Demand Side Response (DSR) temporary reduction of energy consumption, implemented on demand, realized according to schedule agreed by Energy Consumer and Supplier Integrator DSR = WSEInfoEngine Technology Partner = VemsEcoFound Spółka obrotu = Utility - energy broker (e.g. Tauron, PGE Obrót) PSE = Polskie Sieci Elektroenergetyczne POB = Balancing Management Company OSD = Distribution System Operator
5
INDUSTRY BUSINESS PUBLIC INSTITUTIONS HOSPITALS SHOPPING MALLS BUILDINGSI AGRE- GATOR SYSTEM IT DSM / DSR CONNECT OR PSE / OSD ENERGY WHOLESALE MARKET MW / STAND BY / MWh
6
AUTOMATICMANUAL OR
11
Mature blocks closeout, up to 4,4 GW power
13
Power demand in peak times relates to approx. 1% of the whole year period (50-70 hours) Need for DSR may reach from 500 MW to 4000 MW Current costs of extraordinary power supply for peaks reach 600- 800 mln PLN
14
NotifyRespondRestore
15
Automated power reduction aggregation in all managed entities through VEMS
16
Operational platform for power reduction management in distributed entities = VEMS Enabler DSR
18
MarketDR Capacity% of Capacity PJM14,118 MWs8.6% NYISO2,248 MWs6.7% ISO-NE2,164 MWs7.4% UK3,621 MWs4.5%4.5% PL ??
19
MarketDR Capacity% of Capacity PJM14,118 MWs8.6% NYISO2,248 MWs6.7% ISO-NE2,164 MWs7.4% UK3,621 MWs4.5%4.5% PL 1,380 MWs (estimated) 5.0% (estimated)
21
Marcin Michalski President of the Board, VemsEcoFound Virtual Energy Management System (VEMS) VEMS allows power use reduction during peak energy demand periods.
22
Reduction up to 30% Rationalization of ventilation, heat and cooling management
23
Daily profile changes technical handling Roster unit profile optimization for dealing unit Profiting from daily profile changes (price x quantity) Energy measurement management
24
DSR deals Profiting from: DSR and daily profile changes Power reduction technical handling
25
income costs
26
1.New income source 2.Media costs reduction 3.No investment costs for Partner (*) (*) Possible exception in case of necessary measurement infrastructure adjustement or repair