 2.Calibration.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Calibration Outline of CALCOS Processing Steps and Keywords Reference Files Associations.
Performance of the Space Telescope Imaging Spectrograph after SM4 Charles R. Proffitt, A. Aloisi, K. A. Bostroem, C. R. Cox, R. I. Diaz, W. V. Dixon, P.
1-D Flat Fields for COS G130M and G160M Tom Ake TIPS 17 June 2010.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 January 2002.
Cosmic Origins Spectrograph
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Calibration Goals of CALCOS Association Table Input and Output Files High Level.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline PDR File Structure Overview Charles D. (Tony) Keyes 7 December 2000.
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
TIPS COS Status: SMOV update III STScI/CU COS Team 17 September 2009.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Status STIC 13 February 2001.
"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 19 Sept, 2002TIPS – WFC3 Status 1 -UVIS.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA SMOV4 Requirements Review Cosmic Origins Spectrograph Scott D. Friedman STScI 30 July 2003.
1 Hubble Science Operations Status Rodger Doxsey 18 November 2004.
Slide 1 of 5 COS Monthly Status Review David Soderblom STScI
COS PIPELINE CDR Jim Rose July 23, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 12 Science Data Processing
STIS Closeout Plan Paul Goudfrooij Space Telescope Users Committee, 11/18/2004.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 17 September 2002.
Click to Change Title Here is a text box to present information in paragraph format, instead of bulleted lists. We’ve left space to the right for an image.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Critical Design Review July 2001.
WFC3 COS 5 th COS/WFC3 FSW/GS Splinter Meeting Baggett - 03 April 2002 Slide 1 of 8 SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA 5 th COS/WFC3.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
The Status of HST/COS and HST/STIS Cristina Oliveira 8/12/14COS and STIS Cal Workshop1 SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA.
WFC3 PIPELINE CDR Jim Rose October 16, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 13 Science Data Processing
HST Quarterly Review Page 1 Space Telescope Science Institute 15 October 2003 SI Status: COS STScI COS Program Activity SubprojectSTScI Activity Instrument.
Implementation Review1 Archive Ingest Redesign March 14, 2003.
COS OPUS/HDA CDR Daryl Swade July 23, 2001Keywords and Associations Space Telescope Science Institute 1 of 14 Keywords and Associations.
23-Nov-1999STScI Projects Monthly Status Review1 of 8 SpaceTelescopeScienceInstitute COS Status Report for period December, 1998 to November, 1999 Tony.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 24 October 2007.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS TAGFLASH System Requirements Review CALCOS Requirements Philip E Hodge 14 December 2005.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 17 January 2002.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 September 1999.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 April 2002.
Keyes – 1 February 2000 : Slide 1 of 6 COS Monthly Status Review v OP-01 updates and revisions – STScI and IDT schedule and agenda for continuing COWG.
Introducing the INS Master Schedule Wayne Baggett.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 January 2003.
1 COS SI Testing and Delivery SI formally delivered to HSTP in May  N 2 purge alignment and NUV throughput testing pre- and post-ship  No effective alignment.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS Cosmic Origins Spectrograph 20 September 2001.
Cosmic Origins Spectrograph Monthly Status Review 17 April 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
Cosmic Origins Spectrograph Monthly Status Review 19 June 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 27 June 2002.
JWST Pipeline Overview
Single Object & Time Series Spectroscopy with JWST NIRCam
COS FUV Flat Fields and Signal-to-Noise Characteristics
STScI Ground System Development Status:
Presentation transcript:

SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph HST Quarterly Review – Instrument Status Charles D. (Tony) Keyes 30 June 2003

HST Quarterly Review Page 2 of 10 Space Telescope Science Institute 30 June 2003 SI Status: COS COS Integrated SI Aft End and Vent Covers

HST Quarterly Review Page 3 of 10 Space Telescope Science Institute 30 June 2003 SI Status: COS STScI COS Program Activity SubprojectSTScI Activity Instrument Development IDT/STScI MOU I & T Ball (Thermal-Vac support) Commanding and Scheduling System OP-01 Ops bench testing Pipeline and Calibration keyword development pipeline development SM4 initial planning User Support COS ETCs Instr. Handbook development COS activities are a traditional-mode, new HST instrument development project coordinated with IDT led by PI Jim Green (Colorado) STScI supports COS science operations by leading development of “front- end” (operations) and “back-end” (OPUS/MAST/calibration) ground system and user support functions..

HST Quarterly Review Page 4 of 10 Space Telescope Science Institute 30 June 2003 SI Status: COS STScI Support of COS Thermal-Vacuum Testing COS Thermal-Vac at Ball: 25 June-10 August  Per STScI/COS IDT MOU STScI will provide OPUS processing, conversion to FITS, and HDA-archival of all COS Thermal-Vac data  Processed comprehensive bench test data suite delivered by IDT (including target acquisition!)  Key MOU deliverable; output from all modes now tested in OPUS  OPUS is ready  All deliverables and mileposts of MOU now successfully completed

HST Quarterly Review Page 5 of 10 Space Telescope Science Institute 30 June 2003 SI Status: COS STScI Support of COS Thermal-Vacuum Testing (cont.) Active STScI Thermal-Vac requirements planning and participation  Close coordination of planned STScI support activities with IDT  All STScI IS supported the COS Pre-Environmental Review  Calibration activity splinters with IDT at Ball MSRs and telecons  Data transfer standards and procedures agreement with IDT; development and testing of data transfer process completed  STScI IS shift schedules finalized  STScI Instrument Scientists (Keyes, Sembach, Leitherer, Friedman, and Bohlin) will stand 6-day shifts during Thermal-Vac; Hartig will “float ”

HST Quarterly Review Page 6 of 10 Space Telescope Science Institute 30 June 2003 SI Status: COS STScI Ground Systems and User Support Activities STScI scheduling system  Code development of all science and calibration exposure modes complete  Bench testing of timing and commanding ongoing at Ball  Flat field commanding updates; now in implementation testing Delivered updated COS mini-Handbook; additional post-Thermal-Vac updates planned in August and schedule coordinated Target Acquisition and Spectroscopic requirements ready for ATP/ETC implementation STScI post-SM4 data volume study (includes significant COS section) completed SMOV4 requirements planning: Special Commanding requirements definition  Includes initial turn-on, anomalous recovery Calcos 1-d spectrum extraction and averaging routines tested COS Keyword Dictionary (adjunct to ICD-19) reviewed Testing of COS Phase II component of APT Supported STScI AAS COS display at Nashville meeting Supported COS Science Team meeting

HST Quarterly Review Page 7 of 10 Space Telescope Science Institute 30 June 2003 SI Status: COS COS Phase Development Plan (rev 8, 01/06/03) Phase 1 (1/1/00 – 6/30/00) 1.Macro Development 2.Reconfigurations Phase 2 (7/1/00 – 12/31/00) 3.NUV Timetag Mode + Darks 4.FUV Timetag Mode + Darks Phase 3 (1/1/01 – 6/30/01) 5.FUV & NUV Accumulation Science Exposures 6.FUV & NUV Target Acquisition Exposures 7.FUV & NUV Target Peakup Exposures Phase 4 (7/1/01 – 12/31/01) 8.Aperture Alignment Exposures 9.OSM1 Focus Alignment Exposures 10.OSM1 Rotation Alignment Exposures 11.OSM2 Rotation Alignment Exposures 12. FUV & NUV FP-Split Exposures Phase 5 (1/1/02 – 6/30/02) 13.FUV & NUV GO Wavelength Calibration Exposures 14.FUV & NUV Flat Field Lamp Calibration Exposures 15.FUV & NUV Automatic Wavelength Calibration Exposures 16.SAA Contours Phase 6 (7/1/02 – 12/31/02) 17.FUV & NUV BOP Target Screening Phase 7 (1/1/03 – 6/30/03) 18.FUV & NUV Flat Field Lamp Re-work 19.Coordinated Parallels Phase 8 (7/1/03 – 12/31/03) 20.OSM Heating Avoidance (if needed) 21.SMGT Preparations 22.SMOV Special Commanding 23.FUV & NUV Anomalous Recovery 24.FUV & NUV Initial Turn-on Phase 9 (1/1/04 – 6/30/04) 25.TRANS ovratalstart, ovratalend Phase 10 (7/1/04 – 12/31/04) 26.FUV & NUV Lifetime Adjustments