Presentation is loading. Please wait.

Presentation is loading. Please wait.

Team # 2 022811 강준홍 022824 김상민 022867 박창연 022919 이재형 022939 전중수.

Similar presentations


Presentation on theme: "Team # 2 022811 강준홍 022824 김상민 022867 박창연 022919 이재형 022939 전중수."— Presentation transcript:

1 Team # 2 022811 강준홍 022824 김상민 022867 박창연 022919 이재형 022939 전중수

2 Part 5 : Performance Part 4 : Electric Part 3 : Sub - System Part 2 : Air vehicle Part 1 : System Project Overview 조원소개, Project 목적

3 Chief engineer & Performance engineer 022824 김상민 Air vehicle engineer 022919 이재형 Sub system engineer 022939 전중수 Electric engineer 022867 박창연 Weight engineer 022811 강준홍 RQ-7 A/B Shadow 200

4 우리는 왜 term project 를 하는가 ? 우리는 왜 term project 를 하는가 ? 습득된 이론적 지식 Project 실제 UAV 적용 미래 공학도로서의 자질 향상

5  Army Shadow 200 UAV  Developed 1999  Used in Iraq  Remove pilots from danger  Carries high-resolution video camera  Flies via GPS (Global Positioning System)  Automatic take-off and landing

6

7

8

9

10 Length 11.17ftMax. Speed 118 knots Wingspan 14 ftCruise Speed 90 knots Max. Gross Wt. 375 lbs.Loiter Speed 60 knots Payload Wt 45-60 lbs. *Max. Altitude 15,000-19,000 ft * Data Link Range 125 kmEndurance 6-7 hrs * (options for 200 Km range)Engine 38 bhp (UEL741)

11 RQ-7ARQ-7B Length11.2ft (3.4m) Wingspan12.9ft14ft Height3ft Weightmax:328lb, empty:165lb max:375lb, empty:165lb Speedmax:110kts, loiter:70kts max:105kts, loiter:60kts Cruise Speed82~90kts Ceiling14000ft15000ft Range67nm Endurance5h7h PropulsionUEL AR-741 rotary engine ; 38hp Fuel capacity40liter50liter

12

13 Boom-mounted Inverted V tailLaunch and Recovery

14

15 Strong Points 레이더반사면적 (Radar Cross Section) 감소로 생존 가능성 증가 표면적 감소로 인한 항력 감소 엔진을 보호 Weak Points 단일동체보다 무거움 소음이 크다 구조가 복잡하다

16 Airfram e Max Speed Cruis e Speed Min. Endurance SpanEngineDry Weight Payload T-16XL805016132.54020 Pioneer-6451626-- Shadow11890412.838-50 Scan Eagle 705020101.5-13.2 Viking 300 70568~1016.522.521030 Blue Horizon 2 120701621.3--81.6

17

18

19

20 Features Range : 30 KM Weight : 60 lbs Ruggedized Workstation GCS Compatible AV Control/Status, Map & Video on One Screen

21

22

23

24

25

26 Boom-mounted Inverted V tailLaunch and Recovery

27

28 Launch Hydraulic Rail Launch ( 유압레일발사체 ) Launch on road, runway and flat surface Recovery Auto recovery on flat terrain with arresting cables Emergency recovery with parachute

29

30

31

32

33

34

35

36

37

38


Download ppt "Team # 2 022811 강준홍 022824 김상민 022867 박창연 022919 이재형 022939 전중수."

Similar presentations


Ads by Google