RockSat-C 2011 ISTR Payload Subsystem Integration and Testing Report Universities/Institutions Team Members Date.

Similar presentations


Presentation on theme: "RockSat-C 2011 ISTR Payload Subsystem Integration and Testing Report Universities/Institutions Team Members Date."— Presentation transcript:

1 RockSat-C 2011 ISTR Payload Subsystem Integration and Testing Report Universities/Institutions Team Members Date

2 RockSat-C 2011 ISTR –This template shall be followed as closely as possible. User Notes

3 RockSat-C 2011 ISTR –Briefly remind everyone what your mission is. Mission Overview

4 RockSat-C 2011 ISTR -A Functional block diagram of the entire system should be presented here. -By now, your payload should have excellent block diagrams after CDR completion. -Use this diagram as a basis/reference as you explain to me how things integrated together. -Be sure to define subsystem acronyms Functional Block Diagram

5 RockSat-C 2011 ISTR -How did you integrate your various subsystems? -To what level (Full system or just subsystem to subsystem?) -i.e. -Power board verified, then connected to main board -Powered up main board and verified voltages at all sensors -Connected control board.... Blah, blah, blah -After testing electrical boards, mounted to RockSat-X plate -Mounted mechanical boom to plate -Connected mechanical boom to control board... Blah, blah, blah -Show pictures! I am hoping to see components fitting together Integration Procedure Integrating the tether spool onto the power and unpowered hubs (EXAMPLE Picture and description)

6 RockSat-C 2011 ISTR -What went wrong? -What will be done to remedy the problem? -What lesson (if any) was learned? -Pictures! -What went right? -Pictures -Best practices -What advice could you give to next year’s team? Results

7 RockSat-C 2011 ISTR -Once integrated, did you test any of the integrated subsystems? -Why did you perform the test that you did? -If you didn’t test integrated subsystems, why not? -If you had a failure, which prevented testing, how will you move forward? -Pictures! Integrated Subsystem Testing Control board mounted to main board Testing functionality of push-button state changes in software (EXAMPLE)

8 RockSat-C 2011 ISTR -Did everything work as planned? -Did all electronics communicate? -Did the software work with all subsystems? -Did the sensors return reasonable data? -Will the sensors need calibration? -Most importantly, just summarize your findings -What needs to change before flight? -Action items… Testing Results Push-button Software Control: Success Successfully changed software states through push-buttons. No changes required for flight Main and Control boards could NOT be integrated into structure due hole misalignment. Next revision of board will have correct hole alignment. EXAMPLE

9 RockSat-C 2011 ISTR –What is your plan from now until your first Day In The Life (DITL) testing report? Currently scheduled for 4/20/2011 SITR to DITL 1

10 RockSat-C 2011 ISTR –Issues and concerns –Closing remarks Concluding Remarks

11 RockSat-C 2011 ISTR –Additional data not immediately relevant to the presentation –You should include copies of updated: Mechanical Drawings Electrical Schematics Power Budget ICDs Appendix