AARNA Progress Report-June 2017

Similar presentations


Presentation on theme: "AARNA Progress Report-June 2017"— Presentation transcript:

1 AARNA Progress Report-June 2017
MAHENDRA HOMES PVT LTD. AARNA Progress Report-June 2017

2 T1-T2 Block-B up to Terrace
Tower-1,2 Block-B T1-T2 Block-B up to Terrace

3 CLUB HOUSE -Tower-1,2 Block-A ,Block B
Club house Terrace floor , Swimming Fool

4 Tower-B block-B1 Block B1-North Elevation Bock-B1 West Elevation
Bock-B1 East Elevation Block B1-South Elevation

5 B2-South Elevation B2-East Elevation B2-West Elevation B2-West side
Tower-2 Block-B2 B2-South Elevation B2-East Elevation B2-West Elevation B2-West side

6 Tower-1 Block-A A1 Up to terrace Floor

7 TOWER-1 BLOCK A Bock-A1 West Elevation Bock-A1 North Elevation

8 Block –A Middle Podium Block A Middle Podium Column
Footing concreting Work in progress

9 TOWER-2 BLOCK A Tower-2 Block A 4rd Floor roof pour-2 shuttering & Reinforcement work in progress

10 TOWER-2 BLOCK A Tower-2 Block A up to 5th Floor

11 TOWER -1&2 BLOCK- A ,BLOCK -B OVER VIEW

12 THANKING YOU