0 State University Construction Fund
Doing Business with the State University Construction Fund December 9, 2009 Chris Marcella Director of Design (518) Arthur R. Foo Director of Capital Procurement (518)

1 Table of Contents State University Construction Fund………………….2
SUNY Capital Plan………………………………………….5 Construction Contract Opportunities………………..6 Overview of Construction Contract Process….…..8 MWBE Requirements.…………………………………...11 Upcoming Projects………………………………………..12 Vendor Responsibility Requirements………………14 SUCF Contact Information……………………………..16

2 State University Construction Fund
Public Benefit Corporation established under Article 8-A of NYS Education Law Provides funding, planning, design and construction management for SUNY Exempt from Wicks Law

3 Mission Statement “…To provide academic buildings, dormitories and other facilities for the State-operated institutions and contract and statutory colleges under jurisdiction of the State University, to reduce the time lag between determination of need for such facilities and actual occupancy thereof, to expedite the construction, acquisition, reconstruction and rehabilitation or improvement of such facilities and to assure that the same are ready for the purposes intended when needed and when scheduled under the approved master plan of State University.”

4 SUNY Campuses

5 SUNY Capital Program Summary
# of Bldgs Sq. Foot(1) Avg Age(2) Budget(1) Funded By Projects Managed By Educational Facilities 1,823 56.6 44.2 $4,426(3) State Fund/Campus Hospitals 13 2.5 23.3 $450 Hospital Revenues Residence Halls 461 19.2 33.3 $573 Room Rents DASNY/ Campus Community Colleges 489 17.3 40.1 $390 50% State 50% Local Local Totals 2,786 95.6 41.7 $5,839 Notes: (1) Square footage and funding expressed in millions. (2) Average age (expressed in years) represents a straight average with no consideration given to the size of buildings or subsequent renovations. (3) Includes $1.650B in future appropriations for critical maintenance projects.

6 Contract Opportunities Available from:
NYS Contract Reporter Albany Times Union Local Newspapers Minority Commerce Weekly SUCF Website Plans Available Through Local Plan Rooms Campus

7 SUCF Website www.sucf.suny.edu
State University Construction Fund SUCF Website

8 Overview of Construction Contract Process
Sealed Bids – Publicly Opened Plans and Specifications May be examined free of charge at: Architect/Engineer’s Office Campus Facilities Offices Complete set of documents can be obtained from Architect/Engineer upon payment of a deposit Requirements for Bidding Bid Deposit – 5% of Total Bid Bank draft, certified check, bid bond Size of Projects previously completed Successful completion of similar work not less than 50% of Total Bid Ample Financial Resources – Working Capital Test

9 Overview of Construction Contract Process (continued)
Bonding (within 24 hours of Notice of Award) Performance Bond – 100% of Total Contract Labor and Material Bond – 100% of Total Contract Insurance Workers Compensation General Liability and Property Damage Builders Risk Owners Protective Liability Prevailing Wage Rates Post-Bid Submissions 3 Lowest Bidders

10 Overview of Construction Contract Process (continued)
Within 48 Hours of Bid Opening Uniform Contractor Questionnaire (UCQ) Affidavit of No Change (if UCQ submitted within past year) Proposed Major Subcontractors HVAC, Electrical, Plumbing and Asbestos Abatement Bid Breakdown by Trade or Section (Appendix A) Within 7 Calendar Days of Bid Opening UCQ’s for all proposed major subs (or Affidavit of No Change) MWBE Utilization Plan Equal Employment Opportunity Statement All Contracts Require Approval by: NY State Attorney General (AG) NY State Office of the State Comptroller (OSC)

11 MWBE Requirements Article 15-A of Executive Law Good Faith Effort
Fund Goals Utilization Plan Submitted 7 days after bid opening Reviewed for goals and good faith effort Identify issues; work with contractor on resolution MWBE firms Must be New York State Certified ESDC Directory website – Lois McLaughlin, MWBE Coordinator No Contract awarded without an approved MWBE Utilization Plan MBE WBE Upstate Projects 8% 4% Downstate Projects 10%

12 Sampling of Construction Projects in 2010
Region Campus Project Title Est. Construction $ Estimated Bid Month East System Admin Exterior Restorations R. I. G. $2,000,000 March Albany Replace Windows – Downtown Campus $2,300,000 May Empire State Regional Center Rochester $9,400,000 June ESF – Syracuse Gateway Building $18,000,000 August Construct New Business School $41,400,000 South Purchase Critical Maintenance Repairs – Exterior $13,000,000 Maritime Replace Campus Steam Distribution $5,900,000 February Stony Brook Rehab Old Chem Classroom Bldg #2 $33,400,000 April ESS Building Exterior Rehab $5,000,000 Farmingdale Construct Student Center $24,400,000 Replace Roofs, Various Buildings $4,100,000 Optometry Multipurpose Space – 3rd Floor $3,000,000 September Old Westbury Replace Campus Center Envelope $13,200,000 South/Central Binghamton New HV Substation $4,700,000 January Rehab Elevators – Various Buildings $4,200,000 Alfred Ceramics Rehab 3rd Flr./North Wing – McMahon Hall $3,600,000

13 Sampling of Construction Projects in 2010 (continued)
Region Campus Project Title Est. Construction $ Estimated Bid Month South/Central Binghamton Central Campus Quad – Site Rehab $3,900,000 May Rehab Domestic Water Distribution Systems $4,700,000 July Geneva Ag Food Research Lab $28,000,000 September Alfred State Rehab Allied Health Building $16,200,000 October North/Central Plattsburgh Fine Arts Ventilation Upgrades $5,500,000 January Cobleskill Dairy Complex Upgrades $1,000,000 Reconstruct Roads & Parking Lots $3,500,000 Oneonta Replace Windows/Roof – Physical Ed. Bldg $1,600,000 February Hudson Hall Rehab $19,800,000 April Oswego Renovations/Additions to Science Building $54,000,000 June Cornell Ag Stocking Hall Rehab/System Upgrades $75,000,000 West Buffalo- North Cooling Tower Replacement $3,200,000 Brockport Rochester Educational Opportunity Center $13,500,000 Fredonia Fenton Hall Exterior Rehabilitation $2,900,000 Geneseo Doty Building Renovation $23,300,000 Buffalo College New Technology Building $30,300,000

14 Vendor Responsibility Filing Requirements
Elements Authorization to do Business in NYS Financial Integrity Past Performance Uniform Contracting Questionnaire (UCQ) – Construction Original Signature Procurement Lobbying Act (SFL 139j) Offerer Disclosure of Prior Non-Responsibility Determinations OSC Review

15 Integrity Hotline (866) 543-8107 or (518) 320-1290
Anonymous or confidential

16 SUCF Contact Information General Manager’s Office - (518) Design and Construction Management – (518) Procurement Office - (518) MWBE Opportunities - (518) Corporate Integrity - (518)