Requirements for small slaughterhouses Dr Volker Thran Belgrade November 2008.

Similar presentations


Presentation on theme: "Requirements for small slaughterhouses Dr Volker Thran Belgrade November 2008."— Presentation transcript:

1 Requirements for small slaughterhouses Dr Volker Thran Belgrade November 2008

2 Large establishment Operational procedure clean – unclean – slaughter Stable Stunning Bleeding Dehiding Hide removal Flanking Legging Evisceration Splitting Washing Chilling Quartering Thoracic cavity Abdominal cavity Pelvic cavity OUT

3 Large establishment Procedures clean – unclean: Layout / Separation clean - unclean Stable Stunning Bleeding Dehiding Hide removal Flanking Legging Evisceration Splitting Washing Chilling Quartering Thoracic cavity Abdominal cavity Pelvic cavity OUT Separate access Red offal room Green offal room Hide room Separate access Separate room Separate access

4 Large establishment Procedure clean – unclean : Technical equipment Stable Stunning Bleeding Dehiding Hide removal Flanking Legging Evisceration Splitting Washing Chilling Quartering Thoracic cavity Abdominal cavity Pelvic cavity OUT Stand rails Sand – chute – collection Hide puller Separate room Stand Hoist, collection Stunning box Pens, races Knife Steris Apron Wash Cabinets Stand rails +

5 Small establishment Operational procedure clean – unclean : Short comings Stable` Washing Splitting Evisceration Dehiding Bleeding Stunnng Chilling Quartering Thoracic cavity Abdominal cavity Pelvic cavity Hide removal Flanking Legging 1. No (insufficient) lay-out No separation clean-dirty 2. No (insuff.) technical equipment No technical support of hygiene operation 3. No operational procedures from clean to unclean The hygiene of operational procedures is very dependent on workers

6 Small establishment Example Change Stunning Bleeding Unclean Clean Hoist Cradle Chiller Quarter out Chiller

7 SMALL ESTBLISHMENT Shortcomings in Lay - out Access to slaughter room  Door to outside / stable open  No proper hygiene barrier  Doors / windows / drains not closing tightly No separation between:  “unclean” and “clean” workplaces No separation between:  Wast – green offal – red offal Cleaning stations in wrong place(s)

8 SMALL ESTABLISHMENT Shortcomings Technical Equipment Walls / floors / ceilings / drains / lamps / windows / doors – repairs Washbasins – insufficient Sterilizers  Knives / saws – insufficient Apron wash cabinets  Insufficient, wrong place – not existing

9 SMALL ESTABLISHMENT Shortcomings Technical Equipment Hooks / recipients  Broken / High pressure hoses  Floor cleaning Hoists Chilling rooms

10 SMALL ESTABLISHMENTS Shortcomings in operational procedures “Unclean” procedures Stable  Segregated on arrival on time Stunning  Segregated room; properly constructed stunning box

11

12

13

14 SMALL ESTABLISHMENTS Shortcomings in operational procedures “Unclean” procedures Bleeding  Hanging; correct cut Rodding  Stick (corkscrew) / cylinder

15

16

17 SMALL ESTABLISHMENT Shortcomings in operational procedures “Unclean” procedures Dehiding  Cradle - not on floor / Hoisting - HANGING  Feet  Hindlegs  Stomach  Flank  Breast  Front legs  Tail – Freeing and dropping the bung  Hide removal

18

19 SMALL ESTABLISHMENT Shortcomings in operational procedures “Clean” procedures Evisceration  Pelvic cavity Usually no problem. Place onto stomach, do not let hang.  Abdominal cavity Get oesophagus in first. Do not touch carcass  Thoracic: Usually no problem Splitting: axe – saw Washing  Thoracic cavity only.  High volume; low pressure