1 Final Year Project 1 (FYP 1)
IAS 3232 Final Year Project 1 (FYP 1)

2 FYP MOTIVATION

3 FYP INTRODUCTION FYP is a course that examine the competency and skill level of student in handling a real project that relate to their study field. Student are allow to apply the knowledge that they gain throughout their study as a whole while they are undergo FYP.

4 FYP and fcsit, UNISEL FYP in FCSIT categorized under either in one of the following department: Department Computer Science Cluster Software Engineering Cluster Computer Science Cluster Applied and Industrial Computing Cluster Data Communication and Network Department Information Technology Cluster Management Information System Cluster Multimedia

5 FYP Structure FYP 1 (14 weeks) FYP 2 (14 weeks) Project Proposal
Prepare project proposal (independently) Duration: 2 weeks Project Documentation 1 Conduct investigation regarding the topic and prepare documentation for presentation Produce prototype Duration: 12 weeks Project Documentation 2 Develop and implementation of project that proposed during FYP 1 Duration: 14 weeks

6 FYP 1 course planning Refer Planning – FYP 1

7 Stage 1: Project initial topic
Student are expected to formulate their topic INDEPENDENTLY. (done) Topics sent to the dedicated cluster/department for their initial approval (week 2) Based on initial approval, SV will be suggested by department and confirmed by TDA SV list will be released to SV and Students (by week 2)

8 Stage 2: Project proposal preparation
Discuss with SV to refine the topic and provide the following details regarding your project: Title Introduction Problem Statement Objective Scope Methodology Significance Refer guideline for the detail description of each required section.

9 Stage 3: project proposal approval/evaluation
Project proposal will be send to SV for the recommendation/approval before proceed with project 1 report. Due date: week 5

10 Stage 4: fyp1 report preparation
Duration given- 6-11 Discuss with SV on the topic and FYP 1 report writing Refer guideline for the detail description of each required section. provide the following details regarding your project : Chapter 1: Introduction Chapter 2: Literature review Chapter 3: Research Methodology Chapter 4: Analysis Chapter 5: Design References

11 Stage 5: fyp 1 presentation
Week 12 – presentation Presentation estimated to be conducted for 3 days (based on students and assessor availability. Presentation detail will be further discussed during week 10

12 Stage 6: correction submission
Week : students need to make correction and get the concern from their SV. SV will check the correction based on the comment given by assessor.

13 PROJECT PROGRESS EVALUATION
Student are required to meet their SV every week to get their guidance and present their progress. Refer project log book. You are required to meet supervisor every week and fill up the form. (fill up the form before meet and check together with your SV. Log book for each week need to submitted to admin office (will provide a box). You are not allowed to submit in bundle. Every end of the week the box will be collected by coordinator (marks on progress based on this).