Presentation is loading. Please wait.

Presentation is loading. Please wait.

Data Link Communications

Similar presentations


Presentation on theme: "Data Link Communications"— Presentation transcript:

1 Data Link Communications
AC C and A056 operational authorization update OSWG Mark Patterson, FAA, AFS-470 18 March 2015

2 Overview U.S. domestic data comm program update AC 120-70C
8900.A056 Notice and A056 templates Upcoming work

3 Services Strategy Segment 1 Phase 1 - Tower Service Avionics
CY Segment 1 Phase 1 - Tower Service Departure Clearance IOC Departure Clearances (DCL) IOC FANS 1/A transitioning to ATN Avionics Future Air Navigation System (FANS) Ground System Aeronautical Telecommunications Network (ATN) IOC 3 3 3 3 3

4 Services Strategy Segment 1 Phase 1 - Tower Service Segment 1 Phase 2
CY Segment 1 Phase 1 - Tower Service Departure Clearance IOC Departure Clearances (DCL) Segment 1 Phase 2 - En Route Services Initial En Route Services Transfer of Communications Initial Check-In Altitudes / Altimeter Settings Go Button / Airborne Reroutes Pilot Initiated Downlinks Controller Initiated Routes (Limited) Direct-to-Fix (Limited) Crossing Restrictions (Limited) Advisory Messages (Limited) Holding Instructions (Limited) Speed and Headings Beacon Codes Stuck Microphone Tailored Arrivals (Limited) Data Comm Routine Communications IOC TFM Data Comm Reroutes Data Comm Routine Communications Follow- On En Route Services Tailored Arrivals FANS 1/A over VDL-2 transitioning to ATN Avionics Future Air Navigation System (FANS) Ground System Aeronautical Telecommunications Network (ATN) Full tailored arrivals, holding instructions, advisory messages 4D Trajectories D-TAXI Segment 2 - Advanced Services IOC 4 4 4 4 4

5 U.S. domestic CPDLC-DCL trials - overview
Started in KMEM Two locations: KMEM – ops / day KEWR – 60 ops / day (~10% of all departures) Participants Part 121: FEDEX, UPS, UAL Part 129: Operators: BAW, SAS (pending CAA approval) FANS 1/A (CPDLC) and not PDC (ACARS) Initial and revised departure clearances Required equipage FANS 1/A (CPDLC) VDL M0/A Continue until 1Q 2016

6 CPDLC-DCL - waterfall schedule (as of 29 Jan 2015)

7 Questions?

8 AC C – current status Feb ‘14 - briefed AC B & A056 template revision project AFS-470 / DCIT / PARC CWG collaborated to produce a limited-scope revision: New format (ICAO) and editorial changes Domestic CPDLC DCL and European Link added Updates event reporting to reflect GOLD Minor changes to authorization process (roles & responsibilities) Highlight - Part 91 operators will not be required to have operational authorization (A056) for U.S. CPDLC-DCL DCIT – Data Comm Implementation Team PARC CWG – Performance-based Aviation Rulemaking Committee Comm Working Group GOLD – Global Operational Data Link Document CPDLC – Controller Pilot Data Link Communication

9 AC C - current Status Posted for public comment on March 17, 2015 30-day comment period Due April 16, 2015 (no time extensions) Comments out-of-scope will be held for next revision Parallel AFS formal coordination began After 30-day window Immediately adjudicate comments AFS-400 approves adjudication To tech writers for publication Review current version of draft AC C (if desired)

10 Questions?

11 A056 templates - current Status
Operational Authorization (OpSpec / Mspec / LOA) A056 & Notice Entered into AFS formal coordination on March 17, 2015 Highlights Deleted the requirement for aircraft to be equipped with an approved collision avoidance system that is on and operating Part 91 - references related to data comm operation within the U.S. has been deleted. Operators will not need operational authorization for U.S. domestic CPDLC-DCL Review Notice and draft templates

12 Part 129 Part 129 will not require a separate A056
CAA approval / authorization will be annotated on A003 Review draft A003 template

13 Take aways… Do not wait for the revised AC before submitting data link authorization applications. Applications being submitted (or already in approval process) referencing AC B will still be processed Delaying applications will cause delays in receiving authorization (and inability to participate in DCL ops at IOC) Operators with existing A056 Prepare your training and crew procedure documentation now so you can respond quickly when the Notice is published

14 Next steps AC 90-[datacomm] project Includes: AC 120-70C incorporated
New guidance PBCS FANS / ATN B1 / B2 (as available) Post-implementation monitoring Compliance determination Streamlined application process for Part 91 OpSpec / MSpec / LOA template updates Additional guidance / training material as necessary

15 Questions?

16 Back-up slides

17 U.S. domestic DCL trials - specifics
Uses a stand-alone DCL Trials Automation Platform System (DTAP). Processes participating operators initial / revised DCL aircraft clearances independent of the current FAA Terminal Data Link Services (TDLS) system. Interfaces with the Tower ARTCC Host ATM Data Distribution System (HADDS) interface to receive NAS flight data. The ATC Clearance Delivery position hosts a dedicated DTAP DCL display and user interface.

18 U.S. domestic DCL trials - specifics
Participating FANS1A / FANS1A+ equipped aircraft log into the DTAP via CPDLC. Once the link is established, the flight deck requests and receives its initial departure clearance and any revisions to that clearance using CPDLC.

19 Operator timelines


Download ppt "Data Link Communications"

Similar presentations


Ads by Google