1 Copyright © Siemens plc All rights reserved. Siemens CLS LED signal retrofit

2 Page 2 November-09 Traffic Solutions Content LED signal retrofit Introduction Background Standard Siemens LED signal The Siemens retrofit solution Scope Benefits Specific site examples Availability and typical pricing Questions

3 Page 3 November-09 Traffic Solutions Background For new installation ELV is usually the best solution Will deliver greater safety, lower installation costs and reduced carbon footprint compared to LV However, there are thousands of sites already installed using LV incandescent signals Much of this installed equipment is still serviceable The cost of mass upgrade to ELV may be difficult to justify The Siemens LED signal retrofit offers a cost effective solution to achieving lower running costs and reduced carbon footprint on many incandescent sites

4 Page 4 November-09 Traffic Solutions Helios CLS with LMF Standard Siemens CLS LED signal Helios CLS with Lamp Monitoring Facility (LMF) Benefits: Robust Helios signal body SIRA high phantom lens Lamp monitoring compatibility with all Siemens controllers Reduced power compared with HI signals CLS Module LMF Module

5 Page 5 November-09 Traffic Solutions How does the LMF work? Controller lamp monitoring typically uses the current consumed by a signal to indicate if it is on Most existing controllers are designed to monitor incandescent lamps Current is sinusoidal and predictable Of sufficient value to be easily measured To simplify hardware and software current is measured at defined points in the supply voltage waveform. Lamp supply voltage Current monitoring of incandescent lamps Lamp supply current Typical current measurement points

6 Page 6 November-09 Traffic Solutions How does the LMF work? LED signal currents are much lower than for incandescent lamps Current waveforms are often poor and difficult to predict, particularly as the supply voltage changes Cannot be monitored by standard controllers The LMF is a highly intelligent unit which adds a current pulse to satisfy the controllers expectations Should the LED module (or LMF) fail, all current is removed so that the controller can sense the signal failure Lamp supply voltage Current monitoring of LED signals Typical current measurement points LED supply current

7 Page 7 November-09 Traffic Solutions Helios CLS with LMF Standard Siemens CLS LED signal Helios CLS with Lamp Monitoring Facility (LMF) Benefits: Robust Helios signal body SIRA high phantom lens Lamp monitoring compatibility with all Siemens controllers Reduced power compared with HI signals Disadvantages Integral LMF adds significant cost LMF raises power consumption above basic CLS LED levels Complicates retrofit on-street CLS Module LMF Module

8 Page 8 November-09 Traffic Solutions The Siemens LED retrofit - Overview Provides effective retrofit kits for existing incandescent signals Helios Peek Elite Eliminates the need for the LMF unit but retains full lamp monitoring facilities Reduces cost Reduces power consumption Is fully compatible with ST800 and ST900 intersection controllers

9 Page 9 November-09 Traffic Solutions Helios CLS (retrofit) The Siemens LED retrofit – Realised benefits Reduced power compared with HI signals and standard Helios CLS Fully RLM compatible and meets the timing requirements of TR2210 and TR2500 Can usually be added to existing controllers without re-configuration Retains excellent optical performance delivered by Siemens Helios signals Protects investment in existing installed infrastructure Updated CLS Module LMF Module no longer needed Retrofit modules supplied complete with new door, lens and hoods Minimises installation time Ensures best possible optical performance

10 Page 10 November-09 Traffic Solutions The Siemens retrofit in detail New retrofit LED modules in signal body doors for: Siemens Helios Peek Elite Replacement lamp switch cards Retrofit upgrade kit for ST800 and ST900 controllers ST800Firmware (PB800 issue 26*) Filter kit ST900Firmware (PB801 issue 8*) (PB815 issue 4*) (*or later version)

11 Page 11 November-09 Traffic Solutions Detailed implementation considerations The retrofit covers most ST800 and ST900 (LV) sites fitted with Helios or Peek Elite signal heads This retrofit facility is not available on the ST700, ST750 ST800P or any 30A controller sites Generally it is not necessary to re- configure the controller Changes to lamp monitoring implemented by handset command The number of signals that can be driven on each phase is less than standard controllers * For pedestrian signals with Wait indicators, this limit of 4 signals would normally consist of two reds and two waits.

12 Page 12 November-09 Traffic Solutions Deciding which signals to upgrade Vehicle Signals: Helios Incandescent: Simple upgrade, subject only to a limit of 8 signals per phase. Helios LED*: Simple upgrade, subject only to a limit of 8 signals per phase. Helios CLS + LMF: Simple upgrade, subject only to a limit of 8 signals per phase. Pedestrian Signals: Near-Side Pedestrian Signals: No need to upgrade – already LED based and should left in place. These units cannot be lamp monitored by any existing or new LV controllers. Far-Side Pedestrian Signals: The upgrade options are more complex and are determined by the presence of wait indicators and the desire to lamp monitor them. * Old style with many discrete LEDs: Lamp monitoring considerations influence the possible upgrade paths

13 Page 13 November-09 Traffic Solutions Deciding which signals to upgrade – Pedestrian options Option 1: Upgrade the red and green men and fit LED wait lamps. In this arrangement lamp monitoring of the waits is not possible, and neither is monitoring of the pedestrian red whilst the wait signal is illuminated. LED wait lamps are not monitorable by the controller, but offer low lower power consumption and reduced maintenance compared to their incandescent equivalents. Option 2: Upgrade the red and green men and continue to use incandescent wait lamps. Without re-configuration lamp monitoring of the waits is not possible, and neither is monitoring of the pedestrian red whilst the wait lamps are illuminated. However reconfiguring the controller and the use of external toroidal current sensors will remove these limitations if lamp monitoring of the incandescent waits is still required * Old style with many discrete LEDs:

14 Page 14 November-09 Traffic Solutions Deciding which signals to upgrade – Pedestrian options Option 3: Where only far sides signals and two incandescent waits are present, replace the Helios incandescent signals with Helios CLS + LMF. In this arrangement lamp monitoring of both the LED signals and incandescent waits is possible without re-configuring the controller (as they both continue to look like incandescent signals to the controller!). This is not a preferred option as it means a mix of standard Helios CLS + LMF and Helios NLM signals on the same site. However it provides a solution where monitoring incandescent wait indicators is desired and a controller reconfiguration is not desired. If the site to be upgraded has other signal arrangements, upgrade may still be possible with a controller re-configuration. Full details of all the possible signal upgrade options that can be attained are to be found in section 5 of the product handbook (667/HB/32921/007).

15 Page 15 November-09 Traffic Solutions The Siemens retrofit – potential power savings Average power Saving v High Intensity signals 21W 50% 8W 80% 9W 78% Indicative power consumptions Helios CLS (with LMF) Helios ELV Helios CLS Retrofit (2) Estimated annual power saving2121 KWh4242 KWh8970 KWh Typical Junctions annual power saving – compared with High Intensity signals Small site – 7x 3 aspect heads, 2 x single aspect arrows Medium site – 14 x 3 aspect heads, 4 x single aspect arrows Large site – 30 x 3 aspect heads, 6 x single aspect arrows 4 Phase8 Phase12 Phase Approximate annual carbon saving 1.2 Tonnes2.3 Tonnes 4.8 Tonnes

16 Page 16 November-09 Traffic Solutions Calculating your own power savings Calculating site power savings is easy with a simple spreadsheet tool. Also provides an indication of annual carbon savings

17 Page 17 November-09 Traffic Solutions Funding options

18 Page 18 November-09 Traffic Solutions Availability and pricing Helios retrofit modules are available immediately Peek Elite retrofit modules will be available from March 2010 Installed price typically around £375* Volume discounts achievable 5 year warranty ST900 LED controller available which will directly drive and monitor Helios LED signals without LMF modules For site / scheme specific pricing talk to your Regional Sales Manager * 3 Aspect Signal

19 Page 19 November-09 Traffic Solutions Summary The Helios retrofit solution offers options for cost effective LED retrofits into existing signal heads Uses high quality LED modules and signal head components Offers significant power savings and carbon footprint reductions compared with traditional incandescent signals Is fully RLM compatible Meets the requirements of TR2210 and TR2500

20 Page 20 November-09 Traffic Solutions Summary Questions……..

21 Copyright © Siemens plc All rights reserved. Siemens CLS LV LED signal retrofit