Presentation is loading. Please wait.

Presentation is loading. Please wait.

Investment & Facilities Needed (New Plant)

Similar presentations


Presentation on theme: "Investment & Facilities Needed (New Plant)"— Presentation transcript:

1 Investment & Facilities Needed (New Plant)
Truck P400,000 Decorticating Machine P360,000 Baling Machine P250,000 Operating Capital P500,000 Transformers P120,000 Total 1,630,000 Facilities Minimum 1 hectare land processing area 500 sq.m. covered area Near ample water resource Near Three Phase Electrical Line

2 Processing of Husks into Erosion Control Nets
COCONUT HUSK Decorticating De-fibering & Drying Machine Fiber (30%) Weaving Ropes/Twined Fiber Twining

3 Feasibility study of a small Decorticating Machine
Direct operating cost per day * (2003) Qty. Description Unit Cost Total 7000 Husks 0.05 350.00 Hauling 0.13 910.00 5 Labor 160.00 800.00 Electricity/fuel 750.00 1000 Drying 0.25 250.00 Baling 0.15 150.00 220 Bagging 1.50 330.00 Supervision P3,790.00

4 Feasibility study of a small Decorticating Machine
Estimated Sales per day *(2003) Produce Unit Price Total 1,000 kg of fiber 5.5 5,500.00 220 bags of cocopeat 15 3,300.00 Profit 8,800.00

5 Per month Feasibility Study of a Small Decorticating Machine
ONE MONTH OPERATION (2003) ONLY RAW FIBER Per month Projected Expenses Projected Income HUSKS (182,000) 9100 HAULING 40,950 LABOR 23,400 ELECTRICITY 19500 DRYING 6500 BALING 3900 BAGGING 8580 SUPERVISOR 8000 BOOKEEPER/CLERK 6000 Misc.Off. Expenses 5,500 Maintenance/Depreciation 8300 TOTAL 139,730 Fiber (26 tons) 143,000 Cocopeat 5720 sacks 85,800 TOTAL 228,800

6 Additional expenses Net
Additional Cost for Netmaking Additional expenses Net Additional Income from Nets Twining 400,000 Weaving 175000 Transport 25000 Other Costs 35000 635,000 Add Fiber Cost 774,730 Nets/P20 per sq. meter 857,000 Add Cocopeat 85,800 Total 1,085,800

7 Potential Demand for Coconut Fiber Nets
Potential market for geo-textiles (in pesos) Location Potential Erosion Control Market Amount for Geo-textiles Amount Paid to Workers Producing Geo-textiles Ripple Effect on the Communities Philippines 600 M 240 M 144 M 720 M China & APEC Countries 21 B 5 B 3 B 15 B MALACANANG MEMORANDUM CIRCULAR 25

8 Total Number of Farmers
Coconut Statistics of Bicol Peninsula CY 2003* Province/Town Coconut Area Bearing Trees Total Nut production Total Number of Farmers Albay 99,940 9,163,292 503,981,060 46,823 Camarines Sur 203,282 19,520,892 1,073,649,060 94,274 Camarines Norte 100,086 7,557,178 415,644,790 23,393 Sorsogon 97,738 7,762,746 426,951,030 49,840 Total * Source: Philippine Coconut Authority

9 YEARLY PRODUCTION TARGETS
Unit Year 1 Year 2 Year 3 Raw Fiber tons 2,400 4,800 7,200 Nets sq.m 2,400,000 4,800,000 7,200,000 Rubberized Products 200 400 600 Cocopeat 14,400 21,600


Download ppt "Investment & Facilities Needed (New Plant)"

Similar presentations


Ads by Google