Presentation is loading. Please wait.

Presentation is loading. Please wait.

RCLayout User note January 2013. Do product layout.

Similar presentations


Presentation on theme: "RCLayout User note January 2013. Do product layout."— Presentation transcript:

1 RCLayout User note January 2013

2 Do product layout

3 Useful information

4 Access > http://rclayout.extranet.royalcanin.org > RConnect (new RC Intranet) > Sales Support Portal

5 > Windows ID user & Windows password = RCAD access Access

6 > You don’t have to wait! > Your account is automatically created as soon as you go onto http://rclayout.web.rcad.net/

7 Advise > Have a mouse when using the website!

8 Let’s go!

9 > Click on OPEN > My layouts management

10 > F11 button to be in full screen (useful when small screen laptop) > F11 button to desactivate full screen mode

11 To start from an existing project

12 > Search for an existing project > Select it in the list > Double-click or click on OPEN

13 To start a project from zero

14 > Start a new project from zero

15 > Name your project > Start from zero (=Blank) > Or start from a model

16 > Name the first stand of your project > Fill in the width in cm > Choose the range

17 > Fill in the height & the depth for the first level

18 To add a new level

19 > Click on the right button of your mouse > Click on Add level

20 To add a stand

21 > Use the tabs to navigate

22 > Click on Stand > Click on Add a stand

23 To put products on a level

24 > Select your range

25 > Select your format, hold the click & drag it onto the level

26 Label associated to the level

27 > The label gathers the main information of the level

28 > Remain = Space available on the level in cm > -3cm is the maximum

29 Colour code when dragging the bags

30 > VERT = enough space to put the bag!

31 > ORANGE = still fine but close to the limit

32 > RED = not enough space

33 > 3 possible reasons: - The bag goes too much onto another bag -Not enough space remaining on the level (Remain < -3cm ) -The height is too short

34 To manage the level functionalities

35 > Click right on the level to access the functionalities

36 Add a new level Put the bags to the right Put the bags to the left Justify Change the width of the level and stand Change the height & depth of the level Move the level up Move the level down Empty the level Delete the level

37 To duplicate a product

38 > Click on Ctrl & hold the click > Select the product with the left button of the mouse & hold the click to move the product

39 To select several products

40 > Draw a zone (here in blue). To do it, click on a point & hold the click to enlarge the zone. > You can move it or duplicate it (as for a product).

41 The storage area

42 > Storage area

43 Functionalities to manage a stand

44 > Click on Stand

45 > Functionalities linked to the management of a stand

46 Add a new stand in the project Empty the current stand Delete the stand Change stand width Change the name of the stand Print stand 2D view Print stand product list > Functionalities linked to the management of a stand

47 Functionalities to manage a project

48 > Click on Project

49 > Functionalities linked to the management of the project

50 Save Empty the whole project Close the project Print in 2D Product list in pdf Product list in Excel file Save as > Functionalities linked to the management of the project

51 3D view

52 > Click on 3D view

53 > View by default: ¾ view from the left

54 > Click anywhere on the 3D view, hold the click & then move your mouse to change the angle view

55 > Zoom or dezoom with the mouse scroll

56 > Print your 3D view

57 > Direct print > Save the view as pdf > Save the view as jpg > Change the printing format

58 Workshop 1

59 Build this stand 1m33: 5 level: H:25cm D:70cm 4 level: H:25cm D:70cm 3 rd level: H:36cm D:70cm 2 nd level: H:36cm D:70cm 1 st level: H:42cm D:70cm

60 Add a stand. 66cm wide. 6 ème niveau: H:25cm P:70cm 5 ème niveau: H:25cm P:70cm 4 ème niveau: H:33cm P:70cm 3 ème niveau: H:33cm P:70cm 2 ème niveau: H:36cm P:70cm 1 er niveau: H:36cm P:70cm

61 > Export the product list of the whole project in pdf > Export the product list of the 1st stand in Excel

62 > Print this view


Download ppt "RCLayout User note January 2013. Do product layout."

Similar presentations


Ads by Google