Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT Update To:DCIT Plenary From: Matt Maki Date: 03.14.2013.

Similar presentations


Presentation on theme: "Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT Update To:DCIT Plenary From: Matt Maki Date: 03.14.2013."— Presentation transcript:

1 Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT Update To:DCIT Plenary From: Matt Maki Date: 03.14.2013

2 Federal Aviation Administration Agenda MEM Trials Build 4.5 Limited Ops Summary MEM Schedule Update Build 6 Functional Testing Status EWR Trials Schedule/Activities EWR Participation 2

3 Federal Aviation Administration Build 4.5 Limited Ops Trials Complete DateCall SignFANS CPDLC DCLDCL Result Jan 17FDX303 KMEM-KMIACleared As Filed (CAF) Sent FD - WILCO Jan 18FDX303 KMEM-KMIACAF Planned - CancelledAC Mechanical Jan 22FDX9056 KMEM-KMEMCAF PlannedSW Failure – PTR Jan 29FDX303 KMEM-KMIACAF, UM79 SentFD – WILCO (2) Feb 8FDX993 KMEM-KOAKCleared As Filed (CAF) SentFD - WILCO Feb 14FDX303 KMEM-KMIACAF, UM79, UM79 SentFD – WILCO (3) Feb 21FDX303 KMEM-KMIACAF, UM79, UM79 SentFD – WILCO (3) Feb 26FDX303 KMEM-KMIACAF, UM79, UM79 SentFD – WILCO (3) March 5FDX303 KMEM-KMIACAF, UM79, UM79 PlannedHADDS Outage March 6FDX303 KMEM-KMIACAF, UM79, UM79 PlannedAFN, SW Failure 3

4 Federal Aviation Administration MEM Schedule Update – March 14 Planned MEM Schedule: -March 26: Start of 3 ops/day at MEM -April 30: Start of Full Ops 24x7 Trials at MEM Adjusted MEM Schedule Outlook: -Updated to reflect Patch 3 required PTR fixes -Mid April: Start of 3 ops/day at MEM -Now TBD: Start of Full Ops 24x7 Trials at MEM Firm Ops Schedule pending Critical PTR Patch 3 delivery/testing schedule from Thales Additional Build 7 New Requirement Development On- Going 4

5 Federal Aviation Administration Build 6 Functional Testing Update Functional Testing On-going at WJHTC and MEM: -Testing approx. 85%+ complete at WJHTC -Daily 4pm Telcon to review daily testing/PTR creation Build 6 Patch 3 planned to correct required functionality to begin 3 ops/day Trials at MEM: -Required PTR corrections identified by DCIT Ops Management Group Testing includes utilization of WJHTC, Boeing and Airbus bench avionics 5

6 Federal Aviation Administration MEM, EWR ATC Training ATC training underway at MEM: -Start 3/11, Finish 3/20 DTAP3 moved to EWR for first week in April: -EWR ATC Training under Harris DCIS tasking 6

7 Federal Aviation Administration EWR Trials Schedule/Activities EWR DTAP4 Hardware scheduled for pickup at Thales on March 15: -Will be driven to EWR ATCT -Build 6, EWR Adaptation installed -Space NCP approved EWR DTAP4 equipment, cables and display installation at EWR ATCT confirmed for the week of March 18 Team met with UPS on March 6 in Louisville: -UPS confirmed EWR Trials participation -UPS to provide live aircraft for ramp FANS/DCL testing during Pre-SAT and SAT testing at both MEM and EWR -Initial MOU comments back from UPS 7

8 Federal Aviation Administration Additional EWR Participation Initial planning telcon meeting scheduled with British Airways on March 18: -2 B777 daily FANS EWR ops -BAW currently utilizes 623 DCL service at LHR and Gatwick -BAW to assigned grounded pilots to effort 8

9 Federal Aviation Administration Questions ? KUSA