Download presentation
Presentation is loading. Please wait.
Published bySharleen Hill Modified over 9 years ago
1
HAND BLENDER
2
INDEX :- INTRODUCTION OVER VIEW MARKET PRODUCT APPLICATION AND COSTION ATTACHMENT METHOD PROCEDURE FEATURE ADAPTION AND MARKET SCOPE ESTIMATE PROJECT COST AND TIME
3
INTRODUCTION :- When operate the hand blender, we could not handle continuously due to more weight and motor initial torque. Because of, Generally all the Hand blender is constructing with motor.the main theme is motor separate from blender and power getting from mixer grinder unit.
4
Transmission cable Top locking cover Press switch Body Frame OVER VIEW :- Blade (inside) Mixer unit Blender Coupler
5
MARKET PRODUCT :-
6
1.Get blender and lock blender coupler in mixer unit. 2.Hold the blender unit one hand( don't press on the press button). 3.Switch on the mixer motor,now motor is running. 4.The motor power is transmitted motor coupler to blender coupler thro flexible transmitted wire. 5.Now blender coupler is running but blender blade is not running until push the press button. 6.Press the push button blade is running. 7.Dip the blade into the ingredients. 8.After complete process remove the finger from the push button.now blender blade rotation stopped 9.Then stop the motor, unlock the blender coupler and wash keep it safely. PROCEDURE:-
7
APPLICATION AND COSTION:- 1.Quick made chutney paste. 2.Baby foods such as egg,boiled vegetable can be blending. 3.Soup making 4.Smoothies. 5.Curry blending. BOM COSTING :- APPLICATION:- For attachment only: 8USD
8
FEATURE ADAPTION AND MARKET SCOPE :- 1.Atta kneading. 2.Adjust various speed by push button pressing. Marketing scope European countries, USA,Singapore, is a main marketing countries. those the countries blender is using in foods regularly. Feature adaption :-
9
Development cost: 100000 Tool cost: 200000 Testing cost: 50000 other cost: 25000 Project costing(US $) Project time : Final design freezing: 5 to 6 month Prototyping:3 to 4 month Testing : 1 to 2 month Tooling & correction: 1 to 2 month Final Testing: 1 to 1.5month Estimate Project cost and time:-
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.