1 FB 2 STARTING PROCEDURES RADIO MASTER SWITCH UP IS “ON” Assess readiness to get underway Energize the following: 1) Radio Master Switch, Panel DC-1 NOTE.

Similar presentations


Presentation on theme: "1 FB 2 STARTING PROCEDURES RADIO MASTER SWITCH UP IS “ON” Assess readiness to get underway Energize the following: 1) Radio Master Switch, Panel DC-1 NOTE."— Presentation transcript:

1 1 FB 2 STARTING PROCEDURES RADIO MASTER SWITCH UP IS “ON” Assess readiness to get underway Energize the following: 1) Radio Master Switch, Panel DC-1 NOTE This energizes the pre-adjusted, fixed mount radios (three Marine VHF radios and the LAFD “Astro” 800 MHz radio at the Chart Table).

2 2 FB 2 STARTING PROCEDURES Chart TableConsoles Forward and Aft Energize the following:

3 3 FB 2 STARTING PROCEDURES LAFD MOTOROLA (handheld) radio Energize the following:

4 4 FB 2 STARTING PROCEDURES Loudhailer Energize the following: CLOCKWISE for “ON”

5 5 FB 2 STARTING PROCEDURES ARDF, Forward Center Console Radio Direction Finder Energize the following:

6 6 FB 2 STARTING PROCEDURES UP FOR “ON” MIDDLE POSITION FOR “OFF” DOWN FOR EMERGENCY POWER SUPPLY Lighting (navigation and emergency) as needed SELECT DIRECTION OF TRAVEL

7 7 FB 2 STARTING PROCEDURES Emergency (blue) Lights

8 8 FB 2 STARTING PROCEDURES MDT on Chart Table

9 9 FB 2 STARTING PROCEDURES PITCH INDICATORS SET AT ZERO

10 10 FB 2 STARTING PROCEDURES VOITH ZERO PITCH

11 11 FB 2 STARTING PROCEDURES Verify green light(s) on Switchboard Monitoring Panel signifying Generator(s) ON LINE and Shore Power disconnected ILLUMINATED: SIGNIFIES STBD GEN ON LINE SHORE POWER ON LINE SHORE POWER AVAILABLE SHORE POWER CONNECTED PORT GEN RUNNING STBD GEN RUNNING PORT GEN ON LINE STBD GEN ON LINE

12 12 FB 2 STARTING PROCEDURES YELLOW LED INDICATOR LIGHTS ILLUMINATE TO SIGNIFY “READY FOR OPERATION” and “REMOTE OPERATION”  Verify that Main Engine MTUs in Pilot House indicate “READY FOR OPERATION” and “REMOTE OPERATION”

13 13 FB 2 STARTING PROCEDURES PRELUBE START PRELUBE COMPLETE Start Main Engines upon completion of PRELUBE sequence

14 14 FB 2 STARTING PROCEDURES MAIN ENGINE START Communicate with Mate at Bow; order “Cast off all lines” Proceed upon “All Clear” signal from Mate Start Main Engines upon completion of PRELUBE sequence

15 15 FB 2 STARTING PROCEDURES MATE In charge of deck operation Verify that Off Ship Alarm is turned to “OFF” position before Shore Power is turned off Assess Fireboat 2 for readiness to cast off Bow Watch Communication Pilot to Mate: “Cast off” Mate to Deckhands: “Cast Off” Mate to Pilot: “All clear to get underway”

16 16 FB 2 STARTING PROCEDURES