Presentation is loading. Please wait.

Presentation is loading. Please wait.

EUR PBN TF PBN ICAO HQ Activities Overview. page 2 PBN - Where are we now? Current PBN concept –Globally harmonized navigation specification based on.

Similar presentations


Presentation on theme: "EUR PBN TF PBN ICAO HQ Activities Overview. page 2 PBN - Where are we now? Current PBN concept –Globally harmonized navigation specification based on."— Presentation transcript:

1 EUR PBN TF PBN ICAO HQ Activities Overview

2 page 2 PBN - Where are we now? Current PBN concept –Globally harmonized navigation specification based on existing national or regional requirement –Objective: facilitation of standardization with the aim to reduce cost, confusion and accelerate implementation 02 July 2012

3 PBN - Where are we now? PBN concept developments –Builds on existing requirements –Adds new specifications to address operational requirements –Curtails the proliferation of number of navigation specifications page 3 New Edition Updated PBN Manual (Advance copy): – 1st week of July July 2012

4 PBN - Where are we now? Updated PBN Manual - highlights RNP 2 –High continuity (typically oceanic/remote applications) –Low continuity (typically continental applications) RNP 0.3 –Intended for slow moving aircraft Radius-to-fix (RF) (terminal and approach) Fixed Radius Transitions (FRT) (en-route) Advanced RNP (umbrella navigation specification) High level ops approval guidance Improved implementation process description 02 July 2012page 4

5 Advanced RNP RNAV 1 RNAV 2 RNAV 5 RNP APCH RNP 1 A-RNP RNAV 10 RNP 4 RF legs Parallel offset RNAV holding Optional Performance/Functionality RNP Scalability RNP 2 oceanic/remote Fixed Radius Transition (FRT) Time of Arrival Control Barometric VNAV Continental en-route: RNP 2,1 Final approach: RNP 0.3 A-RNP + options 02 July 2012page 5

6 Just Published page 6 Flight Validation 02 July 2012

7 Validation Process page 702 July 2012

8 ATM / Airspace Planning and Design Support Continuous Climb Operations (CCO) Manual –Advance copy by July 2012 PBN Airspace Concepts Manual –Advance copy by July 2012 ilearn information/workshop package on PBN airspace design –August 2012 page 802 July 2012

9 Flight Operations Support PBN Operations Approval Manual –Under review by PBN Operations Approval Tiger Team –Advance copy by September 2012 ilearn information/workshop package on PBN Operations Approval –September 2012 page 902 July 2012

10 PBN General PBN Manual next edition –Advance copy July 2012 ilearn information/workshop package on PBN overview –September 2012 Online PBN implementation status tool –September 2012 page 1002 July 2012

11 PBN General PBN Implementation toolkit addressing: –Executives –Regulators –ANSPs –Aircraft operators –Manufacturers September 2012 page 1102 July 2012

12 PBN General Instrument Flight Procedures (a summary) Criteria to support new edition of PBN Manual Improved Baro-VNAV criteria Helicopter criteria Sample charts –State Letter after IFPP/11 (December 2012) page 1202 July 2012

13 PBN General (Planning) ilearn information/workshop/training package on PBN for other domains –ATC –Pilots –Flight validation Endorsement programme for service providers page 13 Planning 02 July 2012

14 PBN General (Planning) Collision Risk Model for PBN obstacle clearance and air-to-air separation –Combined effort IFPP and SASP PBN Procedure Design Safety Assessment Manual Advanced RNP support document page 14 Planning 02 July 2012

15 Objectives New PBN documentation information Status of global implementation Identify implementation issues and problems Development of a global action plan to support implementation Plan to be presented to ANC/12 Register at 02 July 2012page 15


Download ppt "EUR PBN TF PBN ICAO HQ Activities Overview. page 2 PBN - Where are we now? Current PBN concept –Globally harmonized navigation specification based on."

Similar presentations


Ads by Google