PRODUCTION DEMAND Mature blocks closeout, up to 4,4 GW power DEMAND PRODUCTION.

Similar presentations


Presentation on theme: "PRODUCTION DEMAND Mature blocks closeout, up to 4,4 GW power DEMAND PRODUCTION."— Presentation transcript:

1

2

3

4

5

6

7

8 PRODUCTION DEMAND

9 Mature blocks closeout, up to 4,4 GW power DEMAND PRODUCTION

10 Demand Side Response (DSR): temporary reduction of energy consumption, implemented on demand, realized according to schedule agreed by Energy Consumer and Supplier Technology Supplier / VEMS Operator = VemsEcoFound DSR Integrator = WSEInfoEngine / Sparkhouse

11 NotifyRespondRestore

12

13 INDUSTRY BUSINESS PUBLIC INSTITUTIONS HOSPITALS SHOPPING MALLS AGGREGATOR: SPARKHOUSE/ INFOENGINE VEMS SYSTEM / DSR ENABLER PSE / OSD ENERGY WHOLESALE MARKET MW / STAND BY / MWh

14 AUTOMATICMANUAL OR

15 Automated power reduction aggregation in all managed entities through VEMS A GGREGATOR OPERATING ENERGY MANAGEMENT SYSTEM

16 Operational platform for power reduction management in distributed entities = VEMS Enabler DSR

17

18 Power demand in peak times relates to approx. 1% of the whole year period (50-70 hours) Need for DSR may reach from 500 MW to 4000 MW Current costs of extraordinary power supply for peaks reach 600- 800 mln PLN

19 MarketDR Capacity% of Capacity PJM14,118 MWs8.6% NYISO2,248 MWs6.7% ISO-NE2,164 MWs7.4% UK3,621 MWs4.5%4.5% PL ??

20 MarketDR Capacity% of Capacity PJM14,118 MWs8.6% NYISO2,248 MWs6.7% ISO-NE2,164 MWs7.4% UK3,621 MWs4.5%4.5% PL 1,380 MWs (estimated) 5.0% (estimated)

21

22

23

24 Virtual Energy Management System (VEMS) VEMS allows power use reduction during peak energy demand periods.

25 Reduction up to 30% Rationalization of ventilation, heat and cooling management

26 Daily profile changes technical handling Roster unit profile optimization for dealing unit Profiting from daily profile changes (price x quantity) Energy measurement management

27 DSR deals Profiting from: DSR and daily profile changes Power reduction technical handling

28 income costs

29 1.New income source 2.Media costs reduction 3.No investment costs for Partner (*) (*) Possible exception in case of necessary measurement infrastructure adjustement or repair

30

31

32 VEMS ON

33 https://www.facebook.com/Virtual2Power