Presentation is loading. Please wait.

Presentation is loading. Please wait.

Welcome to Pacific transformer Introduction. BRIEF INFORMATION PACIFIC TRANSFORMER BEGAN THE YEAR OF 1981. THE THREE PRINCIPALS WERE PAT THOMAS, JIM RICHARDSON.

Similar presentations


Presentation on theme: "Welcome to Pacific transformer Introduction. BRIEF INFORMATION PACIFIC TRANSFORMER BEGAN THE YEAR OF 1981. THE THREE PRINCIPALS WERE PAT THOMAS, JIM RICHARDSON."— Presentation transcript:

1 Welcome to Pacific transformer Introduction

2 BRIEF INFORMATION PACIFIC TRANSFORMER BEGAN THE YEAR OF 1981. THE THREE PRINCIPALS WERE PAT THOMAS, JIM RICHARDSON AND RANDY NEVERKA. TODAY, PACIFIC TRANSFORMER STILL OWNED BY PAT THOMAS AND JIM RICHARDSON. ANNUAL SALES BEST REVENEW YEAR 2012, 17.1M

3 INDUSTRIES ELECTRONIC O.E.M, E.I. MEDICAL, SECURITY, MILITARY, AUTOMOTIVE, MARINE, GAMING, ALTERNATIVE ENERGY, MUSIC INDUSTRY,….

4

5 CAPABILTIES 1 WATT TO 350 KVA CONFIGURATIONS, CHASSIS MOUNT, PC AND SMT MOUNT, TOROIDAL, LOW PROFILE, ENCAPSULATED, CUSTOM POWER TRANSFORMERS, CHOKES, INDUCTORS, ISOLATION TRANSFORMERS, AUDIO TRANSFORMERS, INVERTER & SWITCHMODE TRANSFORMERS.

6

7

8 RECENT BUSINESS RECENTLY HIRED A DESIGN ENGINEER. (STARTED MAY 3RD ) FINANCIAL HEALTH DUNN & BRADSTREET 3A1 30 YEARS OF BUSINESS NEVER A LATE PAYMENT. SUB-TIER SUPPIER N/A

9 INNOVATION & TECHNOLOGY 60 YEARS OF EXPERIENCE IN MAGNETICS DESIGN COMPLETE ENGINEERING STAFF PLANT CLOSURES MOVES AND HOLIDAY CLOSURES NO PLANT CLOSURES HOLIDAYS : MEMORIAL DAY, 4TH OF JULY, LABOR DAY, THANKS GIVING, CHRISTMAS AND NEW YEAR.

10 BUSINESS CONTINUITY/DISASTER RECOVERY PLAN FULLY INSURED AGAINST FIRE OR OTHER INTERRUPTIONS OF BUSINEES ACTIVITY. OWN A FACILITY IN MEXICO AND THREE OFFSHORE (China and Thailand) PARTNERS TO SUPPORT MANUFACTURING IN CASE OF DISASTER.

11 CAPACITY REVIEW-SHIFTS, # OF LINES 20 % MANUFACTURING SPACE AVAILABLE 2 SHIFTS 1 PRODUCTION LINE (6 MANUFACTURING STEPS) QUALITY CONTROL

12 PROCESS EXCELLENCE PROCESS FMEA APPROVED BY GENERAL MOTORS & INT’L RECTIFIER 2 CELL ASSEMBLY AREAS UNDER LEAN MANUFACTURING (358K DELIVERED PARTS IN ONE YEAR WITH 0 CUSTOMER REJECTIONS.

13 FINAL INSPECTION JAN 2013

14 FUNCTIONAL TEST JAN 2013 GOAL<10,000 PPM

15 IN-PROCESS INSPECTION TOTAL TESTED 8307 TOTAL DEFECTIVE: 30 % DEFECTIVE: 0.361 JAN 2013 GOAL<20,000 PPM

16 ORGANIZATION

17

18

19

20

21

22

23

24

25

26

27

28 THANKS FOR YOUR TIME


Download ppt "Welcome to Pacific transformer Introduction. BRIEF INFORMATION PACIFIC TRANSFORMER BEGAN THE YEAR OF 1981. THE THREE PRINCIPALS WERE PAT THOMAS, JIM RICHARDSON."

Similar presentations


Ads by Google