1 Launch Readiness Review River Rock 2010 University of Puerto Rico June 9, 2010

2 Lauren Colón Lisandra Cordero Pedro J. Dávila Luis García Rafael Gavilanes Gladys Muñoz Laura Obén Marilena Ortíz Oscar Resto Ozzie Resto Esteban Romero Noel Sánchez Verónica Zayas Team Members:

3 User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A

4 User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A

5 User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A

6 User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A

7 User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A

8 User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A Type of RestrictionRestrictionStatus Mass allotment:19.6 lbs Volume allotment:Full Canister The payload’s center of gravity (CG):Yes Activation met under requirement: (either 1.SYS.1 or 1.SYS.2) Yes 1.SYS.1 Structure mounts:Top and bottom bulkheads Sharing:NO Sharing Atmospheric exhaust line with the MinnSpec University of Minnesota experiment.

9 Our canister is already fully integrated. We are still working on our software. We expect to have everything done before next Wednesday. Final Cleaning and assembly will be perform on Friday June 11. User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A

10 Test: We completed the Pressure Tight Seal. We found some leakages, but they were corrected. User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A

11 We are ready! We are still working on some minor details of the software, but we expect to solve them this weekend. User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A

12 Software –We will be ready! User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A

13 Are you ready for Wallops? –What tools do you plan to bring? Digital Volt Meter, Oscilloscope, Hand Drill, Drills, Whrenches, Gloves, Kin wipes, Antistatic Pads, Utility Knife, Clippers, Soldering Iron and Tin, etc, etc, etc……. –What tools are you assuming you have at your disposal? Anything that will not affect our experiment. –Are you brining extra hardware? Extra Semiconductor Sensors and Boards, Lexan Plates, Nanometric Filters, Teflon tubing and Fittings, TTL chips and transistors, Cables, etc, etc., etc ……. User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A

14 Yes we went through the procedure. No question Yes, we will be prepare. User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A

15 Yes, we have reviewed the schedule. User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A