1 INTEGRATED DESIGN PROJECT BFC 43303

2 IDP NEEDS….. Architectural Drawing
Site Key Plan (Infrastructure) –make sure layout plan consists of site spot level (contour line), exist. utilities, exist. facilities, existing data extent beyond site boundary) Building Key Plan (Structure)- Floor key plan, side-front-back elevation, building cross section SI Report Bore Log, SPT value..etc MSMA (Manual Saliran Mesra Alam)- Design for surface runoff. Arahan Teknik Jalan JKR – Road design Building Work Specification – JKR Euro Code – Structure design

3 Documents to be submitted….
Infrastructure Earthwork Road and Drainage Sewerage Water reticulation Structure Compulsory Preliminary Report & Final Report Choose one

4 Drawing to be prepared…
Infrastructure Earthwork Key Plan Dwg- Slope, Retaining wall, DP or OSD, PL… Cut and fill Dwg- differentiate with colour Typical drawing detail Dwg- cross section for ; slope, retaining wall, earthwork. ESCP (Erosion Sediment Control Plan) Key plan Dwg. – propose temporary earth drain, silt trap, wash through, temporary crossing (drainage-culvert), site office location, hoarding, material storage, temporary excess. Typical detail Dwg- Silt trap, wash through, hoarding, temporary drain, slope protection Road and drainage (R&D) Key Plan Dwg.- combine for both road and drainage (include road alignment, location road signage, drain network, drain invert level (IL), shoulder, parking area, road furniture.. Typical Detail Dwg.-Pavement /Road thickness cross section, road signage, road furniture, side drain, drainage, sump, culvert and etc.. Sewerage Key Plan/Layout Plan – sewerage network, mainhole location, invert level, Detail Dwg.- mainhole, longitudinal cross section for pipe network include invert level, septic tank detail or STP.

5 Structure Water reticulation
Key Plan Dwg- consist of pipe network from tapping point to water tank, location of sluice valve, air valve, meter, hydrant (90m interval) Detail Dwg- sluice valve, air valve, meter, hydrant, Structure Foundation lay out Dwg- pilecap/pad footing/raft-include column loading Detail Dwg-reinforcement distribution for foundation Each floor layout Dwg- Include beam/column/slab label. Beam detail Dwg for each floor Column detail for the whole storey of building Slab detail layout Dwg for each floor Slab cross sectional for each floor Stair case detail Shear wall/Lift core detail if any

6 Preliminary report consists of:
Brief description of project-nos of storey, project total cost, project location, space usage…. Conceptual planning (sketch)-location of RC wall, silt trap location, beam/column/slab location, R&D location and etc… Standard and guideline to be used; MSMA, Arahan Teknik Jalan, Eurocode and etc… Parameters and data to be used; building loading case, soil bearing capacity, slope gradient, and etc Final report consists of: Detail description of project and team working Analysis and design Calculation – for structure manual calculation and software Drawig-key plan and detail Cost estimation-Bill of Quantities (BQ)-taking off… Appendices