Presentation is loading. Please wait.

Presentation is loading. Please wait.

August 19, 2004 0730 hrs. SEOC LEVEL 1 24 Hour Operations.

Similar presentations


Presentation on theme: "August 19, 2004 0730 hrs. SEOC LEVEL 1 24 Hour Operations."— Presentation transcript:

1 August 19, 2004 0730 hrs

2 SEOC LEVEL 1 24 Hour Operations

3 Mike DeLorenzo Up next – FEMA SERT CHIEF

4 FEMA

5 Current Issues – –Working with State to determine specific needs for temporary school classroom space –Continuing to process and follow-up on Action Requests for a wide range of services in support of current on-going operations Unmet Needs – –The Atlantic ROC is processing trailers/reefers requests for the storage of water and ice at various locations (ARF 68 & 69) Future Operations – –Anticipate transition to the Orlando DFO today Up next – Meteorology

6 METEOROLOGY

7 Thursday – Surface Analysis

8 Recovery Forecast Today: Scattered showers and thunderstorms in the afternoon Partly cloudy, with a high near 91 Chance of rain 50 percent Heat index values as high as 101 Light south-southwest winds between 4 and 7 mph Tonight: Scattered showers and thunderstorms before 11 PM Low around 76 Chance of rain 50 percent Southwest wind between 4 and 7 mph becoming calm Up next – Operations Chief

9 Up next – Emergency Services OPERATIONS CHIEF

10 EMERGENCY SERVICES

11 Current Operations – –Continuing to rotate response personnel –Received authorization and guidance from FDEP on debris burning –Safety and health of the responders and victims Unmet Needs – –(9) Temporary fire stations –Assessing the mental/physical condition of local responders Future Operations – –Preparing additional fire resources for deployment in anticipation of power restoration in affected areas –Continue to transition to long-term recovery and support functions –Follow-up on asset and personnel –deployment status Emergency Serivces Up next – Human Services

12 HUMAN SERVICES

13 Current Operations – –Currently all material requests are to be forwarded by the requesting county directly to the appropriate LSA. Only material requests, which cannot be met by the LSA will be forwarded to the EOC for action. –Food, water and ice remain a priority for the hardest hit counties but supplies are plentiful and delivered on a regular schedule. –The Disaster Field Office opened today. The address is 100 Support Lane, Orlando –An additional DRC will be opened shortly in Kississimi (Osceola County) Unmet Needs – –Requests for comfort stations and especially mobile showers remain high, but additional units will be available shortly. Human Services

14 Future Operations – –Requests for comfort stations and especially mobile showers remain high, but additional units will be available shortly. –As the immediate need for food and water is being met, short and long-term housing will become the major unmet need. –Human Services Branch is developing a staffing plan for future relocation of function to Charlie Command Human Services Up next – Infrastructure

15 INFRASTRUCTURE Up next – Military Support

16 ESF 13 – MILITARY SUPPORT

17 Military Support Current Operations – –3908 Florida National Guard soldiers and Airmen on State Active Duty supporting current operations –1000+ assigned to security missions –RIAT/GST missions complete –LSA operations continuously improving –CH-47 aircraft conducting airlift ops in support of LSA operations Unmet needs – –None Future Operations – –Continue to provide support to law enforcement, security, humanitarian and logistical operations Up next – Logistics

18 LOGISTICS

19 Logistics Current Operations – –Tracker Changes Memo Unmet needs – –Checking Message Status to Insure Tasking Future Operations – –Staff Planning Up next – Finance & Administration

20 FINANCE & ADMINISTRATION

21 Finance and Administration Current Issues – –Processed travel authorization requests and travel arrangements for people in the field. –Processing multiple purchase requisitions and purchase orders. –Total state agency costs through 8/17/04 $235,884,138 Unmet Needs – –None at this time Future Operations – –Continue to support EOC requests. Up next – Public Information

22 ESF 14 – PUBLIC INFORMATION Up next – Recovery

23 RECOVERY Up next – SERT Chief

24 SERT CHIEF Mike DeLorenzo

25 Don’t forget to turn your phone’s ringer back on! Thanks for your cooperation

26 August 19 at 1800 Branch Chiefs NEXT BRIEFING


Download ppt "August 19, 2004 0730 hrs. SEOC LEVEL 1 24 Hour Operations."

Similar presentations


Ads by Google