Presentation is loading. Please wait.

Presentation is loading. Please wait.

Spanish WFD article 13 reporting WISE Technical Team meeting June 7th 2010 Madrid.

Similar presentations


Presentation on theme: "Spanish WFD article 13 reporting WISE Technical Team meeting June 7th 2010 Madrid."— Presentation transcript:

1 Spanish WFD article 13 reporting WISE Technical Team meeting June 7th 2010 Madrid

2 Reunión de los Grupos de Trabajo del S. I. A. 17 de Junio de 2.009 WISE Technical Team – Madrid June 2010 Spanish WFD Article 13 reporting Contents –INTRODUCTION: SIA (WATER INFORMATION SYSTEM) –METHODOLOGY FOR THE REPORTING PROCESS –TOOLS IMPLEMENTED –REPORTING PROCESS STATUS –LESSONS LEARNT

3 Reunión de los Grupos de Trabajo del S. I. A. 17 de Junio de 2.009 WISE Technical Team – Madrid June 2010 Spanish WFD Article 13 reporting Contents –INTRODUCTION: SIA (WATER INFORMATION SYSTEM) –METHODOLOGY –TOOLS IMPLEMENTED –REPORTING PROCESS STATUS –LESSONS LEARNT

4 Reunión de los Grupos de Trabajo del S. I. A. 17 de Junio de 2.009 WISE Technical Team – Madrid June 2010 INTRODUCTION SIA IS THE REPOSITORY THAT STORES THE INFORMATION TO BE REPORTED And much more….

5 Reunión de los Grupos de Trabajo del S. I. A. 17 de Junio de 2.009 WISE Technical Team – Madrid June 2010 Reporting portal architecture SIA data model Integrated Data Sources (Services) Integrated Data Sources (Files) Integrated Data Sources (documents) Integrated BD Alphanum. Integrated BD GIS. GIS Viewer Digital Water Book IndicatorsDownloads ARCHITECTURE

6 Reunión de los Grupos de Trabajo del S. I. A. 17 de Junio de 2.009 WISE Technical Team – Madrid June 2010 MARM SIA EBRO DUERO SEGURA TAJO GUADIANA … IGN National Geographic Institute INSPIRE INFORMATION REQUESTS + FEDERAL BD EU INSPIRE

7 Reunión de los Grupos de Trabajo del S. I. A. 17 de Junio de 2.009 WISE Technical Team – Madrid June 2010 Spanish WFD Article 13 reporting Contents –INTRODUCTION: SIA (WATER INFORMATION SYSTEM) –METHODOLOGY FOR THE REPORTING PROCESS –TOOLS IMPLEMENTED –REPORTING PROCESS STATUS –LESSONS LEARNT

8 Reunión de los Grupos de Trabajo del S. I. A. 17 de Junio de 2.009 WISE Technical Team – Madrid June 2010 Methodology We started with the development and agreement with all RBDs of a specific conceptual model for reporting Content analysis Reporting specification Data model definition Exchange procedure definition Reporting process with RBDs Reporting process to WISE RBD validation

9 Reunión de los Grupos de Trabajo del S. I. A. 17 de Junio de 2.009 WISE Technical Team – Madrid June 2010 Methodology REPORTING GUIDELINES AND SCHEMAS LEGAL REQUIREMENTS (EU / ES) REPORTED INFORMATION RBMP DRAFTS COMPILATION AND ANALYSIS DEFINITION OF THE EXCHANGE PROCESS EU LEVELNATIONAL LEVEL SUPPORT CENTER ACCESS DB SHAPEFILES QA/QC AT NATIONAL LEVEL

10 Reunión de los Grupos de Trabajo del S. I. A. 17 de Junio de 2.009 WISE Technical Team – Madrid June 2010 Methodology We took the opportunity to implement a reporting mechanism that should be applicable to all reporting obligations, not only Article 13 reporting, in the WFD era. Integration of the information has been a key priority –Automation –Coherence checking –Publication and integration of the information trough Spanish WIS SIA Standardized file exchange mechanism using EU model. –Pre-filled files were sent to RBDs to facilitate information exchange and data quality. Weve developed 3 levels of compliance checking: –Automatic validation: compliance with XML schemas from EU –Manual structure validation: overall coherence, compliance of GIS information with access information, etc. –Manual content validation: specific checks of each module by the owners of each area in the organization Communication, file sharing, versioning, validation, work-flow management and support have been automated where possible –A huge effort has been made to implement specific IT support tools Single point of contact in each RBD

11 Reunión de los Grupos de Trabajo del S. I. A. 17 de Junio de 2.009 WISE Technical Team – Madrid June 2010 Methodology – Upload process at national level RBD User uploads a file to the WIS reporting portal Automatic file checking (formats, versions, mandatory fields..) Automatic consistency checking (coherence between tables and files, refered files, etc…) Manual content validation Semi automatic GIS validation (off-line tools) Global validation Reporting team generates EU files and uploads to WISE

12 Reunión de los Grupos de Trabajo del S. I. A. 17 de Junio de 2.009 WISE Technical Team – Madrid June 2010 Spanish WFD Article 13 reporting Contents –INTRODUCTION: SIA (WATER INFORMATION SYSTEM) –METHODOLOGY FOR THE REPORTING PROCESS –TOOLS IMPLEMENTED –REPORTING PROCESS STATUS –LESSONS LEARNT

13 Reunión de los Grupos de Trabajo del S. I. A. 17 de Junio de 2.009 WISE Technical Team – Madrid June 2010 Tools implemented Organizational tools –Consulting team to define information exchange conceptual model, contents, data specification and exchange formats A thorough reporting guide has been developed for Spain (very well documented). –A national workgroup has been created with all RBDs to discuss reporting and WIS issues (Spanish Workgroup on Water Information Systems and Reporting). 5 meetings have been organized so far with over 80 participants in each meeting CIRCA space for document sharing Very successful and enriching experience –Support call center for reporting process support Over 300 information requests answered: phone, email and Web-form 3 people full time since fall last year. Information management tools –New reporting portal for file exchange –Integrated automatic validation of files –Integrated Workflow engine for validation and reporting process management and visualization –All information received will be published through an dedicated web site integrated in SIA (Spanish WIS system)

14 Reunión de los Grupos de Trabajo del S. I. A. 17 de Junio de 2.009 WISE Technical Team – Madrid June 2010 Tools implemented: Reporting portal architecture Exchange portal Access SIA data model Integrated Data Sources (Services) Integrated Data Sources (Files) Integrated Data Sources (documents) Integrated BD Alphanum. Integrated BD GIS. GIS Viewer Digital Water Book IndicatorsDownloads Docs GIS

15 Reunión de los Grupos de Trabajo del S. I. A. 17 de Junio de 2.009 WISE Technical Team – Madrid June 2010 Tools implemented: Exchange portal components Exchange portal File & portal management Automatic file validation Manual file validation User management Process management and workflow KPIs

16 Reunión de los Grupos de Trabajo del S. I. A. 17 de Junio de 2.009 WISE Technical Team – Madrid June 2010 Tools implemented: Exchange portal logical architecture Common water data exchange portal framework Reporting processes (envelopes) Exchange datamodels (will implement support for many different formats: excel, access, XML, WebService) File exchange structure Process definition Dates Validation routes User & roles KPIs File validation rules Reporting processes (envelopes) Exchange datamodels (will implement support for many different formats: excel, access, XML, WebService) File exchange structure Process definition Dates Validation routes User & roles KPIs File validation rules Reporting processes (envelopes) Exchange datamodels (will implement support for many different formats: excel, access, XML, WebService) File exchange structure Process definition Dates Validation routes User & roles KPIs File validation rules

17 Reunión de los Grupos de Trabajo del S. I. A. 17 de Junio de 2.009 WISE Technical Team – Madrid June 2010 Tools implemented

18 Reunión de los Grupos de Trabajo del S. I. A. 17 de Junio de 2.009 WISE Technical Team – Madrid June 2010 Spanish WFD Article 13 reporting Contents –INTRODUCTION: SIA (WATER INFORMATION SYSTEM) –METHODOLOGY FOR THE REPORTING PROCESS –TOOLS IMPLEMENTED –REPORTING PROCESS STATUS –LESSONS LEARNT

19 Reunión de los Grupos de Trabajo del S. I. A. 17 de Junio de 2.009 WISE Technical Team – Madrid June 2010 Reporting status All RBD (except Canary Islands) have uploaded the 10 schemas and the associated GIS information. All schemas were uploaded on time to WISE (6! hours before the final deadline) Validation issues still being resolved both nationally and with EU. The current reporting has to be understood as a first version of the information, will likely change and will be updated when the RBDMP will be formally approved. A new national reporting deadline is being set to receive the reglamento de planificación hidrológica (Spanish specific program of measures information, more detailed than Art. 13 reporting) and the updated WFD data (probably right after summer).

20 Reunión de los Grupos de Trabajo del S. I. A. 17 de Junio de 2.009 WISE Technical Team – Madrid June 2010 Reporting status: key issues RBD definition in Spain is still work-in-process –Political issues still alive around border definition and competent authorities distribution (regional / central government). Most RBDMP have not been approved to date, some of them have not even been released to the public –Some of the RBDMP are still on public consultation process –The reporting of March 22nd corresponds to the state of the art at that moment but will likely be subjected to modifications. Lack of uniformity across Spanish RBDs produced a lot of specific rework –Not all RBDs are using the same concepts, procedures and tools to produce their RBDMP making us work, for some areas, case-by-case.

21 Reunión de los Grupos de Trabajo del S. I. A. 17 de Junio de 2.009 WISE Technical Team – Madrid June 2010 Reporting status: Steps ahead New update of Art. 13 information after summer (probably not the last one) Reglamento de Planificación Hidrológica reporting New directives will go trough the same reporting mechanism starting this fall –SOER: Oct 22nd. –Nitrates –UWWTD –… A custom web site to publish Art. 13 reporting information A new version of the portal is being developed to include some workflow management improvements: file blocking, better validation, etc.

22 Reunión de los Grupos de Trabajo del S. I. A. 17 de Junio de 2.009 WISE Technical Team – Madrid June 2010 Spanish WFD Article 13 reporting Contents –INTRODUCTION: SIA (WATER INFORMATION SYSTEM) –METHODOLOGY FOR THE REPORTING PROCESS –TOOLS IMPLEMENTED –REPORTING PROCESS STATUS –LESSONS LEARNT

23 Reunión de los Grupos de Trabajo del S. I. A. 17 de Junio de 2.009 WISE Technical Team – Madrid June 2010 RBD Reporting key learning's Good –Great level of participation and involvement of RBDs: beyond any other reporting process –Great level of automation and process-management control thanks to a better definition of the reporting process and file exchanges (indicators were followed daily by management) –The information tools have been a key element to enable a more transparent and homogeneous reporting process: all RBDs were able to track progress of other basins trough the portal… –Single point of reporting for each RBDs has been a great step ahead. Not so good –Content validation: no previous experience in content validation (learning curve) Whats good? Whats correct? –Coherence issues between RBDs: Spain is becoming a scale model of the EU Limits Codes Concepts and methodologies … –Timing: never enough time –RBDMP not approved: provisory information –Some RBDs not yet ready to report anything (Canary Islands)

24 Reunión de los Grupos de Trabajo del S. I. A. 17 de Junio de 2.009 WISE Technical Team – Madrid June 2010 UE Reporting key learnings Good –A very well specified and documented process: little space for interpretation. Great job Jorge and his team! Many thanks! –Very agile and kind support from John and his people: well done! Many thanks too! –Good reliable and familiar tools –Validation application was useful Not so good –Validation messages: a little confusing, specially at the end with so many versions of the exchange files. Some validation messages were incorrect, due to revisions on the file specifications –So many versions of the exchange files: necessary but bothersome –Coherence with other Directives. –Still dont know how the real evaluation of compliance is going a be implemented –Access files and XML schemas not 100% the same (field types, etc.) –Time constrains made impossible to feedback all validation issues to RBDs to get them resolved.


Download ppt "Spanish WFD article 13 reporting WISE Technical Team meeting June 7th 2010 Madrid."

Similar presentations


Ads by Google