Presentation is loading. Please wait.

Presentation is loading. Please wait.

1/10 CJK IMT 25, Beijing, China TTA PG707 Status Report CJK IMT 25 Beijing, China May 19, 2010 CHUNG, Hyun Kyu (HK) CJK-IMT25-xxx.

Similar presentations


Presentation on theme: "1/10 CJK IMT 25, Beijing, China TTA PG707 Status Report CJK IMT 25 Beijing, China May 19, 2010 CHUNG, Hyun Kyu (HK) CJK-IMT25-xxx."— Presentation transcript:

1 1/10 CJK IMT 25, Beijing, China TTA PG707 Status Report CJK IMT 25 Beijing, China May 19, 2010 CHUNG, Hyun Kyu (HK) (hkchung@etri.re.kr) CJK-IMT25-xxx

2 2/10 CJK IMT 25, Beijing, China Introduction PG707 Work Scope Updates of Current Activities Future Plans : PG707

3 3/10 CJK IMT 25, Beijing, China 1. Introduction : PG707 Positioning Mobile Communication Technical Committee (TC7) IMT- Advanced PG(PG701) IMT WiBro PG(PG702) Mobile Platform & Service PG (PG703) WLAN PG (PG704) Cognitive Radio PG (PG705) VHO PG (PG706) IMT Evaluation PG(PG707) ToR (Terms of Reference) of PG707 – – Evaluate for proposed RIT/SRIT of IMT-Advanced   Develop evaluation report / Submit evaluation report to ITU-R – – Cooperate and coordinate with international/domestic standardization bodies related to evaluation   ITU-R WP5D, 3GPPs, IEEE 802, SDOs ToR (Terms of Reference) of PG707 – – Evaluate for proposed RIT/SRIT of IMT-Advanced   Develop evaluation report / Submit evaluation report to ITU-R – – Cooperate and coordinate with international/domestic standardization bodies related to evaluation   ITU-R WP5D, 3GPPs, IEEE 802, SDOs

4 4/10 CJK IMT 25, Beijing, China 2. PG707 Work Scope   Evaluation Targets 3GPP LTE-Advanced Contributions from Individual Members(IM) for 3GPP self-evaluation. PG707 internal evaluation to be harmonized with IM’s contributions. IEEE 802.16m Contributions from Individual Members(IM) for IEEE self-evaluation. PG707 internal evaluation to be harmonized with IM’s contributions. ( WG7028 under PG702 are preparing Self Evaluation as a proponent)   Evaluation Scope Full scale evaluation for FDD /TDD of 802.16m Full scale evaluation for FDD of LTE-Advanced Confirm performance reported by the proponent

5 5/10 CJK IMT 25, Beijing, China 3. Activities on Evaluation   Submission of the preliminary evaluation reports As an IEG of WP5D, TTA PG707 submitted two preliminary evaluation reports on the candidate IMT-Advanced (s)RITs in the 7 th meeting of WP5D. (5D/652) 3GPP LTE Release 10 & beyond (LTE-Advanced) (5D/653) Based on IEEE 802.16 We focused on the simulation works Cell spectral efficiency Cell edge-user spectral efficiency VoIP capacity Our simulation results have similar values from proponent's self evaluation results which meet the minimum requirement of IMT-Advanced technology

6 6/10 CJK IMT 25, Beijing, China 3. Activities on Evaluation   Drafting Group (DG) Activities We have organized two sub-DGs for developing the evaluation reports IEEE Sub-DG LTE Sub-DG The evaluation report will be made based on the contributions from IMs We have conducted simulation works based on the simulation configuration presented in the proponent's self-evaluation Assessments by analysis and inspection are considered Verify the results based on the proponent’s self-evaluation and discussion results of the Correspondence Group of WP5D

7 7/10 CJK IMT 25, Beijing, China 3. Activities on Evaluation   Schedule for developing the evaluation reports 05 December 2009: 1 st call for the evaluation results 31 December 2009: Develop the initial preliminary evaluation reports 29 January 2010: Finalize the preliminary evaluation reports February 10 2010: Submit the preliminary evaluation reports to ITU-R 30 April 2010: 2 nd call to the participants for the final evaluation. 28 May 2010: Finalize the final evaluation report 02 June 2010: Submit the final evaluation report to ITU-R

8 8/10 CJK IMT 25, Beijing, China 3. Activities on Evaluation   Participation in the 2 nd workshop and meeting As an IEG of WP5D, TTA PG707 participated in the following workshop and meeting IEEE 802.16 IMT-Advanced Evaluation Group Coordination Meeting (May 17, 2010, Beijing, China) 3GPP LTE-Advanced Evaluation Workshop (May 18, 2010, Beijing, China) TTA PG707 presented on a status and final result of evaluation for two candidate IMT-Advanced (s)RITs.

9 9/10 CJK IMT 25, Beijing, China 4. Future Plans : PG707   Finalization and submission of the final evaluation reports As an IEG of WP5D, TTA PG707 will submit final evaluation reports on two candidate IMT-Advanced (S)RITs to the 8 th meeting of WP5D Full scale evaluation (Analysis, Inspection, Simulation) including, Compliance template for services Compliance template for spectrum Compliance template for technical performance Update the Simulation Results Full buffer performance Mobility performance

10 10/10 CJK IMT 25, Beijing, China www.tta.or.kr


Download ppt "1/10 CJK IMT 25, Beijing, China TTA PG707 Status Report CJK IMT 25 Beijing, China May 19, 2010 CHUNG, Hyun Kyu (HK) CJK-IMT25-xxx."

Similar presentations


Ads by Google