Presentation is loading. Please wait.

Presentation is loading. Please wait.

APAN Regional Network Meeting, Busan, S Korea, 26th Aug 2003 SEA REN By Borhanuddin Mohd Ali, UPM.

Similar presentations


Presentation on theme: "APAN Regional Network Meeting, Busan, S Korea, 26th Aug 2003 SEA REN By Borhanuddin Mohd Ali, UPM."— Presentation transcript:

1 APAN Regional Network Meeting, Busan, S Korea, 26th Aug 2003 SEA REN By Borhanuddin Mohd Ali, UPM

2 APAN Regional Network Meeting, Busan, S Korea, 26th Aug 2003 INTRODUCTION Very much an Things To Do list, Very much an Things To Do list, Agreement has just been wrapped up between Malaysia and TEIN, Agreement has just been wrapped up between Malaysia and TEIN, Not much of intra regional collaboration for now, but SEA REN is about to change that. Not much of intra regional collaboration for now, but SEA REN is about to change that.

3 APAN Regional Network Meeting, Busan, S Korea, 26th Aug 2003 South East Asia Hub (TH, MY, SG, ….) North East Asia Hub (JP, KR, CN, ….) Europe (Geant) North America (Internet 2, CA, *net) China Korea Japan Thailand Malaysia Singapore Taiwan Philipines Indonesia Oceania Hub Next Generation Internet in Asia: SEA Next Generation Internet and NEA Next Generation Internet SEA Next Generation Internet NEA Next Generation Internet Access Point Vietnam B-band Linking NEA to SEA

4 APAN Regional Network Meeting, Busan, S Korea, 26th Aug 2003 TEIN Participation of South East Asia countries in TEIN 2 will be through connectivity with Korea, Participation of South East Asia countries in TEIN 2 will be through connectivity with Korea, Malaysia will become the central hub for participating SEA countries and will carry traffic from participants, Malaysia will become the central hub for participating SEA countries and will carry traffic from participants, KR-MY backbone can be either a PVC 45 Mbps Port ATM Backbone Transport layer or a 45Mbps IPLC (International Private Leased Circuit) KR-MY backbone can be either a PVC 45 Mbps Port ATM Backbone Transport layer or a 45Mbps IPLC (International Private Leased Circuit)

5 APAN Regional Network Meeting, Busan, S Korea, 26th Aug 2003 SEA-REN Connections to ASEAN countries can start with 2 Mbps (??) Port ATM backbone Transport layer with actual bandwidth changes subject to requirements, Connections to ASEAN countries can start with 2 Mbps (??) Port ATM backbone Transport layer with actual bandwidth changes subject to requirements, Connections are bilateral links with half circuit provided, maintained and managed by Malaysia and the other half circuit by respective countries, Connections are bilateral links with half circuit provided, maintained and managed by Malaysia and the other half circuit by respective countries,

6 APAN Regional Network Meeting, Busan, S Korea, 26th Aug 2003 SEA-REN

7 Network Operations Center (NOC) NOC will be the center of operations operating the core network connectivity and offering extra services (IPv6, GRID), NOC will be the center of operations operating the core network connectivity and offering extra services (IPv6, GRID), Proposed location of the NOC: Proposed location of the NOC: –Multimedia Development Corporation (MDC) within Cyberjaya Equipment for additional services will be placed in the same vicinity such as DNS, DNSv6, Web servers, Webv6 servers, video conferencing equipment, GRID (schedule servers, etc). Equipment for additional services will be placed in the same vicinity such as DNS, DNSv6, Web servers, Webv6 servers, video conferencing equipment, GRID (schedule servers, etc).

8 APAN Regional Network Meeting, Busan, S Korea, 26th Aug 2003 Network Operations Center Proposed SEA-Hub Management Committee Proposed SEA-Hub Management Committee –Membership, policies and other matters to be discussed and decided by a pro-tem committee comprising of EU, Korea, Malaysia and selected members from SEA countries Managed by a full-time Director and Technical Staff, Managed by a full-time Director and Technical Staff, 24 X 7 Operations, 24 X 7 Operations, Hot-line Call Centre for Crisis Management, Hot-line Call Centre for Crisis Management, Web Portal for Communication between end-users and technical team Web Portal for Communication between end-users and technical team

9 APAN Regional Network Meeting, Busan, S Korea, 26th Aug 2003 NOC (Basic Layout)

10 APAN Regional Network Meeting, Busan, S Korea, 26th Aug 2003 Implementation Timeline (Technical) Phase 1 encompass the Phase 1 encompass the 1.Development of the SEA Hub infrastructure (NOC) 2.Provisioning of the 45Mbps Malaysia- Korea link 3.Setup of web portal Phase 2 encompass the formation of SEA-REN (links to SEA) Phase 2 encompass the formation of SEA-REN (links to SEA)

11 APAN Regional Network Meeting, Busan, S Korea, 26th Aug 2003


Download ppt "APAN Regional Network Meeting, Busan, S Korea, 26th Aug 2003 SEA REN By Borhanuddin Mohd Ali, UPM."

Similar presentations


Ads by Google