Presentation is loading. Please wait.

Presentation is loading. Please wait.

Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization

Similar presentations


Presentation on theme: "Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization"— Presentation transcript:

1 Planning for Performance Based Navigation: Airspace Concept and Implementation Processes
Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization U.S. Federal Aviation Administration

2 Overview PBN Snapshot: Components, Elements
What is an Airspace Concept? Airspace Concept: Strategic Considerations Airspace Concept: Navigation Specifications by Domain Implementation Processes in the ICAO PBN Manual

3 Key Components RNAV RNP
104 137 65 RNAV - a method of navigation enabling aircraft to fly on any desired flight path within the coverage of referenced NAVAIDS or within the limits of the capability of self-contained systems, or a combination of these capabilities RNP is RNAV operations with the added feature of on-board navigation performance monitoring and alerting RNP 104 137 65

4 PBN Elements: A Snapshot
Navigation Specification Navaid Infrastructure Application RNP RNAV PBN

5 What is an Airspace Concept?
General Vision or Master Plan for particular airspace Geared towards Strategic Objectives Covers all elements of CNS/ATM PBN is only the “N” in CNS/ATM

6 Airspace Concept: Strategic Objective Considerations
Safety? Capacity? Efficiency? Environment? Access? AIRSPACE CONCEPT COM NAV SUR ATM

7 Airspace Concept: Navigation Specifications By Domain (1)
Oceanic & Remote Continental RNAV 10 (50/50) – e.g. Pacific RNP 4 (30/30) – e.g. Tasman Sea Continental En Route RNAV 5 – e.g. EUR Continental RNAV 2 – e.g. US Continental

8 Airspace Concept: Navigation Specifications By Domain (2)
Terminal: Arrival and Departure RNAV 1 – EUR and US terminal airspace Basic RNP 1 – Future low density airspace Approach RNP APCH – US and EUR RNP AR APCH – US & various other

9 Implementation Processes
ICAO PBN Manual – Doc 9613 (Revised) Process 1 – Determining Requirements Process 2 – Identifying ICAO Navigation Specification(s) for Implementation Process 3 – Planning and Implementation All 3 Processes need the combined efforts of regulators, service providers, users to be effective

10 Implementation Process 1
Determining Requirements Formulate Airspace Concept Assess Fleet Capability & NAVAID Infrastructure Assess Comm, Surveillance, ATM System Identify necessary navigation functions

11 Implementation Process 2
Identifying ICAO Navigation Specification(s) for Implementation Review ICAO Navigation Specifications Can fleet capability, CNS/ATM infrastructure support? If necessary, can trade-offs to requirements be made? Select ICAO Navigation Specification(s)

12 Implementation Process 3
Planning and Implementation Route / procedure placement, design, validation, pilot and controller training, automation implementation activities in 10 steps 1-Formulate Safety Plan 4-Design Review (Ground) 7-ATC System Integration 2- Validate Airspace Concept 5-Implementation Decision 8-Training/Awareness 3- Design Procedures/Routes 6-Flight Inspection/Validation 9-Implementation Date 10-Post Implementation Review

13 Thank you


Download ppt "Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization"

Similar presentations


Ads by Google