Presentation is loading. Please wait.

Presentation is loading. Please wait.

Jochen Frühauf CBM-Collaboration Meeting 12.-16.04.2010.

Similar presentations


Presentation on theme: "Jochen Frühauf CBM-Collaboration Meeting 12.-16.04.2010."— Presentation transcript:

1 Jochen Frühauf CBM-Collaboration Meeting 12.-16.04.2010

2  Status PADI PCBs  Readout System FEET-PADI & CAEN HPTDC ◦ Active LVDS Splitter ◦ Results  Readout System FEET-PADI/FEET-GET4 & ROC ◦ Overview ◦ Status  Outlook 2 Jochen Frühauf CBM-Collaboration Meeting 12.-16.04.2010

3  PADI II ◦ 4 PCBs @ China ◦ 2 PCBs @ India ◦ 1 PCBs @ Heidelberg (Sebastian Manz / ROC Setup) ◦ 3 PCBs @ GSI (3 PCBs not fully equipped)  PADI III ◦ 2 PCBs @ Rossendorf (CAEN Setup) ◦ 2 PCBs @ Heidelberg (Ingo Deppner / CAEN Setup) ◦ 9 PCBs @ GSI (6 PCBs not fully equipped)  30 PADI II & 30 PADI III are here @ GSI o PCBs are not available at the moment (one PCB is equipped with 2 PADIs => 8 Channel) 3 Jochen Frühauf CBM-Collaboration Meeting 12.-16.04.2010

4  2 CAEN HPTDCs V1290 ◦ one TDC for leading edge and one TDC for trailing edge =>it is necessary to split the output signals of PADI  problems with passive splitting leaded to an active solution ◦ tests with 1:10 LVDS-Splitter (Clock Distributor 2, Karsten Koch) 4 Jochen Frühauf CBM-Collaboration Meeting 12.-16.04.2010

5 5 Pulse Generator Trigger Logic LVDS LVTTL 1:10 LVDS Splitter 1:10 LVDS Splitter Jochen Frühauf CBM-Collaboration Meeting 12.-16.04.2010 Attenuator VME-Readout Reference Signal Dead Time lock TDC A TDC B Trigger FEET-PADI

6 35 ps typical from HPTDC manual From reference signal split into two channels of TDC 6 Jochen Frühauf CBM-Collaboration Meeting 12.-16.04.2010 =>developed PCB with 8x1:2 splitter for Feet-PADI

7 LVDS Splitter for FEET-PADI (FEET-PADI-LVDS-AD1)  8 x 1:2 LVDS Splitter (MAX9174)  100Ω impedance controlled PCB  1 PCB for 1 FEET-PADI  30 PCBs are ordered ◦ delivery date 16.04.2010 (not equipped!) Input PADI Signals Output for TDC A Output for TDC B 70mm 7 Jochen Frühauf CBM-Collaboration Meeting 12.-16.04.2010

8  system tests in Heidelberg with HD-RPC (Ingo Deppner) ◦ will be used next Beam time  possible that all “Test-RPCs” will have the same readout system ◦ => good for comparison of the different RPCs  LVDS splitter for FEET-PADI will be available soon 8 Jochen Frühauf CBM-Collaboration Meeting 12.-16.04.2010

9 9

10  CLOSY2 (Karsten Koch) ◦ Clock Generator (250MHz, 156.5MHz, Sync Pulse)  3x Clock Distribution2 (Karsten Koch)  FEET-PADI (Mircea Ciobanu)  FEET-GET4 (Holger Flemming/Harald Deppe)  R2F (Holger Flemming) ◦ (Adapter between FEET-GET4 & ROC)  ROC (KIP Heidelberg) 10 Jochen Frühauf CBM-Collaboration Meeting 12.-16.04.2010

11  2 full systems are available for tests ◦ 1x @ GSI ◦ 1x @ KIP Heidelberg  only a few communication tests are done 11 Jochen Frühauf CBM-Collaboration Meeting 12.-16.04.2010

12  no Input – Signals for FEET-PADI  Msg:5 Roc:0 Epoch2:01000000 Msg:5 Roc:0 Epoch2:00000000 Msg:5 Roc:0 Epoch2:01000000 Msg:5 Roc:0 Epoch2:00000000 Msg:5 Roc:0 Epoch2:01000000 Msg:5 Roc:0 Epoch2:01000000 Msg:5 Roc:0 Epoch2:00000000 Msg:5 Roc:0 Epoch2:01000001 Msg:5 Roc:0 Epoch2:00000001 Msg:5 Roc:0 Epoch2:01000000 Msg:5 Roc:0 Epoch2:00000000 Msg:5 Roc:0 Epoch2:00000000 …….. Jochen Frühauf CBM-Collaboration Meeting 12.-16.04.2010 12

13  24 times ◦ Msg:5 Roc:0 Epoch2:01000000 ◦ Msg:5 Roc:0 Epoch2:00000000  followed by 1 time ◦ Msg:5 Roc:0 Epoch2:01000001 Msg:5 Roc:0 Epoch2:00000001  Bit for “CLOSY SYNC PULSE”  Data GET4 Nr.:0 and Nr.:1  amount of Epoch messages & Sync Pulse message are consistent Jochen Frühauf CBM-Collaboration Meeting 12.-16.04.2010 13

14  with 50mV / 10ns Input Signals for FEET-PADI CH1/CH8  Msg:6 Roc:0 Get4:01 Chn:3 Edge:1 Ts:7c43a Msg:6 Roc:0 Get4:00 Chn:0 Edge:0 Ts:784c0 Msg:6 Roc:0 Get4:01 Chn:3 Edge:1 Ts:7c47c Msg:6 Roc:0 Get4:00 Chn:0 Edge:1 Ts:7c438 Msg:5 Roc:0 Epoch2:01000000 Msg:6 Roc:0 Get4:00 Chn:0 Edge:1 Ts:7c47a Msg:6 Roc:0 Get4:01 Chn:3 Edge:0 Ts:0851e Msg:5 Roc:0 Epoch2:00000000 Msg:6 Roc:0 Get4:01 Chn:3 Edge:0 Ts:08560 Msg:6 Roc:0 Get4:00 Chn:0 Edge:0 Ts:08511 Msg:6 Roc:0 Get4:01 Chn:3 Edge:1 Ts:084fc ………… Jochen Frühauf CBM-Collaboration Meeting 12.-16.04.2010 14

15  data shows hits in the used channel  timestamp counters of GET4 are increasing up to the next “Epoch Message” and afterwards these counters are reseted  different error messages and external sync events in the data stream ◦ only for input signals in the 2 nd GET4 chip ◦ no error or ext. sync messages for the 1 st chip  crosstalk in the 2 nd GET4 Chip ◦ only from Channel 0,1,2 to Channel 3 Jochen Frühauf CBM-Collaboration Meeting 12.-16.04.2010 15

16  modification in the FPGA code of the ROC ◦ include timestamp counters, system messages  GO4 analysis  testing setup  test Or-Output of PADI  test I 2 C Interface of FEET-PADI for threshold adjustment 16 Jochen Frühauf CBM-Collaboration Meeting 12.-16.04.2010

17


Download ppt "Jochen Frühauf CBM-Collaboration Meeting 12.-16.04.2010."

Similar presentations


Ads by Google