1BED & 2 BED APARTMENTS – TOTAL 40 UNITS
4
TOP FLOOR BRICK WORK IN PROGRESS
6
TERRACE SLAB – SHUTTERING IN PROGRESS
9
PLASTER IN TERRACE UNDER PROGRESS BLOCK 2 – 3 RD SLAB IN PROGRESS TERRACE SLAB – REINFORCEMENT WORK IN PROGRESS
10
THIRD SLAB WORK IN PROGRESS SHUTTERING COMPLETE
11
BLOCK TWO BRICKWORK IN PROGRESSSHUTTERING FOR THIRD SLAB IN PROGRESS BLOCK 2 – 3 RD SLAB IN PROGRESSTERRACE SLAB FOR BOTH BLOCKS
12
SHUTTERING FOR THIRD SLAB IN PROGRESS BLOCK 2 – 3 RD SLAB COMPLETEREINFORCEMENT WORK COMPLETE
13
FIXING OF WINDOW & DOORS IN PROGRESS BLOCK 2 – 3 RD TOP FLOOR BRICK WORK IN PROGRESS
14
STAIRCASE PLASTER IN PROGRESS
15
PLASTER IN STAIRCASE IN PROGRESS GROUND FLOOR LOBBY
16
EXTERNAL PLASTER IN AT FIRST FLOOR IN PROGRESS INTERNAL PLASTER IN PROGRESSPLASTER WORK AT UPPER LEVELS
17
PLASTER IN LOBBY AT GROUND FLOOR COMPLETE DOOR FRAMES BEING FIXED
18
INTERNAL PLASTER AT GROUND FLOOR COMPLETE KITCHEN WORK - AT UPPER LEVELS
19
KITCHEN AT UPPER FLOOR LEVELS DOORS TO ACCESS TERRACES AT UPPER LEVELS
20
KITCHEN PLATFORM FINISHING IN PROGRESS