RockSat-C 2012 LRR Launch Readiness Review University/Institution Team Members Date.

Similar presentations


Presentation on theme: "RockSat-C 2012 LRR Launch Readiness Review University/Institution Team Members Date."— Presentation transcript:

1 RockSat-C 2012 LRR Launch Readiness Review University/Institution Team Members Date

2 RockSat-C 2012 LRR User Notes Please follow this template as closely as possible This presentation is critical for maintaining your flight spot and is required to fly! Although it seems short, most items will take multiple slides, and please include data and pictures!

3 RockSat-C 2012 LRR Final Payload Show off your payload! –Pictures of the payload –Pictures of your team with the payload –Pictures of anything else that you love about your payload (keep in mind the time limit on the presentation ) 3

4 RockSat-C 2012 LRR User Guide Compliance 4 RequirementPayload RequirementStatus Mass allotment:your allotment Volume allotment: your allotment The payload’s center of gravity (CG): In 1”X1”X1” envelope of centroid (or in area designated for sharing teams? Activation met under requirement: (either 1.SYS.1 or 1.SYS.2) Your requirement (1.SYS.1 or 1.SYS.2) Tested? Structure mounts:Top and bottom bulkheads. No mounts to sides of cans. Sharing:Fully developed? For reference: 1.SYS.1 is the early activation line 1.SYS.2 is the RBF/g-switch activation line

5 RockSat-C 2012 LRR Integration Plan and Procedure Where are you for integration? –What did you learn from integrating for tests? Is your procedure complete and written? –This is important; integration at Wallops can be stressful so avoid relying on memory to connect everything in the payload –Do you have any concerns? What will you do to mitigate these? 5

6 RockSat-C 2012 LRR Testing Results Any updates on testing? –Pictures/plots etc (not required unless you had to do more tests between the delta FMSTR and now) Does you payload activate properly? Does your payload fulfill the mission requirements? 6

7 RockSat-C 2012 LRR Level of Readiness This is the most important part of the presentation! Are you ready? What is ready? Is anything not ready? –Why? How will you make them ready? 7

8 RockSat-C 2012 LRR Level of Readiness Action items between now and June 15 th ? –What will you do with the things that aren’t ready? 8

9 RockSat-C 2012 LRR Check-In Inspections Are there any remaining questions about check-in? Have you tried it yet? –Were there any issues? 9

10 RockSat-C 2012 LRR Final Questions Do you have any questions about how this week will go? –Any environmental test day questions? –Any integration day questions? –Any launch day questions? –Food questions? –Pony questions? –Bill’s questions? 10