Presentation is loading. Please wait.

Presentation is loading. Please wait.

TH 5 Mississippi River Bridge Design-Build Project S.P

Similar presentations


Presentation on theme: "TH 5 Mississippi River Bridge Design-Build Project S.P"— Presentation transcript:

1 TH 5 Mississippi River Bridge Design-Build Project S.P. 6201-86
PROJECT INFORMATIONAL MEETING The initiative started May 5th with D-B & has grown to include other contracting & construction methods & concepts plus now we’re involved in innovative financing, FAST Lanes, and Toll Roads. Michael Beer, P.E. MnDOT Project Manager February 8, 2013

2 DISCLAIMER What is discussed today is informational only; it is meant to assist interested teams in the pursuit of this project. The ultimate Contract requirements will be included in the Request for Proposals (RFP). There may be changes between now and the time – if any – that the RFP is issued. It is fully expected that an RFP will be issued for this project, but it cannot be guaranteed. Our Lt. Governor and our Commissioner was repeatedly said

3 DESIGN-BUILD INFORMATION
Peter Davich Design-Build Program Manager MnDOT OCIC/Technical Support Our Lt. Governor and our Commissioner was repeatedly said

4 Design-Build Low Bid Two Part Low Bid
RFQ issued, 2-5 “most highly qualified” teams shortlisted. RFP will be issued following shortlisting. ATCs will be accepted; considering 5 per team A ‘technical proposal’ is still required, but it is only the legal forms. This must be determined responsive Stipends of $35,000 will be granted to teams who submit responsive price proposals The contract will be awarded to the lowest bidder that meets all Contract requirements. So what give Mn/Dot the “Go Ahead to do Design-build?”

5 Procurement Relatively Short Schedule RFQ Issued on 2/7/13
Single Point of Contact – Michael Beer. Let him know if you would like to receive clarifications/addenda. Clarifications and Addendums posted to DB website Submit SOQ electronically to Peter Davich

6 Procurement Timeline RFQ Clarifications Due: Feb 28, 2013
SOQ Due March 08, 2013 Short-List March 28, 2013 Issue RFP April 04, 2013 DBE Meet and Greet TBD Tech Proposal (Legal Package) Due: June 3, 2013 Price Proposals Due June 14, 2013 Letting June 14, 2013 Anticipated Contract August 15, 2013 So what give Mn/Dot the “Go Ahead to do Design-build?”

7 Information Sources Information Sharing Project ftp website:
ftp://ftp2.dot.state.mn.us/pub/outbound/ocic/TH5_ / Design-Build website: One-on-one meetings. Contact Michael Beer with all TH 5 Project questions: Contact Peter Davich with all DB programmatic questions: So what give Mn/Dot the “Go Ahead to do Design-build?”

8 Conflict of Interest Approach Posted on Website:
All teams are responsible for reading, understanding, and following this approach. MnDOT Retained GEC Consultants PB, SEH, Pierce Pini Listed in Section 2.7 of RFQ So what give Mn/Dot the “Go Ahead to do Design-build?”

9 PROJECT INFORMATION TH 5 Mississippi River Bridge DB
Michael Beer, MnDOT Metro District Project Manager Our Lt. Governor and our Commissioner was repeatedly said

10 Project Partners City of St. Paul and Minneapolis
Ramsey and Hennepin County Fort Snelling and DNR parks Federal Highway Administration Capital Region and Minnehaha Watershed Districts Design-Build Proposers PB – Design-Build Contract Development Our Lt. Governor and our Commissioner was repeatedly said

11 Project Information So what give Mn/Dot the “Go Ahead to do Design-build?”

12 Project Description General Layout Roadway CPR Bridges Parks
Staging Area

13 Project Description River Bridge Re-deck Construct from above
Ornamental Lights Sidewalk Railing Repaint Structural Analysis

14 Project Description River Bridge (cont.) 3 Bridge Deck Repairs
Bearings Pier concrete repairs Steel repairs 3 Bridge Deck Repairs Mississippi Blvd. Edgcumbe Road

15 Project Description Bike and Pedestrians – local and extended detours

16

17 Project Description General Layout

18 Design-Build General Discussion Points
No Co-Housing DBE Goal will be determined at RFP Outreach Meeting Quantity Risk for Repair Work Oversight Contract

19 Project Goals A safe work environment
Avoid or minimize construction related impacts Provide a safe and understandable pedestrian detour Quality project Ensure that the River Bridge is structurally sound through analysis and design Minimize impacts to the environment Substantial Completion by September of 2015 Complete the project within budget Innovative ideas to shorten schedule, cost, etc.

20 Questions ?