Presentation is loading. Please wait.

Presentation is loading. Please wait.

TITLE: Perpendicularity Inspection of Final Assembly SWI:REVISION:DATE:PAGES:WORK STATION: MI – Perp. FinalA2014-1-2# OF 77405 Technology in Motion STANDARD.

Similar presentations


Presentation on theme: "TITLE: Perpendicularity Inspection of Final Assembly SWI:REVISION:DATE:PAGES:WORK STATION: MI – Perp. FinalA2014-1-2# OF 77405 Technology in Motion STANDARD."— Presentation transcript:

1 TITLE: Perpendicularity Inspection of Final Assembly SWI:REVISION:DATE:PAGES:WORK STATION: MI – Perp. FinalA # OF Technology in Motion STANDARD WORK INSTRUCTION Trained and capable of performing this work: Date: Supervisor or engineer giving Approving to perform: Operator 2 Operator 5 Operator 6 Operator 4 Operator 1 Operator 3 On this page is information about operators that are trained and certified to perform this Standard Work. The operators signing below have read this SWI and have successfully performed the work described in it in the presence of the Supervisor or Engineer signing in the second column on the date in the third column.

2 TITLE: Perpendicularity Inspection of Final Assembly SWI:REVISION:DATE:PAGES:WORK STATION: MI – Perp. FinalA # OF Technology in Motion STANDARD WORK INSTRUCTION Safety Requirements:Safety glasses In Process Check 1). 2) Perpendicularity Tolerances Operator Maintenance 1) 2) 3) 4) 5) Material / Components 1) Mechanical sheet 2) Print 3) 4) 5) Tools & Fixtures 1) 2) 3) 4) 5) Mechanical sheet

3 TITLE: Perpendicularity Inspection of Final Assembly SWI:REVISION:DATE:PAGES:WORK STATION: MI – Perp. FinalA # OF Technology in Motion STANDARD WORK INSTRUCTION Safety Requirements:Safety glasses In Process Check 1) V. 2) V. Operator Maintenance 1) Verify calibration on dial indicator. 2) 3) 4) 5) Material / Components 1) motor 2) 3) 4) 5) Tools & Fixtures 1)V-block fixture 2)Dial indicator 3) 4) 5) 1. V 2.. ( :.)

4 TITLE: Perpendicularity Inspection of Final Assembly SWI:REVISION:DATE:PAGES:WORK STATION: MI – Perp. FinalA # OF Technology in Motion STANDARD WORK INSTRUCTION Safety Requirements:Safety glasses In Process Check 1). (01) 2) Operator Maintenance 1) 2) 3) 4) 5) Material / Components 1) motor 2) 3) 4) 5) Tools & Fixtures 1) 2) 3) 4) 5) 3..

5 TITLE: Perpendicularity Inspection of Final Assembly SWI:REVISION:DATE:PAGES:WORK STATION: MI – Perp. FinalA # OF Technology in Motion STANDARD WORK INSTRUCTION Safety Requirements:Safety glasses In Process Check 1)Verify that indicator will not run out of travel distance. 2) 5 (,, ect.) 4. Operator Maintenance 1) 2) 3) 4) 5) Material / Components 1) 2) 3) 4) 5) Tools & Fixtures 1) 2) 3) 4) 5)

6 TITLE: Perpendicularity Inspection of Final Assembly SWI:REVISION:DATE:PAGES:WORK STATION: MI – Perp. FinalA # OF Technology in Motion STANDARD WORK INSTRUCTION Safety Requirements:Safety glasses In Process Check 1) Measurements must be within the tolerance on the Mechanical Sheet and Print to pass inspection. 2) 7. Record variance measured by dial indicator on mechanical sheet. Operator Maintenance 1) 2) 3) 4) 5) Material / Components 1) 2) 3) 4) 5) Tools & Fixtures 1) 2) 3) 4) 5) Repeat steps 1 through 7 to measure the perpendicularity of any other surface on the print.

7 TITLE: Perpendicularity Inspection of Final Assembly SWI:REVISION:DATE:PAGES:WORK STATION: MI – Perp. FinalA # OF Technology in Motion STANDARD WORK INSTRUCTION Signatures of Authorization Production:Manufacturing:Quality:Design:Other: Revision:Date:Reason for Change:Editor: A New SWI Into.Tony Dick


Download ppt "TITLE: Perpendicularity Inspection of Final Assembly SWI:REVISION:DATE:PAGES:WORK STATION: MI – Perp. FinalA2014-1-2# OF 77405 Technology in Motion STANDARD."

Similar presentations


Ads by Google