A roofing tile which has the shape of an “S” laid on its side is a
Mission tile pantile French tile
2
A roofing tile which has the shape of an “S” laid on its side is a
Mission tile pantile French tile
3
That part of the building foundation which forms the permanent retaining wall of the structure below grade is a foundation course grade beam foundation wall
4
That part of the building foundation which forms the permanent retaining wall of the structure below grade is a foundation course grade beam foundation wall
5
Joint employed to reduce restraint by accommodating movement of masonry walls are known as
cold joints control joints block outs
6
Joint employed to reduce restraint by accommodating movement of masonry walls are known as
cold joints control joints block outs
7
A system of framing a building in which the studs are continuous to roof supporting second floor joints is known as post and beam western framing balloon framing
8
A system of framing a building in which the studs are continuous to roof supporting second floor joints is known as post and beam western framing balloon framing
9
Rough plaster finish obtained by flinging plaster on a wall with a hand operated machine is
tryolean finish trowel finish broom stripped finish
10
Rough plaster finish obtained by flinging plaster on a wall with a hand operated machine is
tryolean finish trowel finish broom stripped finish
11
A principal member of the truss which extends from one end to the other primarily to resist bending is a web member girt chord
12
A principal member of the truss which extends from one end to the other primarily to resist bending is a web member girt chord
13
A protein: the chief nitrogenous ingredient in milk is
Casein Tempera alabaster
14
A protein: the chief nitrogenous ingredient in milk is
Casein Tempera alabaster
15
a composition of two or more metals fused together usually to obtain a desired property
annealing alloy built-up
16
a composition of two or more metals fused together usually to obtain a desired property
annealing alloy built-up
17
The horizontal distance from the face of a lock or latch to the center of the knob or lock cylinder
Backset backfill built-up
18
The horizontal distance from the face of a lock or latch to the center of the knob or lock cylinder
Backset backfill built-up
19
A commercially pure iron of fibrous nature, valued for its corrosion resistance and ductility is
cast iron black iron wrought iron
20
A commercially pure iron of fibrous nature, valued for its corrosion resistance and ductility is
cast iron black iron wrought iron
21
The Filipino term for horizontal stud is
Pabalagbag Tahilan pilareta
22
The Filipino term for horizontal stud is
Pabalagbag Tahilan pilareta
23
The Filipino term for riser
Muldura takip silipan planehuelda
24
The Filipino term for riser
Muldura takip silipan planehuelda
25
The Filipino term for collar plate is
Hardinera Guililan sinturon
26
The Filipino term for collar plate is
Hardinera Guililan sinturon
27
The Filipino term for temper (metal work)
Suban Espolon poleva
28
The Filipino term for temper (metal work)
Suban Espolon poleva
29
The Filipino term for plumb line is
Pantilya Asintada hulog
30
The Filipino term for plumb line is
Pantilya Asintada hulog
31
A beam that projects beyond one or both its support
continuous cantiliver tie
32
A beam that projects beyond one or both its support
continuous cantiliver tie
33
A wall (bearing or non-bearing) designed to resist lateral forces parallel to the wall
prefabricated shear
34
A wall (bearing or non-bearing) designed to resist lateral forces parallel to the wall
prefabricated shear
35
Using stair tread-riser proportion formula RT = 75, given riser equals 6 ¼ “ how many risers will there be between two floors having floor line to floor line distance of feet? 15 17 19
36
Using stair tread-riser proportion formula RT = 75, given riser equals 6 ¼ “ how many risers will there be between two floors having floor line to floor line distance of feet? 15 17 19
37
A modern method of installing wood parquet flooring on wooden boards sub-flooring is by
gluing/pasting nailing into battens wainscoting
38
A modern method of installing wood parquet flooring on wooden boards sub-flooring is by
gluing/pasting nailing into battens wainscoting
39
The standard height of window sills for office rooms in upper floors is
1.2 meters 0.60 meters 0.90 meters
40
The standard height of window sills for office rooms in upper floors is
1.2 meters 0.60 meters 0.90 meters
41
The dimension of commercial acoustic boards for aluminum T-runners used for dropped-ceiling in offices is 30” x 60” x 1” 24” x 50” x 7/8” 24” x 48” x ½”
42
The dimension of commercial acoustic boards for aluminum T-runners used for dropped-ceiling in offices is 30” x 60” x 1” 24” x 50” x 7/8” 24” x 48” x ½”
43
The total floor area 16 feet wide by 60 feet deep needs one inch (1”) x 4”(commercial size) T & G flooring. Assuming that the available T & G is 1” x 4” x 16” and the effective width is 3.5” , the total board feet needed is 1,280 bf 1,098 bf 1,330 bf
44
The total floor area 16 feet wide by 60 feet deep needs one inch (1”) x 4”(commercial size) T & G flooring. Assuming that the available T & G is 1” x 4” x 16” and the effective width is 3.5” , the total board feet needed is 1,280 bf 1,098 bf 1,330 bf
45
In the design of a large shopping centers where space is required, intervals of columns can be wider than the ordinary by adopting a structural method of construction called compressioning post-tensioning pre-casting
46
In the design of a large shopping centers where space is required, intervals of columns can be wider than the ordinary by adopting a structural method of construction called compressioning post-tensioning pre-casting
47
Humidification and condensation in exterior walls can be minimized by
providing stud space between exterior finish and interior finish providing building paper sheathing providing building paper sheathing and space filled
48
Humidification and condensation in exterior walls can be minimized by
providing stud space between exterior finish and interior finish providing building paper sheathing providing building paper sheathing and space filled
49
Heat gain through the structure of a habitable room occur in tropical region at walls and roofs by conduction. This can be minimized by the use of wood concrete steel
50
Heat gain through the structure of a habitable room occur in tropical region at walls and roofs by conduction. This can be minimized by the use of wood concrete steel
51
A material used to remedy vapor flow
glossy surfaced asphalt saturated paper, 50 lbs or more wall paper asbestos cement board
52
A material used to remedy vapor flow
glossy surfaced asphalt saturated paper, 50 lbs or more wall paper asbestos cement board
53
Dry walls do not require appreciable amount of moisture and they are customarily finished with
mortar and cement plywood on studs lath and plaster
54
Dry walls do not require appreciable amount of moisture and they are customarily finished with
mortar and cement plywood on studs lath and plaster
55
Wallboards or plywood maybe applied over studs
Wallboards or plywood maybe applied over studs. They can also be applied over CHB masonry wall by using wood battens furring sheathing
56
Wallboards or plywood maybe applied over studs
Wallboards or plywood maybe applied over studs. They can also be applied over CHB masonry wall by using wood battens furring sheathing
57
Identify the miter joint from the following
58
Identify the miter joint from the following
59
To turn back water whenever joints occur in which dissimilar materials come together, it is necessary to provide flashing material binding material counter flushing
60
To turn back water whenever joints occur in which dissimilar materials come together, it is necessary to provide flashing material binding material counter flushing
61
The part of a foundation system which supports the exterior walls of a superstructure and bears directly on the column footing is a foundation course grade beam foundation wall
62
The part of a foundation system which supports the exterior walls of a superstructure and bears directly on the column footing is a foundation course grade beam foundation wall
63
A narrow strip of wood applied to cover a joint along the edges of two parallel boards in the same plane is a fillet cant strip batten
64
A narrow strip of wood applied to cover a joint along the edges of two parallel boards in the same plane is a fillet cant strip batten
65
The stressing of unbounded tendons after concrete has cured is
post-tensioning pre-casting lift slab
66
The stressing of unbounded tendons after concrete has cured is
post-tensioning pre-casting lift slab
67
The boxing in of covering a joist, beam or girder to give the appearance of a larger beam is known as beam formworks beam blocking grade beam
68
The boxing in of covering a joist, beam or girder to give the appearance of a larger beam is known as beam formworks beam blocking grade beam
69
A system of framing a building on which floor joists of each storey rest on the top plates of the storey below and the bearing walls and partitions rest on the subfloor of each storey is known as balloon framing flank framing western framing
70
A system of framing a building on which floor joists of each storey rest on the top plates of the storey below and the bearing walls and partitions rest on the subfloor of each storey is known as balloon framing flank framing western framing
71
Pressure exerted against the underground portion of a building created by the presence of water in the soil is known as soil bearing pressure hydrostatic pressure atmospheric pressure
72
Pressure exerted against the underground portion of a building created by the presence of water in the soil is known as soil bearing pressure hydrostatic pressure atmospheric pressure
73
A window which projects outside the main line of a building and the compartment in which it is located extends to the floor is known as bay window hopper window oriel window
74
A window which projects outside the main line of a building and the compartment in which it is located extends to the floor is known as bay window hopper window oriel window
75
A form of brick bond in which each course is alternately composed of entirely of headers or of stretchers is known as common bond flemish bond english bond
76
A form of brick bond in which each course is alternately composed of entirely of headers or of stretchers is known as common bond flemish bond english bond
77
A joint formed when a concrete surface hardens before the next batch of concrete is placed against it is block out cold joint control joint
78
A joint formed when a concrete surface hardens before the next batch of concrete is placed against it is block out cold joint control joint
79
An iron alloy usually including carbon and silicon which has high compressive strength but low tensile strength is pig iron cast iron wrought iron
80
An iron alloy usually including carbon and silicon which has high compressive strength but low tensile strength is pig iron cast iron wrought iron
81
The Filipino term for plastered course is
lastilyas moneyka kusturada
82
The Filipino term for plastered course is
lastilyas moneyka kusturada
83
The Filipino term for bottom chord is
barakilan sibe estunyo
84
The Filipino term for bottom chord is
barakilan sibe estunyo
85
The Filipino term for perlin is
tahilan balangkas reostra
86
The Filipino term for perlin is
tahilan balangkas reostra
87
The Filipino term for eave is
sopo tabike sibe
88
The Filipino term for eave is
sopo tabike sibe
89
The Filipino term for top chord is
tahilan baytang sinturon
90
The Filipino term for top chord is
tahilan baytang sinturon
91
1” thick V-cut wood boards Synthetic adobe finish on R.C. wall
The capacity of a wall to hold moisture is important in the design of dwelling units. Select the best material which will reduce moisture in a wall when used CHB S-cut joint finish 1” thick V-cut wood boards Synthetic adobe finish on R.C. wall
92
1” thick V-cut wood boards
The capacity of a wall to hold moisture is important in the design of dwelling units. Select the best material which will reduce moisture in a wall when used CHB S-cut joint finish 1” thick V-cut wood boards Synthetic adobe finish on R.C. wall
93
Plaster or plywood ceiling on nailers or joists below a ventilated roof space may show “pattern staining” on the ceiling. This can be prevented by cleaning adequate insulation re-painting
94
Plaster or plywood ceiling on nailers or joists below a ventilated roof space may show “pattern staining” on the ceiling. This can be prevented by cleaning adequate insulation re-painting
95
combination of wood boards and plywood with cavity between
Heat gain through the walls in buildings exposed to afternoon sun intensifies discomfort of inhabitants because of conductivity. However, this can be minimized by the use of combination of wood boards and plywood with cavity between thick reinforced concrete wall steel sheets
96
combination of wood boards and plywood with cavity between
Heat gain through the walls in buildings exposed to afternoon sun intensifies discomfort of inhabitants because of conductivity. However, this can be minimized by the use of combination of wood boards and plywood with cavity between thick reinforced concrete wall steel sheets
97
double wall plywood on horizontal and vertical studs with absorbents
Sound or noise between bedrooms may be reduced by using less expensive materials with the application of construction techniques double wall plywood on horizontal and vertical studs with absorbents solid 6” R.C. wall sawali on 2” x 2” studs
98
double wall plywood on horizontal and vertical studs with absorbents
Sound or noise between bedrooms may be reduced by using less expensive materials with the application of construction techniques double wall plywood on horizontal and vertical studs with absorbents solid 6” R.C. wall sawali on 2” x 2” studs
99
The staircase of a house has a total run of 3 meters and a total rise of 2.16 meters, the tread width is 11 inches and riser is 7 7/8”, therefore, the stringer length is 3.20 meters 3.69 meters 3.75 meters
100
The staircase of a house has a total run of 3 meters and a total rise of 2.16 meters, the tread width is 11 inches and riser is 7 7/8”, therefore, the stringer length is 3.20 meters 3.69 meters 3.75 meters
101
Dry walls are customarily finished with
lath and plaster mortar and hollow blocks reinforced concrete
102
Dry walls are customarily finished with
lath and plaster mortar and hollow blocks reinforced concrete
103
The riser of a stair is 6 ½ inches
The riser of a stair is 6 ½ inches. What is the run using formula R/T = tan (R-3) x 8 degrees inches inches inches
104
The riser of a stair is 6 ½ inches
The riser of a stair is 6 ½ inches. What is the run using formula R/T = tan (R-3) x 8 degrees inches inches inches
105
One method of leveling batterboards without the transit is the use of
¼ Ø plastic hose filled with water eyesight plumb bob
106
One method of leveling batterboards without the transit is the use of
¼ Ø plastic hose filled with water eyesight plumb bob
107
2-3-4 multiples with the use of transit
A manual method of squaring the corners of a building lines in building layout, is the use of 2-3-4 multiples with the use of transit 3-4-5 multiples with the use of steel tape measure 4-5-4 multiples and strings
108
3-4-5 multiples with the use of steel tape measure
A manual method of squaring the corners of a building lines in building layout, is the use of 2-3-4 multiples with the use of transit 3-4-5 multiples with the use of steel tape measure 4-5-4 multiples and strings
109
felt paper below sub-slab then WP on top of the sub-slab
When dry conditions are demanded of asphalt tile floor finishes on concrete over earth, apply the waterproofing (WP) steps felt paper below sub-slab then WP on top of the sub-slab felt paper below the top slab then WP the earth WP the earth under slab
110
felt paper below sub-slab then WP on top of the sub-slab
When dry conditions are demanded of asphalt tile floor finishes on concrete over earth, apply the waterproofing (WP) steps felt paper below sub-slab then WP on top of the sub-slab felt paper below the top slab then WP the earth WP the earth under slab
111
Due to temperature effects in materials, concrete walls, slabs of long buildings, new buildings adjoining existing buildings should be provided with flashing welded joints expansion joints
112
Due to temperature effects in materials, concrete walls, slabs of long buildings, new buildings adjoining existing buildings should be provided with flashing welded joints expansion joints
113
A typical block or panel type insulating material used in flat roof of commercial or industrial building corkboard acacia lumber washed pebbles
114
A typical block or panel type insulating material used in flat roof of commercial or industrial building corkboard acacia lumber washed pebbles
115
What is the height of the RC curtain wall surrounding a water tank located at the penthouse whose capacity is 5000 U.S. gallons. The diameter of the tank is 2.5 meters (I.D.) and freeboard of 0.30 meters. The wall shall be as high as the water tank. 4.00 meters 4.19 meters 4.16 meters
116
What is the height of the RC curtain wall surrounding a water tank located at the penthouse whose capacity is 5000 U.S. gallons. The diameter of the tank is 2.5 meters (I.D.) and freeboard of 0.30 meters. The wall shall be as high as the water tank. 4.00 meters 4.19 meters 4.16 meters
117
columns, splices, materials, lot roofing sheets, function, elevation
Select the grouping one subject of which is a criterion used by architects in planning and design of buildings columns, splices, materials, lot roofing sheets, function, elevation concrete, lumber, steel, cement
118
columns, splices, materials, lot
Select the grouping one subject of which is a criterion used by architects in planning and design of buildings columns, splices, materials, lot roofing sheets, function, elevation concrete, lumber, steel, cement
119
wall or part of several walls
Narrow, high ceiling spaces where ceiling area is small compared to wall area, will normally require acoustical treatment of the wall or part of several walls floor and ceiling ceiling only
120
wall or part of several walls
Narrow, high ceiling spaces where ceiling area is small compared to wall area, will normally require acoustical treatment of the wall or part of several walls floor and ceiling ceiling only
121
A ferrous metal that offers great resistance to abrassion and finds important use in the cutting edges of heavy digging tools is a alloy steel nickel steel manganese steel
122
A ferrous metal that offers great resistance to abrassion and finds important use in the cutting edges of heavy digging tools is a alloy steel nickel steel manganese steel
123
A building stone of igneous origin and composed of quartz, hornblende and mica is a
travertine serpentine granite
124
A building stone of igneous origin and composed of quartz, hornblende and mica is a
travertine serpentine granite
125
A form of brick bond in which the course consists of alternate stretchers and headers in known as
flemish bond english bond common bond
126
A form of brick bond in which the course consists of alternate stretchers and headers in known as
flemish bond english bond common bond
127
A system of framing a building on which floor joist of each storey rests on the top plates of the storey below and the bearing walls and partitions rest on the subfloor of each storey is known as western framing balloon framing flank framing
128
A system of framing a building on which floor joist of each storey rests on the top plates of the storey below and the bearing walls and partitions rest on the subfloor of each storey is known as western framing balloon framing flank framing
129
The Filipino term for rabbet
palitada asintada vaciada
130
The Filipino term for rabbet
palitada asintada vaciada
131
The Filipino term for projection is
alahado bolada asinta
132
The Filipino term for projection is
alahado bolada asinta
133
Given a riser equals six inches and using the stair tread-riser proportion formula 2R + T = 25, how many risers wil there be between two levels having a vertical distance of 9’-0” 18 risers 16 risers 17 risers
134
Given a riser equals six inches and using the stair tread-riser proportion formula 2R + T = 25, how many risers wil there be between two levels having a vertical distance of 9’-0” 18 risers 16 risers 17 risers
135
particle size distribution
A geological or ground condition considered in determining the size and type of foundation of the building soil chemistry soil bearing pressure particle size distribution
136
particle size distribution
A geological or ground condition considered in determining the size and type of foundation of the building soil chemistry soil bearing pressure particle size distribution
137
These are materials excellent as vapor barrier in the roofing system of residential buildings
particle board lawanit boards aluminum foil sheets
138
These are materials excellent as vapor barrier in the roofing system of residential buildings
particle board lawanit boards aluminum foil sheets
139
The chief structural materials, used for tall buildings are
built-up beams, girders, foundations cement, deformed wrought iron, gravel and sand reinforced concrete and high grade steel
140
The chief structural materials, used for tall buildings are
built-up beams, girders, foundations cement, deformed wrought iron, gravel and sand reinforced concrete and high grade steel
141
glass blocks, 5000 psi concrete
These are classified as good and less expensive insulating materials used in buildings glass blocks, 5000 psi concrete porous concrete, glass fibers, guilt materials steel plates, marble slabs, granite
142
porous concrete, glass fibers, guilt materials
These are classified as good and less expensive insulating materials used in buildings glass blocks, 5000 psi concrete porous concrete, glass fibers, guilt materials steel plates, marble slabs, granite
143
asbestos-cement shingles
This is a material that holds less moisture, is very light, less water absorptive capacity and is very good in sidings of dwelling units vinyl shingles asbestos-cement shingles wood boards
144
asbestos-cement shingles
This is a material that holds less moisture, is very light, less water absorptive capacity and is very good in sidings of dwelling units vinyl shingles asbestos-cement shingles wood boards
145
The toilet bathroom floor finish is designed to be at least one inch below the bedroom floor finish. What should be the vertical distance between the bedroom floor finish and the top line of the 2” x 6” yacal floor joists which carry the toilet bath floor system assuming that ¼” thick mosaic vitrified tiles will be used in the toilet bathroom on 4” RC slab with membrane waterproofing, using standard acceptable measurement of materials for residential houses 3 ½ inches 3 ¼ inches 6 ¼ inches
146
The toilet bathroom floor finish is designed to be at least one inch below the bedroom floor finish. What should be the vertical distance between the bedroom floor finish and the top line of the 2” x 6” yacal floor joists which carry the toilet bath floor system assuming that ¼” thick mosaic vitrified tiles will be used in the toilet bathroom on 4” RC slab with membrane waterproofing, using standard acceptable measurement of materials for residential houses 3 ½ inches 3 ¼ inches 6 ¼ inches
147
A Howe Truss is being considered to support the roofing system of a residential building. The pitch of the truss is 1 vertical 3 horizontal. What is the total length of the top chord, if the span of truss is 12 meters and the eave is 1.5 meters horizontally? 7.555 meters 7.906 meters 7.567 meters
148
A Howe Truss is being considered to support the roofing system of a residential building. The pitch of the truss is 1 vertical 3 horizontal. What is the total length of the top chord, if the span of truss is 12 meters and the eave is 1.5 meters horizontally? 7.555 meters 7.906 meters 7.567 meters
149
The finished frame surrounding a door is a
door frame door jamb door casing
150
The finished frame surrounding a door is a
door frame door jamb door casing
151
A door lock with a spring bolt controlled by one or both knobs and dead bolt controlled by a key is a knob bolt knob latch knob lock
152
A door lock with a spring bolt controlled by one or both knobs and dead bolt controlled by a key is a knob bolt knob latch knob lock
153
A door consisting of two separate leaves, one above the other, this leaves may operate independently or together is a dwarf door dutch door window door
154
A door consisting of two separate leaves, one above the other, this leaves may operate independently or together is a dwarf door dutch door window door
155
A joint formed by overlapping the edges of metal sheet or plated and joining them by riveting, soldering or brazing is a lap joint lap seam lap splice
156
A joint formed by overlapping the edges of metal sheet or plated and joining them by riveting, soldering or brazing is a lap joint lap seam lap splice
157
A clay roofing tile approximately semi cylindrical in shape laid in courses with units having their convex side alternately up and down is a pantile mission tile roman tile
158
A clay roofing tile approximately semi cylindrical in shape laid in courses with units having their convex side alternately up and down is a pantile mission tile roman tile
159
The part of a foundation system which supports the exterior wall of the super structure and bears directly on the column footing is a grade beam foundation wall foundation course
160
The part of a foundation system which supports the exterior wall of the super structure and bears directly on the column footing is a grade beam foundation wall foundation course
161
A commercially pure iron of fibrous nature, valued for its corrosion resistance and ductility is a
cast iron wrought iron pig iron
162
The wall of Intramuros is
an aqueduct a fortification a moat
163
The wall of Intramuros is
an aqueduct a fortification a moat
164
The Filipino term for rafter is
guililan sepo kilo
165
The Filipino term for rafter is
guililan sepo kilo
166
The Filipino term for baseboard is
rodapis perdano batidora
167
The Filipino term for baseboard is
rodapis perdano batidora
168
A climatic factor that is considered in the structural and architectural design of tall buildings
thunderstorm gusts lightning
169
A climatic factor that is considered in the structural and architectural design of tall buildings
thunderstorm gusts lightning
170
loam and clay formation
This is a ground condition that determines the size, type and shape of the building footing/foundation soil bearing pressure loam and clay formation adobe underlay
171
loam and clay formation
This is a ground condition that determines the size, type and shape of the building footing/foundation soil bearing pressure loam and clay formation adobe underlay
172
What is the height of a curtain wall for a downfeed water tank at the deck roof with 60,000 gallons capacity and diameter of 3 meters, freeboard of 0.30 meters, shall be as high as the water tank 3.513 meters 3.550 meters 3.625 meters
173
What is the height of a curtain wall for a downfeed water tank at the deck roof with 60,000 gallons capacity and diameter of 3 meters, freeboard of 0.30 meters, shall be as high as the water tank 3.513 meters 3.550 meters 3.625 meters
174
colored roofing sheets, esthetics, symmetry of windows
Select the grouping one subject of which is a general criterion used by architects in planning and design of buildings colored roofing sheets, esthetics, symmetry of windows columns, doors, windows, split type concrete, steel and wood, type of floor finish
175
concrete, steel and wood, type of floor finish
Select the grouping one subject of which is a general criterion used by architects in planning and design of buildings colored roofing sheets, esthetics, symmetry of windows columns, doors, windows, split type concrete, steel and wood, type of floor finish
176
The most common materials used for roofing of urban residential houses
R.C. slabs wood shingles G.I. sheets
177
The most common materials used for roofing of urban residential houses
R.C. slabs wood shingles G.I. sheets
178
pre-stressed concrete reinforced concrete
For very large roof spans (for auditoria, transport buildings, exhibition halls) of over 150 ft these structures are suggested economical solutions pre-stressed concrete reinforced concrete space frames, light steel skeleton structures
179
space frames, light steel skeleton structures
For very large roof spans (for auditoria, transport buildings, exhibition halls) of over 150 ft these structures are suggested economical solutions pre-stressed concrete reinforced concrete space frames, light steel skeleton structures
180
Rise is the vertical distance between the upper surface of two consecutive steps. The horizontal distance between the nosing of two consecutive steps is the “going” “string” “newel”
181
Rise is the vertical distance between the upper surface of two consecutive steps. The horizontal distance between the nosing of two consecutive steps is the “going” “string” “newel”
182
concrete hollow block walls ¼” double wall on 2” x 4” studs
Noise inside the building is o two kinds, namely, airborne noise and impact noise . Insulation must be provided against both of these by internal walls and floors. Examples of better sound insulation are concrete hollow block walls ¼” double wall on 2” x 4” studs asbestos board walls on wooden studs
183
¼” double wall on 2” x 4” studs
Noise inside the building is o two kinds, namely, airborne noise and impact noise . Insulation must be provided against both of these by internal walls and floors. Examples of better sound insulation are concrete hollow block walls ¼” double wall on 2” x 4” studs asbestos board walls on wooden studs
184
pitch or bituminous felt
When the soil beneath the building is not exceptionally well drained and it is necessary to exclude dampness, the best material to be used which is installed beneath the concrete slab is pitch or bituminous felt gravel coarse aluminum foil
185
pitch or bituminous felt
When the soil beneath the building is not exceptionally well drained and it is necessary to exclude dampness, the best material to be used which is installed beneath the concrete slab is pitch or bituminous felt gravel coarse aluminum foil
186
asbestos cement shingles
This material holds less moisture, is very light with less absorptive capacity and is very good in exterior sidings of residential houses in tropical regions asbestos cement shingles vinyl shingles wood shingles
187
asbestos cement shingles
This material holds less moisture, is very light with less absorptive capacity and is very good in exterior sidings of residential houses in tropical regions asbestos cement shingles vinyl shingles wood shingles
188
Standard size overlap for corrugated G.I. roofing is
189
Standard size overlap for corrugated G.I. roofing is
190
A continuous recess built into a wall to receive pipes, ducts, etc
A continuous recess built into a wall to receive pipes, ducts, etc. is called alcove ductwork chase
191
A continuous recess built into a wall to receive pipes, ducts, etc
A continuous recess built into a wall to receive pipes, ducts, etc. is called alcove ductwork chase
192
A twisting force is torsion shear moment
193
A twisting force is torsion shear moment
194
A barrier or diaphragm formed to prevent the movement of soil to stabilize foundation, etc. is
pile foundation sheet piling retaining wall
195
A barrier or diaphragm formed to prevent the movement of soil to stabilize foundation, etc. is
pile foundation sheet piling retaining wall
196
The term stone-cut refers to a
masonry finish adobe stone work wood siding
197
The term stone-cut refers to a
masonry finish adobe stone work wood siding
198
Wood with metal cladding is called
channel strip reinforced wood kalamein
199
Wood with metal cladding is called
channel strip reinforced wood kalamein
200
The Filipino term for floor joist is
suelo guililan soleras
201
The Filipino term for floor joist is
suelo guililan soleras
202
The Filipino term for bottom chord is
tirante tahilan madre
203
The Filipino term for bottom chord is
tirante tahilan madre
204
Standard concrete mix for beams, girders, slabs, stairs and columns is
“AA” “A” “B”
205
Standard concrete mix for beams, girders, slabs, stairs and columns is
“AA” “A” “B”
206
Chord splice connectors for trusses is
split-ring wood block fish plate
207
Chord splice connectors for trusses is
split-ring wood block fish plate
208
A vertical line check uses a
meter stick try square plumb bob
209
A vertical line check uses a
meter stick try square plumb bob
210
A specialized fastener used to pull on to hold mitered joints together is
vise wood screw clamp nail
211
A specialized fastener used to pull on to hold mitered joints together is
vise wood screw clamp nail
212
Most waterproofed type of mortar joints for wall is
raked struck weathered
213
Most waterproofed type of mortar joints for wall is
raked struck weathered
214
Rafters laid diagonally from corner of a plate or girts to the ridge
jack rafter valley plate hip rafter
215
Rafters laid diagonally from corner of a plate or girts to the ridge
jack rafter valley plate hip rafter
216
The horizontal boards nailed to corner post to assist in the accurate layout of foundation and excavation lines are called form boards box boards batter boards
217
The horizontal boards nailed to corner post to assist in the accurate layout of foundation and excavation lines are called form boards box boards batter boards
218
Columns in which a concrete core is reinforced with a steel or cast-iron core designed to support a part of load is lally composite cast-in-place
219
Columns in which a concrete core is reinforced with a steel or cast-iron core designed to support a part of load is lally composite cast-in-place
220
The Filipino term for ceiling joist is
kostilyahe tirante espejo
221
The Filipino term for ceiling joist is
kostilyahe tirante espejo
222
The Filipino term for concrete beam is
biga guilihan kilo
223
The Filipino term for concrete beam is
biga guilihan kilo
224
Instrument or tool capable of vertical and horizontal line check is called
plumb bob spirit level try square caliper
225
Instrument or tool capable of vertical and horizontal line check is called
plumb bob spirit level try square caliper
226
The vertical and horizontal surface is reinforced concrete where concreting was stopped and continued later is called expansion joint control joint cold joint construction joint
227
The vertical and horizontal surface is reinforced concrete where concreting was stopped and continued later is called expansion joint control joint cold joint construction joint
228
A twisting force is shear bending moment torsion
229
A twisting force is shear bending moment torsion
230
A continuous recess built into a wall to receive pipes, ducts, etc
A continuous recess built into a wall to receive pipes, ducts, etc. is called alcove chase ductworks pipeline
231
A continuous recess built into a wall to receive pipes, ducts, etc
A continuous recess built into a wall to receive pipes, ducts, etc. is called alcove chase ductworks pipeline
232
It is a special type of plate girder consisting of tees, angles and multiple web
box girder hybrid girder T-flange girder bridging
233
It is a special type of plate girder consisting of tees, angles and multiple web
box girder hybrid girder T-flange girder bridging
234
When the ratio of short span to the long span of a slab is less than 0
When the ratio of short span to the long span of a slab is less than 0.50, slab is a one-way slab slab on fill two-way slab cantilever slab
235
When the ratio of short span to the long span of a slab is less than 0
When the ratio of short span to the long span of a slab is less than 0.50, slab is a one-way slab slab on fill two-way slab cantilever slab
236
Longitudinal beams which rest on the top chord and preferably at the joints of the truss
purlins jack rafter rafters girders
237
Longitudinal beams which rest on the top chord and preferably at the joints of the truss
purlins jack rafter rafters girders
238
A three-dimensional structural system without bearing walls composed of interconnected laterally supported so as to function as a complete self-contained unit with or without the aids of horizontal diaphragms or floor-bracing system box system space frame freeform braced frame
239
A three-dimensional structural system without bearing walls composed of interconnected laterally supported so as to function as a complete self-contained unit with or without the aids of horizontal diaphragms or floor-bracing system box system space frame freeform braced frame
240
Concrete slab should have a minimum clearance of
20 mm 40 mm 15 mm 30 mm
241
Concrete slab should have a minimum clearance of
20 mm 40 mm 15 mm 30 mm
242
It is designed to resist lateral forces parallel to the plane of the wall
bearing wall curtain wall grade wall shear wall
243
It is designed to resist lateral forces parallel to the plane of the wall
bearing wall curtain wall grade wall shear wall
244
The section of which the moment changes from positive to negative is called
neutral axis inflection point section of zero shear maximum moment
245
The section of which the moment changes from positive to negative is called
neutral axis inflection point section of zero shear maximum moment
246
What is the appropriate painting material type for wood surfaces?
zinc chromate alkyd latex polyurethane
247
What is the appropriate painting material type for wood surfaces?
zinc chromate alkyd latex polyurethane
248
Commercially made corrugated G. I
Commercially made corrugated G.I. sheets, of gauge 26, having standard corrugation are coated both sides with aluminum coating laminations paints pure virgin spoiter
249
Commercially made corrugated G. I
Commercially made corrugated G.I. sheets, of gauge 26, having standard corrugation are coated both sides with aluminum coating laminations paints pure virgin spoiter
250
Wood flooring finishing material
7 & 6 wood planks V cut wood planks gypsum board ply board panel
251
Wood flooring finishing material
7 & 6 wood planks V cut wood planks gypsum board ply board panel
252
What hardware/material is needed to fasten an asphalt strip roof shingle on wooden sheets/planks?
CV nail staple wire tekscrew fin nail
253
What hardware/material is needed to fasten an asphalt strip roof shingle on wooden sheets/planks?
CV nail staple wire tekscrew fin nail
254
The time required for the removal of a form works of a concrete footing
24 hours 36 hours 48 hours 12 hours
255
The time required for the removal of a form works of a concrete footing
24 hours 36 hours 48 hours 12 hours
256
Identify which figure is a dado wood joint
257
Identify which figure is a dado wood joint
258
Identify which figure is flemish (double stretcher) brickwork
259
Identify which figure is flemish (double stretcher) brickwork
260
Wall partition wooden framing is called
joist jambs studs nailers
261
Wall partition wooden framing is called
joist jambs studs nailers
262
How many corrugation is required as the minimum side lap of an ordinary standard G.I. sheet roofing?
1 ½ 2 ½ 2 1
263
How many corrugation is required as the minimum side lap of an ordinary standard G.I. sheet roofing?
1 ½ 2 ½ 2 1
264
Identify which letter in the target is a valley jack rafter?
265
Identify which letter in the target is a valley jack rafter?
266
What is the appropriate paint material for G.I. sheet roofing?
alkyd type acrylic latex type lacquer type urethane
267
What is the appropriate paint material for G.I. sheet roofing?
alkyd type acrylic latex type lacquer type urethane
268
Identify which figure is a dado wood joint
269
Identify which figure is a dado wood joint
270
The paint finishing material of long-span pre-painted roofing sheet is
acrylic paint duco paint polyester paint automotive paint
271
The paint finishing material of long-span pre-painted roofing sheet is
acrylic paint duco paint polyester paint automotive paint
272
What hardware/material is needed to fasten corrugated asbestos cement roofing sheet on a steel purlin metal screw L hook bolt m bolt aluminum screw
273
What hardware/material is needed to fasten corrugated asbestos cement roofing sheet on a steel purlin metal screw L hook bolt m bolt aluminum screw
274
A common paint film defect where progressive powdering from the surface inward occurs. It is called
blistering peeling chalking alligatoring
275
A common paint film defect where progressive powdering from the surface inward occurs. It is called
blistering peeling chalking alligatoring
276
Identify which figure is a blind and sub-mortise and tenon joint
277
Identify which figure is a blind and sub-mortise and tenon joint
278
A joint where two successive placement of concrete meet is called
truss joint contraction joint construction joint expansion joint
279
A joint where two successive placement of concrete meet is called
truss joint contraction joint construction joint expansion joint
280
A wall which supports vertical loads in addition to its weight without the benefit of a complete vertical load carrying space frame is called retaining wall curtain wall shearing wall bearing wall
281
A wall which supports vertical loads in addition to its weight without the benefit of a complete vertical load carrying space frame is called retaining wall curtain wall shearing wall bearing wall
282
A type of concrete floor which has no beam is called
flat slab 2-way slab one way slab ribbed floor
283
A type of concrete floor which has no beam is called
flat slab 2-way slab one way slab ribbed floor
284
A one-way concrete slab are used when
the slab is being supported by two parallel beams the slab has no cantilevered portion the concrete slab is reinforced on the near bottom side the concrete slab is sloping to all side
285
A one-way concrete slab are used when
the slab is being supported by two parallel beams the slab has no cantilevered portion the concrete slab is reinforced on the near bottom side the concrete slab is sloping to all side
286
a tool for checking height elevation
Level tool is a tool used for guiding and testing the work to a vertical and horizontal position a tool for checking height elevation tool used to check the water level the tool designated the different ranking of tool usage
287
a tool for checking height elevation
Level tool is a tool used for guiding and testing the work to a vertical and horizontal position a tool for checking height elevation tool used to check the water level the tool designated the different ranking of tool usage
288
tool for testing and for framing work
Steel square is a a small try square tool for testing and for framing work a steel square for use of signage tool of the steel man
289
tool for testing and for framing work
Steel square is a a small try square tool for testing and for framing work a steel square for use of signage tool of the steel man
290
The vertical surface on face of a stair step is called
stair clip stair head nosing riser
291
The vertical surface on face of a stair step is called
stair clip stair head nosing riser
292
Tin shear is a painter tool masonry tool tinsmithry tool electrical tool
293
Tin shear is a painter tool masonry tool tinsmithry tool electrical tool
294
Auger bit is part of fastener tool guiding testing tool bearing tool rough facing tool
295
Auger bit is part of fastener tool guiding testing tool bearing tool rough facing tool
296
The complete records of test conduction (slump, compression test, etc
The complete records of test conduction (slump, compression test, etc.) shall be preserved and made available for inspection during the progress of construction and after completion of the projects for a period of not less than 5 years 3 years 4 years 2 years
297
The complete records of test conduction (slump, compression test, etc
The complete records of test conduction (slump, compression test, etc.) shall be preserved and made available for inspection during the progress of construction and after completion of the projects for a period of not less than 5 years 3 years 4 years 2 years
298
Wood board should have a thickness specification of
not less than 2” thick x 5” and up wide not less than 1” thick x 4” and up wide not less than 2” thick x 4” and up wide not less than 3” thick x 7” and up wide
299
Wood board should have a thickness specification of
not less than 2” thick x 5” and up wide not less than 1” thick x 4” and up wide not less than 2” thick x 4” and up wide not less than 3” thick x 7” and up wide
300
Wood plank is a piece of lumber that is
2” to 5” thick 6” to 8” thick 5” to 7” thick 8” up thick
301
Wood plank is a piece of lumber that is
2” to 5” thick 6” to 8” thick 5” to 7” thick 8” up thick
302
The distance from the first to the last riser of a stair flight is called
spandrel pitch run rise
303
The distance from the first to the last riser of a stair flight is called
spandrel pitch run rise
304
A high-speed rotary shaping hand power tool used to make smooth cutting and curving on solid wood is called surface planner dado place portable hand router lathe machine
305
A high-speed rotary shaping hand power tool used to make smooth cutting and curving on solid wood is called surface planner dado place portable hand router lathe machine
306
The major horizontal supporting member of the floor system is called
rafter girder purlin girt
307
The major horizontal supporting member of the floor system is called
rafter girder purlin girt
308
Wood defects are heart shake, cup shake, star shake and
knots discoloration deterioration rotten
309
Wood defects are heart shake, cup shake, star shake and
knots discoloration deterioration rotten
310
Dressed lumber is referred to
covered with plastic for shipment lumber of exact measurement smoothed or planed lumber lumber used for fine carpentry works
311
Dressed lumber is referred to
covered with plastic for shipment lumber of exact measurement smoothed or planed lumber lumber used for fine carpentry works
312
The other kind of handsaw other than rip-cut saw is
diagonal cut saw cross-cut circular saw coping saw
313
The other kind of handsaw other than rip-cut saw is
diagonal cut saw cross-cut circular saw coping saw
314
Walls that support weight from above as well as their own dead weight
load bearing walls curtain walls shoring walls none of the above
315
Walls that support weight from above as well as their own dead weight
load bearing walls curtain walls shoring walls none of the above
316
It refers to the occupancy load which either partially or fully in place or may not be present at all is called live load dead load concentrated load distributed load
317
It refers to the occupancy load which either partially or fully in place or may not be present at all is called live load dead load concentrated load distributed load
318
The distance between inflection point in the column when it breaks is called
development length cross sectional area effective length equivalent distance
319
The distance between inflection point in the column when it breaks is called
development length cross sectional area effective length equivalent distance
320
The amount of space measured in cubic units
none of these perimeter volume area
321
The amount of space measured in cubic units
none of these perimeter volume area
322
An expansion joints adjacent parts of a structure to permit expected movements between them is called contraction joint truss joint construction joint conduction joint
323
An expansion joints adjacent parts of a structure to permit expected movements between them is called contraction joint truss joint construction joint conduction joint
324
To find the volume of water in a cylindrical tank, multiply the area of its base by its
diameter radius height none of these
325
To find the volume of water in a cylindrical tank, multiply the area of its base by its
diameter radius height none of these
326
The most important component to determine the strength of a concrete mix is
cement sand gravel lime
327
The most important component to determine the strength of a concrete mix is
cement sand gravel lime
328
A beam that projects beyond one or both its support is called
overhanging beam continuous beam intermediate beam cantilever beam
329
A beam that projects beyond one or both its support is called
overhanging beam continuous beam intermediate beam cantilever beam
330
Jack rafter is used for hip roof support long span beam cantilevered truss none of these
331
Jack rafter is used for hip roof support long span beam cantilevered truss none of these
332
The total of all the tread widths in a stair is called
total riser total run winder none of these
333
The total of all the tread widths in a stair is called
total riser total run winder none of these
334
The face or front elevation of a building
facade front view face plate frontal approach
335
The face or front elevation of a building
facade front view face plate frontal approach
336
A pit in a basement floor made to collect water into which a pump is placed to pump the liquid to the sewer pipe sump drain hole slump none of these
337
A pit in a basement floor made to collect water into which a pump is placed to pump the liquid to the sewer pipe sump drain hole slump none of these
338
Prefabrication refers to
design of a factory pre-construction of components as a part of a whole a system of material audit preliminary building procedure
339
Prefabrication refers to
design of a factory pre-construction of components as a part of a whole a system of material audit preliminary building procedure
340
An opening in the roof for admitting light is called
natural lighting ocules lighting none of these skylight
341
An opening in the roof for admitting light is called
natural lighting ocules lighting none of these skylight
342
Wood coming out from trees with needle leaves, rather than broad leaves are called
ironwood mahogany softwood hardwood
343
Wood coming out from trees with needle leaves, rather than broad leaves are called
ironwood mahogany softwood hardwood
344
A kind of brick used for high temperature
fly-ash brick thermal brick firebrick cinder block
345
A kind of brick used for high temperature
fly-ash brick thermal brick firebrick cinder block
346
The building frame construction system that uses one piece structural stud from the foundation to the roof balloon framing lath framing wall framing upright framing
347
The building frame construction system that uses one piece structural stud from the foundation to the roof balloon framing lath framing wall framing upright framing
348
A nailer strip incorporated in rough concrete wall to be plastered to act as guide and support for finish trim around openings and near the base of the wall none of these plaster ground gravel stop trimming guard
349
A nailer strip incorporated in rough concrete wall to be plastered to act as guide and support for finish trim around openings and near the base of the wall none of these plaster ground gravel stop trimming guard
350
The distance between two structural supports
overall distance bay span none of these
351
The distance between two structural supports
overall distance bay span none of these
352
The scientific name for wood is
CITEM XYLEM APTG TANG
353
The scientific name for wood is
CITEM XYLEM APTG TANG
354
In designing a stair, to find the height of the riser, divide the height of the stair by the number of newel post risers balustrade balusters
355
In designing a stair, to find the height of the riser, divide the height of the stair by the number of newel post risers balustrade balusters
356
A kind of roof that has four sloping sides
gable roof mansard roof hip roof lean to
357
A kind of roof that has four sloping sides
gable roof mansard roof hip roof lean to
358
Stone placed on a slope to prevent erosion
rip-rap embankment flag stone border stone
359
Stone placed on a slope to prevent erosion
rip-rap embankment flag stone border stone
360
A tough used for carrying off water
gutter none of these moat valley duet
361
A tough used for carrying off water
gutter none of these moat valley duet
362
The process of removing concrete forms from the cured concrete
stripping clearing none of these deforming works
363
The process of removing concrete forms from the cured concrete
stripping clearing none of these deforming works
364
A structural member spanning from truss-to-truss or supporting rafters
floor joist purlin girts girder
365
A structural member spanning from truss-to-truss or supporting rafters
floor joist purlin girts girder
366
A threaded steel bent inserted of masonry construction for securing wood or metal plates to concrete construction anchor bolt U-bolt gusset plate strut
367
A threaded steel bent inserted of masonry construction for securing wood or metal plates to concrete construction anchor bolt U-bolt gusset plate strut
368
A horizontal piece of wood, stone, steel or concrete across the top of door or window opening to bear the weight of the walls above the opening none of these lintel transome beam transverse rafter
369
A horizontal piece of wood, stone, steel or concrete across the top of door or window opening to bear the weight of the walls above the opening none of these lintel transome beam transverse rafter
370
The placing of glass in windows or doors
none of these glazing puttying glassing
371
The placing of glass in windows or doors
none of these glazing puttying glassing
372
A rejected building material because of its below standard grade is called
out-limber run-of-the mill cult none of these
373
A rejected building material because of its below standard grade is called
out-limber run-of-the mill cult none of these
374
Another word for handmill on a stair construction
balustrade banister hand guard stringer
375
Another word for handmill on a stair construction
balustrade banister hand guard stringer
376
A joint produced by lapping two pieces of materials
sandwiched joint butt joint dado joint lap joint
377
A joint produced by lapping two pieces of materials
sandwiched joint butt joint dado joint lap joint
378
creasate treated lumber talanized lumber
Green lumber is wolmanized lumber creasate treated lumber talanized lumber lumber that still contains moisture or sap
379
lumber that still contains moisture or sap
Green lumber is wolmanized lumber creasate treated lumber talanized lumber lumber that still contains moisture or sap
380
The internal angle formed by the two roof slopes of a roof is called
canal gutter valley ridge cap
381
The internal angle formed by the two roof slopes of a roof is called
canal gutter valley ridge cap
382
A vertical board attached on the ends of the rafters
A vertical board attached on the ends of the rafters. It is a part of the cornice facia decorative board face over construction board
383
A vertical board attached on the ends of the rafters
A vertical board attached on the ends of the rafters. It is a part of the cornice fascia decorative board face over construction board
384
A large heavy nail is referred to as
spike anchorage hardware none of these dowel rod
385
A large heavy nail is referred to as
spike anchorage hardware none of these dowel rod
386
In designing a stair, to find the number of riser divide the height of the stair by the height of each newel post risers balusters nosing
387
In designing a stair, to find the number of riser divide the height of the stair by the height of each newel post risers balusters nosing
388
Underwater watertight chamber to allow construction work to be done
bent chamber submersible air chamber caisson none of these
389
Underwater watertight chamber to allow construction work to be done
bent chamber submersible air chamber caisson none of these
390
Stakes and batter board in a construction layouting procedure refers to
building components where permanent horizontal and vertical measurement are indicated initial formworks done in construction vertical and horizontal wood sticks and lumber used to determine the elevation and ditances of the reference points of the proposed building a cliché for layouting work
391
Stakes and batter board in a construction layouting procedure refers to
building components where permanent horizontal and vertical measurement are indicated initial formworks done in construction vertical and horizontal wood sticks and lumber used to determine the elevation and ditances of the reference points of the proposed building a cliché for layouting work
392
Lumber specification S4S means
smooth for surfacing jobs square on four sides first class lumber smooth on four sides
393
Lumber specification S4S means
smooth for surfacing jobs square on four sides first class lumber smooth on four sides
394
The term used to indicate top and lower principal member of a roof or bridge truss
rafter chord beam tie
395
The term used to indicate top and lower principal member of a roof or bridge truss
rafter chord beam tie
396
Strips of hardwood, usually 2x2” laid over a concrete slab floor
sleepers leveling blocks wood anchor blocks wood saddle
397
Strips of hardwood, usually 2x2” laid over a concrete slab floor
sleepers leveling blocks wood anchor blocks wood saddle
398
Miter square is a guiding and testing tool that has a permanent blade set at
30 45 20 60
399
Miter square is a guiding and testing tool that has a permanent blade set at
30 45 20 60
400
A wall that holds back on earth embankment
shoring wall retaining wall buttress wall foundation wall
401
A wall that holds back on earth embankment
shoring wall retaining wall buttress wall foundation wall
402
In structural steel section joints, it is recommended NOT to use
rivets nuts and bolts oxy/acetyline welding electric arch welding
403
In structural steel section joints, it is recommended NOT to use
rivets nuts and bolts oxy/acetyline welding electric arch welding
404
A wall that serves two (2) dwelling units, known also as party wall
common wall property wall exterior wall perimeter wall
405
A wall that serves two (2) dwelling units, known also as party wall
common wall property wall exterior wall perimeter wall
406
Pertaining to a material description that resembles glass
alabaster vitreous fiberglass cellulose
407
Pertaining to a material description that resembles glass
alabaster vitreous fiberglass cellulose
408
To allow concrete to dry by keeping it moist to attain maximum strength
permentate stabilize tempering cure
409
To allow concrete to dry by keeping it moist to attain maximum strength
permentate stabilize tempering cure
410
The hardware on a door to accommodate the knob and lockset keyhole
escutcheon embellisher door lock cup push plate
411
The hardware on a door to accommodate the knob and lockset keyhole
escutcheon embellisher door lock cup push plate
412
The material used for the process of making watertight the roof intersection and other exposed areas on the exterior of a building caping flashing fascia gutter
413
The material used for the process of making watertight the roof intersection and other exposed areas on the exterior of a building caping flashing fascia gutter
414
A vertical space in a building intended for ducts, pipes, wire and cables
niche crevice chase trench
415
A vertical space in a building intended for ducts, pipes, wire and cables
niche crevice chase trench
416
The term to describe the putting up of the skeleton of the building
roughing-in stakes and butterboards shell work formworks
417
The term to describe the putting up of the skeleton of the building
roughing-in stakes and butterboards shell work formworks
418
a road builder tool for measuring zig-zag
The zig-zag rule is a a road builder tool for measuring zig-zag the law governing intricate road network an all-metal tape measuring tool carpenter measuring tool
419
carpenter measuring tool
The zig-zag rule is a a road builder tool for measuring zig-zag the law governing intricate road network an all-metal tape measuring tool carpenter measuring tool
420
a wedge-shaped stone of an arch a kind of grinding every stone
Keystone is a wedge-shaped stone of an arch a kind of grinding every stone a stone shaped like a key a brand of vehicular tire
421
a wedge-shaped stone of an arch
Keystone is a wedge-shaped stone of an arch a kind of grinding every stone a stone shaped like a key a brand of vehicular tire
422
a fireproof door with metal covering an indoor decorative door
Kalomein door is a fireproof door with metal covering an indoor decorative door a door product of Kuala Lumpur none of these
423
a fireproof door with metal covering
Kalomein door is a fireproof door with metal covering an indoor decorative door a door product of Kuala Lumpur none of these
424
Lumber that is notsquared or finished
green lumber milled lumber undressed lumber scaled lumber
425
Lumber that is notsquared or finished
green lumber milled lumber undressed lumber scaled lumber
426
90 degree bend plus 10 db extension, at free end of bar
How is a 90 degree bend standard hook for concrete reinforcement constructed 90 degree bend plus 10 db extension, at free end of bar 90 degree bend plus 12 db extension, at free end of bar 90 degree bend plus 6 db extension, at free end of bar 90 degree bend plus 4 db extension, at free end of bar
427
90 degree bend plus 12 db extension, at free end of bar
How is a 90 degree bend standard hook for concrete reinforcement constructed 90 degree bend plus 10 db extension, at free end of bar 90 degree bend plus 12 db extension, at free end of bar 90 degree bend plus 6 db extension, at free end of bar 90 degree bend plus 4 db extension, at free end of bar
428
Good high-strength-bolted connection for steel should have the following physical characteristic for good workmanship. Which of the following listed is NOT ideal? High-strength-bolted parts shall fit solidly together when assembled and shall not be separated by gaskets or any other interposed compressive material Bolts tightened by means of a calibrated wrench shall be installed with a hardened washed under the nut or bolt head, whichever is the element turned in tightening When assembled, all joint surfaces, including those adjacent to the washer, shall be free of scale, except tight mill scale, dirt and burns Surface in contact with the bolt head and nut shall have a slope of not more than 1:10 with respect to a plane normal to the bolt axis
429
Good high-strength-bolted connection for steel should have the following physical characteristic for good workmanship. Which of the following listed is NOT ideal? High-strength-bolted parts shall fit solidly together when assembled and shall not be separated by gaskets or any other interposed compressive material Bolts tightened by means of a calibrated wrench shall be installed with a hardened washed under the nut or bolt head, whichever is the element turned in tightening When assembled, all joint surfaces, including those adjacent to the washer, shall be free of scale, except tight mill scale, dirt and burns Surface in contact with the bolt head and nut shall have a slope of not more than 1:10 with respect to a plane normal to the bolt axis
430
What are piles at an inclination to resist forces that are not critical?
guide piles batter piles slope piles fender piles
431
What are piles at an inclination to resist forces that are not critical?
guide piles batter piles slope piles fender piles
432
Which of the following criteria for bundle bars, do NOT apply?
bars larger than 32 mm shall not be bundled in beams bundle bars shall not be enclosed within stirrups or ties group of parallel reinforcing bars bundled in contact to act as a unit shall be limited to three in any one bundle individual bars within a bundle terminated within the span of flexural members shall terminate at different points with at least 40 db staggered
433
Which of the following criteria for bundle bars, do NOT apply?
bars larger than 32 mm shall not be bundled in beams bundle bars shall not be enclosed within stirrups or ties group of parallel reinforcing bars bundled in contact to act as a unit shall be limited to three in any one bundle individual bars within a bundle terminated within the span of flexural members shall terminate at different points with at least 40 db staggered
434
What is a concrete beam placed directly on the ground to provide foundation for the superstructure?
strap beam gerber beam grade beam tie beam
435
What is a concrete beam placed directly on the ground to provide foundation for the superstructure?
strap beam gerber beam grade beam tie beam
436
What is a round steel bolt embedded in concrete or masonry use to hold down machinery, steel columns or beams, casting, shoes, beams plates and engine heads? retaining bolts foundation bolts anchor bolts friction bolts
437
What is a round steel bolt embedded in concrete or masonry use to hold down machinery, steel columns or beams, casting, shoes, beams plates and engine heads? retaining bolts foundation bolts anchor bolts friction bolts
438
concrete block cushion
A concrete flooring and finish which transforms ordinary plain concrete into an elegant and decorative textured surface. This is done by adding dust-on-color pigments to the concrete to give a fast color and imprinted with a patented pattern and texture while the concrete is still plastic to create the look and finish of stone, slate or brick impressio-crete textfloor-crete stucco floor finish concrete block cushion
439
concrete block cushion
A concrete flooring and finish which transforms ordinary plain concrete into an elegant and decorative textured surface. This is done by adding dust-on-color pigments to the concrete to give a fast color and imprinted with a patented pattern and texture while the concrete is still plastic to create the look and finish of stone, slate or brick impressio-crete textfloor-crete stucco floor finish concrete block cushion
440
Vernacular term for Concrete Hollow Block (CHB) laying
palitada mitsa rebokada asintada
441
Vernacular term for Concrete Hollow Block (CHB) laying
palitada mitsa rebokada asintada
442
An installation method where the cabinet covers is recessed and flushed with the cabinet sidings
inset or interior concealed party wall or half lap full lap or over lap
443
An installation method where the cabinet covers is recessed and flushed with the cabinet sidings
inset or interior concealed party wall or half lap full lap or over lap
444
Type of carpet weave important for an architect/designer to know to guide him as to what type of construction and specification should he recommend. What simplest type of fiber carpet weaving where pile forms as the wrap yarns loop over removable “wires” inserted consecutively across the loom? axminster wilton velvet knitted
445
Type of carpet weave important for an architect/designer to know to guide him as to what type of construction and specification should he recommend. What simplest type of fiber carpet weaving where pile forms as the wrap yarns loop over removable “wires” inserted consecutively across the loom? axminster wilton velvet knitted
446
concrete roughing by chiseling
A pretreatment of poured concrete such as walls beams and columns where a thin layer of lean cement grout mixed with flexible base additives is splattered by tampico brush or masonry spoon to the surface to give a “tooth” for excellent plaster adhesion scratch coat splash coat cement roughing concrete roughing by chiseling
447
concrete roughing by chiseling
A pretreatment of poured concrete such as walls beams and columns where a thin layer of lean cement grout mixed with flexible base additives is splattered by tampico brush or masonry spoon to the surface to give a “tooth” for excellent plaster adhesion scratch coat splash coat cement roughing concrete roughing by chiseling
448
Local species of wood commonly used for wall studding, cabinet framing, and flush door framing, though scarcely available in the market now due to forestry ban. This type of species is due to cheaper cost than the other listed below narra molave mahogany tanguile
449
Local species of wood commonly used for wall studding, cabinet framing, and flush door framing, though scarcely available in the market now due to forestry ban. This type of species is due to cheaper cost than the other listed below narra molave mahogany tanguile
450
polyethylene floor coating tile floor coating epoxy floor coating
A special coating system with a high gloss shine while maintaining the natural wood qualities, maintenance free, used to finish and topcoat wood flooring polyethylene floor coating tile floor coating epoxy floor coating polyurethane floor coating
451
polyurethane floor coating
A special coating system with a high gloss shine while maintaining the natural wood qualities, maintenance free, used to finish and topcoat wood flooring polyethylene floor coating tile floor coating epoxy floor coating polyurethane floor coating
452
A common and cheap masonry finish wherein dry consistency mortar mix is sprayed by mechanical or pneumatic means. The sprayed cement is left to dry and give a rustic finish. Optional paint coat maybe required spraytex anay finish stucco finish sandblast
453
A common and cheap masonry finish wherein dry consistency mortar mix is sprayed by mechanical or pneumatic means. The sprayed cement is left to dry and give a rustic finish. Optional paint coat maybe required spraytex anay finish stucco finish sandblast
454
What criterion conforms to good construction practice for the earliest time to remove scaffolding for concrete flooring other than early-strength concrete if no anticipated load is expected over poured floor? 25% of scaffoldings can be removed at slab area after 21 days of pouring and 100% of scaffolds after 28 days 50% of scaffolding can be removed after 14 days and 100% of scaffolds after 2 days 50% of scaffoldings can be removed over slab area after 28 days of pouring and 100% of scaffolding after 36 days 25% of scaffoldings can be removed at slab area after 14 days and 100% of scaffolds after 21 days after pouring
455
What criterion conforms to good construction practice for the earliest time to remove scaffolding for concrete flooring other than early-strength concrete if no anticipated load is expected over poured floor? 25% of scaffoldings can be removed at slab area after 21 days of pouring and 100% of scaffolds after 28 days 50% of scaffolding can be removed after 14 days and 100% of scaffolds after 2 days 50% of scaffoldings can be removed over slab area after 28 days of pouring and 100% of scaffolding after 36 days 25% of scaffoldings can be removed at slab area after 14 days and 100% of scaffolds after 21 days after pouring
456
A type of wood end joint where both wood are cut at equal angles diagonally
finger lap splice scarf
457
A type of wood end joint where both wood are cut at equal angles diagonally
finger lap splice scarf
458
standard sizes, shapes and forms needs additional finishing
When utilizing “knock-down” modular system of cabinets and furniture, an end user is constrain of using: longer assembly time standard sizes, shapes and forms needs additional finishing labor intensive during production and assembly
459
standard sizes, shapes and forms
When utilizing “knock-down” modular system of cabinets and furniture, an end user is constrain of using: longer assembly time standard sizes, shapes and forms needs additional finishing labor intensive during production and assembly
460
A type of terazzo floor described by its physical appearance whereby the stone or pebble is intentionally exposed while the cement matrix is depressed palladiana terazzo rustic terazzo venetian terazzo standard terazzo
461
A type of terazzo floor described by its physical appearance whereby the stone or pebble is intentionally exposed while the cement matrix is depressed palladiana terazzo rustic terazzo venetian terazzo standard terazzo
462
Which of the following concrete handling criterion impairs the quality of concrete?
re-tempting concrete shall not be used and discard by approved means concrete shall be carried on at such a rate that concrete is at all times plastic and flows readily into space between reinforcement concrete that has initially set, shall be mixed with new concrete and shall be deposited in the structure with approved means top surfaces or vertically formed lifts shall be generally level
463
Which of the following concrete handling criterion impairs the quality of concrete?
re-tempting concrete shall not be used and discard by approved means concrete shall be carried on at such a rate that concrete is at all times plastic and flows readily into space between reinforcement concrete that has initially set, shall be mixed with new concrete and shall be deposited in the structure with approved means top surfaces or vertically formed lifts shall be generally level
464
A type of window where the ventilating sash rotates 90 degrees to 180 degrees about the header and sill or about the side jamb combination pivoted awning jalousie
465
A type of window where the ventilating sash rotates 90 degrees to 180 degrees about the header and sill or about the side jamb combination pivoted awning jalousie
466
cure the cement plaster slowly cure the cement plaster rapidly
To prevent cement plaster from improper adhesion, the substrate must be roughened while observing the following: cure the cement plaster slowly cure the cement plaster rapidly add more cement to the cement plaster keep the cement plaster as thin as possible
467
keep the cement plaster as thin as possible
To prevent cement plaster from improper adhesion, the substrate must be roughened while observing the following: cure the cement plaster slowly cure the cement plaster rapidly add more cement to the cement plaster keep the cement plaster as thin as possible
468
A type of “hands of door” where the hinge is at the left and the door leaf swings inside the room to the left right hand reverse right hand left hand reverse left hand
469
A type of “hands of door” where the hinge is at the left and the door leaf swings inside the room to the left right hand reverse right hand left hand reverse left hand
470
What type of joint is used to install a glass into a lite of a French window?
dado rabbet tenon mortise
471
What type of joint is used to install a glass into a lite of a French window?
dado rabbet tenon mortise
472
An equipment to uniformly distribute tile adhesive at the underside of a ________ tile during installation masonry wall notch trowel edge strip trowel flat steel trowel
473
An equipment to uniformly distribute tile adhesive at the underside of a ________ tile during installation masonry wall notch trowel edge strip trowel flat steel trowel
474
A water-mixed product mixed to a ratio of 1:20 to stabilize lime activity in new masonry surface. Without preparing the surface with this mixture will cause the subsequent painting to be defective acrylic emulsion masonry neutralizer etching solution aquaseal
475
A water-mixed product mixed to a ratio of 1:20 to stabilize lime activity in new masonry surface. Without preparing the surface with this mixture will cause the subsequent painting to be defective acrylic emulsion masonry neutralizer etching solution aquaseal
476
A paint defect which indicates imperfect adhesion of paint to the surface, with the film getting stripped off in a relatively large pieces due to application on damp or greasy surface peeling bleeding alligatoring cracking
477
A paint defect which indicates imperfect adhesion of paint to the surface, with the film getting stripped off in a relatively large pieces due to application on damp or greasy surface peeling bleeding alligatoring cracking
478
A type of shutter proof opaque glass used to construct a door with glass to allow natural light only
figured wired glass smoked glass etched glass bevel glass
479
A type of shutter proof opaque glass used to construct a door with glass to allow natural light only
figured wired glass smoked glass etched glass bevel glass
480
Vernacular term for rough plastering
baldosa asintada rebokada kostura
481
Vernacular term for rough plastering
baldosa asintada rebokada kostura
482
Aggregates should conform to PNS or ASTM standards and must be well graded, easy workability and method of consolidated are such that the concrete can be poured without honeycomb or voids. What is the nominal maximum size of a course aggregate when working spaces between reinforcements for proper bonding> Course aggregates shall be no larger than ½ the minimum clear spacing between individual reinforcing bars or wires, bundles of bars, or prestressing tendons or ducts Course aggregates shall be no larger than 5/8 the minimum clear spacing between individual reinforcing bars or wires, bundles of bars, or prestressing tendons or ducts Course aggregates shall be no larger than 7/8 the minimum clear spacing between individual reinforcing bars or wires, bundles of bars, or prestressing tendons or ducts Course aggregates shall be no larger than ¾ the minimum clear spacing between individual reinforcing bars or wires, bundles of bars, or prestressing tendons or ducts
483
Aggregates should conform to PNS or ASTM standards and must be well graded, easy workability and method of consolidated are such that the concrete can be poured without honeycomb or voids. What is the nominal maximum size of a course aggregate when working spaces between reinforcements for proper bonding> Course aggregates shall be no larger than ½ the minimum clear spacing between individual reinforcing bars or wires, bundles of bars, or prestressing tendons or ducts Course aggregates shall be no larger than 5/8 the minimum clear spacing between individual reinforcing bars or wires, bundles of bars, or prestressing tendons or ducts Course aggregates shall be no larger than 7/8 the minimum clear spacing between individual reinforcing bars or wires, bundles of bars, or prestressing tendons or ducts Course aggregates shall be no larger than ¾ the minimum clear spacing between individual reinforcing bars or wires, bundles of bars, or prestressing tendons or ducts
484
db but not less than 15 mm and need not exceed 40 mm
What is the minimum concrete cover for primary reinforcement of beams and columns not exposed to earth or weather for precast manufactured under plant control conditions? db but not less than 25 mm db but not less than 15 mm and need not exceed 40 mm db but not less than 20 mm and not to exceed 50 mm db but not less than 30 mm
485
db but not less than 15 mm and need not exceed 40 mm
What is the minimum concrete cover for primary reinforcement of beams and columns not exposed to earth or weather for precast manufactured under plant control conditions? db but not less than 25 mm db but not less than 15 mm and need not exceed 40 mm db but not less than 20 mm and not to exceed 50 mm db but not less than 30 mm
486
What is the act of excavating or filling of earth or any sound material or combination thereof, in preparation for a finishing surface such as paving? cut and fill grading benching site preparation
487
What is the act of excavating or filling of earth or any sound material or combination thereof, in preparation for a finishing surface such as paving? cut and fill grading benching site preparation
488
A floor finish commercially size 1” x 12” x 12” utilizing clay and fired in traditional manner making interesting and attractive rustic clay shade patterns. Because of the rustic effect the floor is finished rough and simply adhere by cement with some irregularities cement non skid blocks vigan tiles adobe cobbled stones mosaic tiles
489
A floor finish commercially size 1” x 12” x 12” utilizing clay and fired in traditional manner making interesting and attractive rustic clay shade patterns. Because of the rustic effect the floor is finished rough and simply adhere by cement with some irregularities cement non skid blocks vigan tiles adobe cobbled stones mosaic tiles
490
What is a steel element such as wire, cable, bar, rod or strand, or a bundle of such elements, used to impart prestress to concrete? prestress cables reinforcement tenon cables tendon
491
What is a steel element such as wire, cable, bar, rod or strand, or a bundle of such elements, used to impart prestress to concrete? prestress cables reinforcement tenon cables tendon