Download presentation
1
Composite Construction
Detail of shear connectors
2
Composite Construction
PNA in steel PNA in concrete b b Ycon Ycon a C = Ccon+Cst Tst C=T Mn = Cy = Ty b b a C con Ycon y Tst
3
Composite Construction
Ccon = 0.85f’cba T = FyAs Ccon and T can not exceed force carried by studs, ∑Qn ∑Qn =0.85 f’cba Depth of compression block
4
Composite Members Specification p. 16.1-40
I3 Flexural Members Effective Width, b, sum of effective widths for each side of beam center-line, each of which shall not exceed: 1) 1/8 of beam span 2) ½ distance to center-line of adjacent beam 3) distance to edge of slab b b b
5
Composite Members Specification p. 16.1-40
I3 Flexural Members (cont.) Design Strength of Beams with Shear Connectors - Strength During Construction Formed Steel Deck 5a. General hr ≤ 3” wr ≥ 2” shear stud diameter ≤ ¾” shear studs must extend 1½ -in. above top of deck Slab thickness must be ≥ 2” above steel deck
6
Composite Members Specification p. 16.1-40
I3 Flexural Members (cont.) Formed Steel Deck 5b. Deck Ribs Perpendicular to Steel Beam Max shear stud spacing 36 in. Shear stud strength reduction factor – eq. I3-1 ≤0.75 if only single stud in rib Deck must be anchored every 18 in. 5c. Deck Ribs Oriented Parallel to Steel Beam Shear stud strength reduction factor – eq. I3-2 applied if wr/hr ≤1.5 Design Shear Strength
7
Composite Members Specification p. 16.1-40
I5 Shear Connectors – shear studs or channels Length shear studs, Hs ≥ 4 stud diameters - Strength of Stud Shear Connectors Eq. I5-1 modified by reduction factors Required Number of Connectors
8
Composite Members Specification p. 16.1-40
I5 Shear Connectors – shear studs or channels Required Number of Connectors – Number required must be provided from section of maximum bending moment to adjacent section of zero moment. Shear Connector Placement and Spacing Stud diameter ≤2.5 tf (prevent tear out) Minimum spacings ribs parallel: longitudinal – 6 x stud diameter transverse – 4 x stud diameter ribs perpendicular: 4 x stud diameter (long. and trans.) Maximum spacing 8 x slab thickness
9
Composite Construction p.5-33
Effective concrete flange force (∑Qn) Y1 – Distance from PNA to beam top flange Y2 – Distance from concrete flange force to beam top flange b – effective width of concrete slab flange a – effective concrete flange thickness b Ycon a Y2 Y1 PNA
10
Composite Design Example p. 39 notes
Redesign the floor system previously designed (example p. 33), using composite construction. A992 steel and 3500 psi concrete.