Presentation is loading. Please wait.

Presentation is loading. Please wait.

Documentation Control and Quality Control Presented by Shane Tyler and Gary Russell.

Similar presentations


Presentation on theme: "Documentation Control and Quality Control Presented by Shane Tyler and Gary Russell."— Presentation transcript:

1 Documentation Control and Quality Control Presented by Shane Tyler and Gary Russell

2 Maintaining ATEX Certification on the Sage Rio Mass Flow Meter Procedures and Documentation Procedures and Documentation ATEX NIST Traceability ATEX NIST Traceability Weekly Quality Meetings Weekly Quality Meetings QC and Final Testing (including Helium leak check on ALL volatile gases) QC and Final Testing (including Helium leak check on ALL volatile gases) Commitment to Quality Commitment to Quality

3 Procedures and Documentation for Maintaining ATEX Certification Various documents including assembly procedures to engineering meeting notes are being used to maintain this standard Various documents including assembly procedures to engineering meeting notes are being used to maintain this standard Document database and drawing database are beginning to intertwine for stronger traceability of parts used in construction of Rio Document database and drawing database are beginning to intertwine for stronger traceability of parts used in construction of Rio

4 ATEX NIST Traceability All of our calibration equipment and test instruments are calibrated through Transcat Metrology Services All of our calibration equipment and test instruments are calibrated through Transcat Metrology Services All calibration sheets are filed and re-calibration dates are noted by Document Control All calibration sheets are filed and re-calibration dates are noted by Document Control Any mechanical changes to Sage Rio must be pre-approved by TUV before being fully released in house Any mechanical changes to Sage Rio must be pre-approved by TUV before being fully released in house

5 Weekly Quality Meetings Quality meetings are held every Monday morning at 9:00am Quality meetings are held every Monday morning at 9:00am Quality Group has helped to streamline processes as well as help keep the company on task for delivering a quality product Quality Group has helped to streamline processes as well as help keep the company on task for delivering a quality product

6 QC and Final Testing Final QC checks the meter for any defects not found during assembly (this includes paperwork as well as accessories) Final QC checks the meter for any defects not found during assembly (this includes paperwork as well as accessories) Leak Testing using Helium leak detector Final QC checks Insertion type meters for leaks between enclosure and sensor head Leak Testing using Helium leak detector Final QC checks Insertion type meters for leaks between enclosure and sensor head

7 Commitment to Quality ATEX Certification only the beginning in demonstrating Sage quality ATEX Certification only the beginning in demonstrating Sage quality Developing Incoming QC Checks on ATEX parts Developing Incoming QC Checks on ATEX parts


Download ppt "Documentation Control and Quality Control Presented by Shane Tyler and Gary Russell."

Similar presentations


Ads by Google