NoDay/DateTimeActivities 1Tue/27 Aug 201315.00 - FinishSharing and using Edmodo. 2Fri/30 Aug 201314.00- Finish Review of Screen O-matic & Alloc_vjoiner.

Similar presentations


Presentation on theme: "NoDay/DateTimeActivities 1Tue/27 Aug 201315.00 - FinishSharing and using Edmodo. 2Fri/30 Aug 201314.00- Finish Review of Screen O-matic & Alloc_vjoiner."— Presentation transcript:

1

2

3

4 NoDay/DateTimeActivities 1Tue/27 Aug 201315.00 - FinishSharing and using Edmodo. 2Fri/30 Aug 201314.00- Finish Review of Screen O-matic & Alloc_vjoiner (join video) 3Mon/2 Sept 201315.00- FinishDevelop IISYs blog 4Wed/4 Sept 201315.00- FinishReview Edmodo and Video Editing 5Fri/ 6 Sept 201314.00- Finish Sharing on Sigil (Making Digital Book) and ISSUU part 2 6Mon/9 Sept 201315.00- FinishLearning Animation Blender 7Wed/11 Sept 201315.00-FinishMaking Digital Book Part 2 Schedule of Expert Teacher and Student 1. Giving Workshop to IISY teacher

5 NoDay/DateTimeActivities 1Tue/27 Aug 201309.00 - FinishExplanation from Engineer 2Fri/30 Aug 201311.00- FinishPresentation for math project 3Mon/2 Sept 201313.00- FinishDoing the social project 4Wed/4 Sept 201310.00- Finish Doing the language project and explanation from Docor 5Fri/ 6 Sept 201311.00- FinishDoing The Science project 6Mon/9 Sept 201310.00- FinishPresentation for math project 7Wed/11 Sept 201310.00-FinishMaking contruction of warehouse Schedule of Expert Teacher and Student 2. Cover The Student Presentation and Practioners (Doctor and Engineer) Explanation

6 NoDay/DateTimeActivities 1 Mon/26 Aug 201309.00 - FinishExpert student follow Phisic class 2 Thus/29 Aug 201311.00- Finish Expert teacher and student follow english class for teacher 3 Tues/3 Sept 201313.00- Finish Expert teacher and student follow english class for teacher 4 Thusr/5 Sept 201310.00- Finish Expert teacher and student follow english class for teacher 5 Mon/9 Sept 201311.00- Finish Taking pasrt football match Indonesia team VS IISY 6 Fri/13 Sept12-00 Expert student give digibook to students IISY Part 1 7 Mon/16 Sept12-00Expert student give digibook to students IISY Part 2 Schedule of Expert Teacher and Student 3. Taking part in the Classroom 4.On Saturday and Sunday Expert Teacher and Student go to Edutainment Place such as The Great Mosque in Yangon, Shwe Dagon, Floating Pagoda, The famous Boyokye Market, Nay Pyi Thaw Stadium etc

7 Tito Adi Dewanto (Expert Teacher) Prabu Diga Bawana (Expert Student) Mas Agry, Bu Dewi dan Mbak Best (Expert Seamolec Jakarta)

8 1. Getting the Message Across

9

10

11

12 In this case we just want to explain about the 4th project, A Planning a Simple Warehouse, since the 4th project is already finished (untill the last product) while others project is still on going. Project about advertisement of smoking, this week will be accomplished and will be sent via email.

13

14 : Duration: 3 weeks Duration: 3 weeks Topic: Warehouse Topic: Warehouse Technology: ICT, online collaboration Outreach: Community based Outreach: Community based Partnership: One teacher, ICT teacher Partnership: One teacher, ICT teacher SCOPE OF PROJECT

15 Audience: Teachers, Engineering Professionals, Parents Engineering Professionals, Parents Integrated Subject : Math, Science (Phisic), Art and ICT

16 W arehouse is a commercial building for storage of goods.commercial buildinggoods Warehouses are used by manufacturers, importers, exporters, wholesalers, transportbusinesses, customs, school etcmanufacturersimportersexporters wholesalerstransportcustoms

17 Week 1 1. The Entry document The Driving Question 2. Form Groups Choose team leader Allocate responsibilities Begin research

18 Week 2 Research to material shop Making The Model Discuss form of warehouse model

19 Week 3 Finishing the model Full practice The Presentation Final Presentations

20 1. The Teacher Give Explanation About the process of the project 2. Invite the Enginer to explain how to build a warehouse Engineer from Yangon

21 Foto batubata

22 4. Divide the class into three group

23 5. Give assignment for the students to make a model of a warehouse, research report and Power Point Presentation

24

25

26

27 Group 2

28 Equipments For Warehouse 2 Floors Bricked Warehouse

29

30

31

32

33

34

35

36

37 ColumnMaterials or Labour NeededQuantit y Kyat per unit Total (Kyat) Column ( 0-9 x 0-9)121500001800000 Cement (bags)296000174000 Sand (sud)115000 Aggregate (sud)1.5700010500 16mm (ton)1570000 Binding wire (Ibs)184508100 Jungle wood (ton)3900002700000 5-ply wood (nos)3015000450000 Nails (Ibs)2590022500 Mason (nos)4500020000 Worker (nos)19350066500 Carpenter (nos)345000170000 Smith (nos)18500090000 6.5mm0.2620000124000 Total6220600

38 BeamMaterials or Labour NeededQuantityKyat Per UnitTotal (Kyat) Beam (40-0)92800002520000 Beam (30-0)122100002520000 Cement (bags)1006000600000 Sand (sud)31500045000 Aggregate (sud)5700035000 16mm diameter (ton)1.4570000798000 6.5mm diameter (ton)0.4620000248000 Binding wire (Ibs)3145013950 Jungle wood (ton)39000002700000 5-ply wood (nos)3415000510000 Nail (Ibs)5990053100 Mason (nos)11500055000 Worker583500203000 Carpenter (nos)795000395000 Smith (nos)375000185000 Total10881050

39 Wailin g Materials or Labour Needed QuantityKyat Per UnitTotal (Kyat) Brick (nos)17000901530000 Cement (bags)1656000990000 Sand (sud)61500090000 X-met (Rft)390040156000 Mason (nos)1245000620000 Worker (nos)1853500647500 Plaster120000 Total4153500 Floorin g Materials or Labour Needed QuantityKyat Per UnitTotal (Kyat) Cement (Bags)876000522000 Sand (sud)1715000255000 Aggregate (sud)670000420000 Mason (nos)8500040000 Worker (nos)503500175000 Total1412000

40 Ceilin g Materials or Labour Needed QuantityKyats Per UnitTotal (Kyats) 4x4 Asbesto (nos)833800315400 3x2 Pyingado (ton)0.315000045000 2x2 Pyingado (ton)0.415000060000 Pyingado Beading (ton)0.115000015000 Wood Screw (nos)10135050650 Nail (Ibs)99008100 Carpenter (nos)385000190000 Total684150

41 RoofingMaterials or Labour NeededQuantityKyat Per UnitTotal (kyat) 7 CGI Sheet Roofing (nos)161700112700 Roofing Nail (Ibs)38100038000 Color Plain Sheet Ridging (Rft) 1271700215900 Gatter (Rft)1562500390000 4x2 Rafter (ton)1900000 3x2 Purlin (ton)1900000 Nail (Ibs)1790015300 Carpenter (nos)545000270000 Worker (nos)18350063000 Total2904900

42 Electric al Material or Labour Needed QuantityKyat Per UnitTotal (Kyat) 4 Florescent Single Lamp (nos) 9650058500 4 Florescent Twin Lamp (nos) 17500 1 Goung (nos)11000 2 Goung (nos)11780 3 Goung (nos)14280 4 Goung (nos)142508500 10A Socket (nos)242508500 13A Socket (nos)319505850 Base Cup (nos)83002400 4 Way DB (nos)15000 20, 20A MCB (nos)19400 1P, 10A MCB (nos)12500 1P, 16A MCB (nos)12500

43 Materials or Labour NeededQuantityKyat Per UnitTotal (Kyat) 1.5mm2 wire (coil)22050041000 2.5mm2 wire (coil)130900 4mm2 wire (coil)147400 2 trenking (nos)2397022310 1 trenking (nos)104204200 Tape (Coil)2100200 Lighiting Electrician (nos)141001400 Socket Electrician (nos)512006000 DB Electrician (nos)110000 1.5mm2 Wire Electrician (nos)2309000 2.5mm2 Wire Electrician (nos)14012000 4mm2 Wire Electrician (nos)16018000 Total314440

44 TerminationFinal StageTotal sq.ftKyat Per sq.ftTotal (kyat) Door19570001365000 Windows19855001089000 Painting61602001232000 Aluminum Glass Partition1805000900000 Total45860000 The Whole HouseTotal (Kyat) Total Cost31306640 Maximum Estimate Cost35000000

45

46 Wood Wood-Destroying Pests Durability Burning Moisture Wood Wood-Destroying Pests Durability Burning Moisture Brick A Pain to fix or fit Take time Weather Conditions High in weight Brick A Pain to fix or fit Take time Weather Conditions High in weight

47 Advantages of Wood Easier to renovate Insulates well Economically efficient Temperature and change Advantages of Wood Easier to renovate Insulates well Economically efficient Temperature and change Advantages of Brick Low Maintenance Energy efficiency Appearance Higher resale value Advantages of Brick Low Maintenance Energy efficiency Appearance Higher resale value

48 ItemsQuantityCost Per Each(ks)Total Cost Cement1015bags57005,785,500 Stone11bags50,000550,000 Sand28sads8000224,000 Brick29760nos1002,976,000 Timber Scanting1ton500,000 Timber Planks1ton500,000 Nails1631lbs20003,262,000 X-met2450rft40009,800,000 Aluzinc2525sft13503,408,750 Roofing nail34lbs135045,900 Emulsion621gals60003,726,000 Rafter2970rft12503,712,500 All Total Cost=34,490,650 The Material and The Price

49 18 ft 15ft 18 ft 15ft

50

51

52

53

54

55

56

57

58


Download ppt "NoDay/DateTimeActivities 1Tue/27 Aug 201315.00 - FinishSharing and using Edmodo. 2Fri/30 Aug 201314.00- Finish Review of Screen O-matic & Alloc_vjoiner."