Presentation is loading. Please wait.

Presentation is loading. Please wait.

ANGELFIRE… PROVEN PERFORMANCE! Possible Architectures And External Interface Specifications Presented to Program Office 16 SEP 04 (Team 3)

Similar presentations


Presentation on theme: "ANGELFIRE… PROVEN PERFORMANCE! Possible Architectures And External Interface Specifications Presented to Program Office 16 SEP 04 (Team 3)"— Presentation transcript:

1 ANGELFIRE… PROVEN PERFORMANCE! Possible Architectures And External Interface Specifications Presented to Program Office 16 SEP 04 (Team 3)

2 ANGELFIRE… PROVEN PERFORMANCE! Mission Needs Statement Needs –Sea-based precision strike cell (FPSC) –Communication between FPSC and all NATO air assets –Multi-path communication network –Integration with MASSTIC –Damage assessment capability

3 ANGELFIRE… PROVEN PERFORMANCE! Architecture One

4 ANGELFIRE… PROVEN PERFORMANCE! Architecture One Advantages and Disadvantages Advantages –Fits existing ATO structure –Ample manning to meet requirements –Centralized functionality – “it’s all here” Disadvantages –Large footprint: extensive manning, square footage, administrative requirements –Centralized functionality does not enhance network-centric warfare

5 ANGELFIRE… PROVEN PERFORMANCE! Architecture Two DATA SYSTEMS: - SIPRNET -NIPRNET -CWAN -Link 11 -Link 16 -VoIP Telephones -GCCS Voice Systems: -VHF Nets -HF Nets -UHF Nets -Multi Channel Voice Air, Ground, Human, and Sig Intel Database mngt Target acquisition BDA Joint and Coalition Assets Precision Strike Cell «extends» Planning «extends» Tasking «extends» ControlSupport «extends» CAOC «extends» «uses» Air Operations «extends» Offense Support Defense Communications Satellite Systems Multiplexers «uses» Data Systems VTC DSN

6 ANGELFIRE… PROVEN PERFORMANCE! Architecture Two Advantages and Disadvantages Advantages –Smaller footprint: easier to meet manning, square footage, administrative requirements –Enables real-time task-to-target-kill loop –Emphasizes connectivity and network-centric warfare –Easier to upgrade Disadvantages –Does not fit in well with existing ATO planning process – possibly too responsive –FPSC may become task-saturated earlier than in other architectures –Very reliant on rest of network

7 ANGELFIRE… PROVEN PERFORMANCE! Architecture Three By Function Administration Legal Advisors 2 Secret VoIP Phones 2 SIPR seats 2 NIPR seats 2 Tables 3 Chairs Intelligence: Officers: 3 Air Int 2 Hum Int 3 Sig Int Equipment: 3 JWICCS 3 SIPR 2 TS MSG 2 NIPR 2 STU III 3 SIPR VoIP 3 Tables 6 chairs Operations: Officers: Battle CAPT 3 Air Ops 3 SWOs Ops Chf Ops Clrk Equipment: 3 SIPR 2 TS MSG 2 NIPR 2 STU III 3 SIPR VoIP 3 Tables 6 chairs Supply and Logistics: Officers: Aviation Supply Naval Logistics Equipment: 2 SIPR VoIP Phones 2 NIPR seats 1 Table 1 Chair Public Affairs and Future Ops PAO C3 Rep Fut Ops Chf Clrk 2 SIPR seats 2 SIPR VoIP Phones Comms: 3 Comm O’s -3 SIPR seats -2 NIPR seats -1 VTC -3 Tables -4 Chairs -Projector -Screen -3 SIPR VoIP Phones -1 Red Phone -Interface for all Comm Systems -Helpdesk -Network Supt CAOC FPSC C1 C2 C3C4 CO XO C5 C6

8 ANGELFIRE… PROVEN PERFORMANCE! Architecture Three Advantages and Disadvantages Advantages –Clear division of responsibilities and functions –Ample manning for contingencies –Centralized functionality Disadvantages –Structure potentially rigid and unresponsive to evolving needs –More difficult to upgrade systems or organization –Substantial admin, manning and square footage requirements

9 ANGELFIRE… PROVEN PERFORMANCE! Systems Interfaces: –Navy’s Maritime ACCS Ship/Shore Tactical Interface Component (MASSTIC) –Air Force’s Integrated Air Defense Command (IADC) –Army’s Air Operations Coordination Center (AOCC) –RPC net for real-time Radar Air Picture (RAP) –DISN Services –Battlefield Information, Collection, and Exploitation System (BICES) Open systems architecture Interoperability with legacy systems Interoperability with Coalition Systems

10 ANGELFIRE… PROVEN PERFORMANCE! Questions?


Download ppt "ANGELFIRE… PROVEN PERFORMANCE! Possible Architectures And External Interface Specifications Presented to Program Office 16 SEP 04 (Team 3)"

Similar presentations


Ads by Google