Presentation is loading. Please wait.

Presentation is loading. Please wait.

Content Standard for Last-Mile Alert and Notification Sharing Knowledge on Disaster Warning, with a focus on Community-based Last-Mile Warning Systems.

Similar presentations


Presentation on theme: "Content Standard for Last-Mile Alert and Notification Sharing Knowledge on Disaster Warning, with a focus on Community-based Last-Mile Warning Systems."— Presentation transcript:

1 Content Standard for Last-Mile Alert and Notification Sharing Knowledge on Disaster Warning, with a focus on Community-based Last-Mile Warning Systems Sarvodaya Head Quarters, Moratuwa, Sri Lanka 28th-29th Mar 2007 Nuwan Waidyanatha 12 Balcombe Place, Colombo 08, Sri Lanka Tel: +94 (0)773 710 394 Email: waidyanatha@lirne.net

2 The general objective is to evaluate the suitability of five ICTs deployed in varied conditions for their suitability in the last mile of a national disaster warning system for Sri Lanka and possibly by extension to other developing countries. HazInfo Research Matrix for Pilot Project

3 Communication System under Scrutiny

4 Example of Input Message to the last-Mile Hazard Warning System TEST TEST TEST TEST TEST TEST TEST TEST TEST TEST TEST TEST TEST Last-Mile HazInfo Simulation. No Repeat No Real Event is Effect TROPICAL CYCLONE ADVICE NUMBER 001 Issued at 09:55 am on Monday, December 11, 2006 BY Anonymous A SEVERE CATEGORY 4 CYCLONE is now current for AMPARA and MATARA District coastal areas. At 06:00 am local time SEVERE TROPICAL CYCLONE MONTY was estimated to be 80 kilometres northeast of Ampara District and moving southwest at 10 kilometres per hour. Severe Tropical Cyclone Monty is expected to cross the coast in the vicinity of Ampara and Matara Districts during Monday. Gales with gusts to 180 kilometres per hour are likely in coastal communities in Ampara and Matara District during the day. This is to alert the residents of Ampara and Matara District about the potential of a very dangerous storm tide as the cyclone centre approaches the coast. Tides are likely to rise significantly above the normal high tide mark with very dangerous flooding, damaging waves and strong currents. Widespread heavy rain and further flooding are likely in southern parts of the Ampara and Matara Districts over the next few days. TEST TEST TEST TEST TEST TEST TEST TEST TEST TEST TEST TEST TEST Last-Mile HazInfo Simulation. No Repeat No Real Event is Effect.

5 Example of Output Message from Hazard-Information-Hub to the Last-Mile HIH-2006-12-11T143500 hih@sarvodaya.lk 2006-12-11T10:20:25.0000000+06:00 Exercise Alert hazard@lirne.net Restricted en-US Meto Cyclone Prepare Expected Severe Observed At 06:00 am local time SEVERE TROPICAL CYCLONE MONTY was estimated to be 80 kilometers northeast of Ampara District and moving southwest at 10 kilometers per hour. Severe Tropical Cyclone Monty is expected to cross the coast in the vicinity of Ampara and Matara Districts during Monday. Gales with gusts to 180 kilometers per hour are likely in coastal communities in Ampara and Matara District during the day. This is to alert the residents of Ampara and Matara District about the potential of a very dangerous storm tide as the cyclone centre approaches the coast. Tides are likely to rise significantly above the normal high tide mark with very dangerous flooding, damaging waves and strong currents. Widespread heavy rain and further flooding are likely in southern parts of the Ampara and Matara Districts over the next few days.

6 MTTF of Communities with Addressable Satellite Radios

7 Mobile Phone MTTF

8 CDMA 1x_RTT Fixed Phones

9 Remote Alarm Device MTTF

10 Control Village MTTF

11 Sigmoid Scaling Function for Language Diversity Study the Effectiveness of ICT as a Warning Technology ValueFuzzy Rule 1.00Sinhala, Tamil, & English 0.95Sinhala & Tamil 0.85Sinhala & English 0.70Sinhala Only 0.50Tamil Only 0.20English Only 0Otherwise ICT / Measure ASR RAD MP FP VSAT Language Diversity (‘si’, ‘tm’, ‘en’) 0.20 1.00 0.20 Full CAP (‘XML’)0.850.70 0.800.20 Mediums (audio, text)0.950.85 0.950.85 Rating0.530.340.900.450.03 Silent-Test = {Sinhala, Tamil, & English} Live-exercises = {ENGLISH}

12 Sigmoid Scaling Function for Full CAP Compliance ValueRules 1.00All sub elements that are contained in the element, which includes all the qualifier and sub elements 0.95Mandatory defined in the Profile for Sri Lanka, which are the sub elements of the qualifier qualifier and elements --,,, 0.85Mandatory sub elements of the qualifier element and the sub element 0.70 only 0.50Mandatory sub elements of the element only 0Otherwise Study the Effectiveness of ICT as a Warning Technology ICT / Measure ASR RAD MP FP VSAT Language Diversity (‘si’, ‘tm’, ‘en’) 0.20 1.00 0.20 Full CAP (‘XML’)0.850.70 0.800.20 Mediums (audio, text)0.950.85 0.950.85 Rating0.760.340.900.450.03

13 Effectiveness of ICTs as a Warning Technology Interface HIH Monitor issued CAP Message Receiver Device and {Medium} ICT Guardian received Message elements Community Executed ERP DEWN Internet Browse sub element with en … {no size restriction} si … {no size restriction} tm … {no size restriction} MP {Text} “Warning” en A SEVERE CATEGORY 4 CYCLONE… si …{sinhala} tm … {tamil} {restricted by 130 characters} Tsunami Evacuation RAD {Text} ANNY Internet Browser (AREA) All sub elements in element and message in en only. AREA – B {Text} Alert restricted hih exercise met expected sever observed A SEVERE CATEGORY 4 CYCLONE … {restricted 250 characters} Tsunami Evacuation IPAS Internet Browser with en only … {no size restriction} Personal Computer {Text} A SEVERE CATEGORY 4 CYCLONE … {no size restriction} Not Applicable CDMA 2000 1x_RTT … {no size and language restriction} CDMA2000 1x_RTT Telephones {Audio} A SEVERE CATEGORY 4 CYCLONE …{no size restriction} Tsunami Evacuation

14 Sigmoid Scaling Function for -- Mix of Audio and Text Communication Medium Study the Effectiveness of ICT as a Warning Technology ValueFuzzy Rule 1.00Audio and Text 0.95Audio only 0.85Text only 0Otherwise ICT / Measure AREA RAD MP FP VSAT Language Diversity (‘si’, ‘tm’, ‘en’) 0.20 1.00 0.20 Full CAP (‘XML’)0.850.70 0.800.20 Medium (audio, text) 0.950.85 0.450.85 Rating0.840.280.900.760.03

15 Reliability and Effectiveness of the ICT Reliability is measured as the difference between the time it takes ICT Guardian to “receive” message and the time the message was “received” by the ICT Provider. Study the Reliability of ICT as a Warning Technology ICT / Measure AREA RAD MP FP VSAT Reliability0.840.280.900.45- Effectiveness (Complete CAP Messaging only) 0.760.120.590.760.03 Rating0.630.340.530.34-

16 Discussion of the Hypothesis 1. Stage 4 & 5 Sarvodaya villages that are more organized, i.e., have a formal structure that enables coordination and direction of activities will respond more effectively to hazard warnings than less organized stage 1, 2 & 3 villages. 2. Villages that are provided training in recognizing and responding to hazards along with deployment of ICTs will respond more effectively to hazard warnings than villages that received no training. 3. Villages that have ICTs deployed for dissemination of hazard information will respond more effectively to hazard warnings than villages that have to rely on their existing channels of information for warnings. 4. ICTs that in addition to their hazard function, can also be leveraged in other areas to enrich the lives of the villages will potentially have lower downtime than ICTs that are poorly integrated into the day to day life of the beneficiaries.


Download ppt "Content Standard for Last-Mile Alert and Notification Sharing Knowledge on Disaster Warning, with a focus on Community-based Last-Mile Warning Systems."

Similar presentations


Ads by Google