Presentation is loading. Please wait.

Presentation is loading. Please wait.

SEERA-EI WP5 – Dissemination and liaison with pan- European initiatives Bucharest, 7 July 2009 Roumen Trifonov SAITC

Similar presentations


Presentation on theme: "SEERA-EI WP5 – Dissemination and liaison with pan- European initiatives Bucharest, 7 July 2009 Roumen Trifonov SAITC"— Presentation transcript:

1 SEERA-EI www.seera-ei.eu WP5 – Dissemination and liaison with pan- European initiatives Bucharest, 7 July 2009 Roumen Trifonov SAITC R.Trifonov@government.bg SEERA-EI project second PSC, Bucharest, 7-8 July 2009

2 SEERA-EI PSC02 meeting, Bucharest, 7-8 July 2009 Outline  Overview  Objectives  Tasks  Deliverables & Milestones  Person-months per participant  Timing of WP5 and its components  Planning for 1 st project period (18 months)  Event Actions  Dissemination event monitoring

3 SEERA-EI PSC02 meeting, Bucharest, 7-8 July 2009 Objectives  A platform for PR, communication and dissemination of information about SEERA-EI, including also liaisons and SEERA-EI branding will be provided  Ensuring that the relevant activities in eInfrastructure programme coordination on the European level are followed in detail and contributed to significantly liaison with eIRG, ESFRI and EGI  Liaison with regional eInfrastructure activities  Organization of an open event of EU Ministries  General dissemination activities of project results.

4 SEERA-EI PSC02 meeting, Bucharest, 7-8 July 2009 WP5 Task  A5.1 – Dissemination and outreach  This task has to ensure a wide dissemination campaign aimed at national, regional and European levels, encompassing the audience as wide as research infrastructure operators and users, other government bodies and policy makers, and industry.  A5.2 – Related Initiatives’ liaison  This task has to ensure that the relevant activities in eInfrastructure programme coordination on the European level are followed in detail and contributed to significantly.  A5.3 – Develop and maintain promotional material  The project has to prepare a promotional package including the project brochure or fact sheet and a presentation, which will be updated when needed. Newsletters, distributed through existing established channels will ensure a wide information flow and dissemination activity

5 SEERA-EI PSC02 meeting, Bucharest, 7-8 July 2009 Deliverables and month of delivery (1)  D5.1a – SEERA-EI Promotional material – M06  This deliverable will outline the project promotional material. The material includes a brochure or a fact sheet and an electronic presentation of the project’s main characteristics (i.e. consortium structure, goals and objectives, etc.). The aim of these materials will be to spread the project’s strategic mission and objectives with different formats adapted to the events where the SEERA-EI will be presented.  D5.2a – Intermediate report on project dissemination and outreach – M18  This deliverable will include the reports on all dissemination activates the project will pursue. Concertation events, representation in eInfrastructure workshops and presentations to conferences are a few to name.

6 SEERA-EI PSC02 meeting, Bucharest, 7-8 July 2009 Deliverables and month of delivery (2)  D5.3a – Intermediate report on project liaison activities – M18  D5.3 includes reports from the result of liaison with similar regional or European activities. Some of them have already been addressed and ranked as of high priority. To name a few, GEANT and EGEE are the cornerstone projects that the consortium will establish substantial synergies.  D5.4 – Project conference for EU audience – M30  D5.4 will report on the results of a regional workshop of SEERA-EI with a broader audience that will also serve to increase the interaction of research communities and concentrate on project opportunities appeared by the realization of SEERA-EI.

7 SEERA-EI PSC02 meeting, Bucharest, 7-8 July 2009 Deliverables and month of delivery (3)  D5.1b– SEERA-EI Promotional material – M31  Second version of D5.1  D5.2b – Final report on project dissemination and outreach – M36  Second version of D5.2  D5.3b – Final report on project liaison activities – M36  Second version of D5.3

8 SEERA-EI PSC02 meeting, Bucharest, 7-8 July 2009 Deliverables Del. no.Deliverable nameDelivery date (proj. month) Lead benefi- ciary Est. indicative PMs D5.1a/b SEERA-EI Promotional material M6/M31GRNET5 D5.2a/b Intermediate report on project dissemination and outreach M18/M36IPP33 D5.3a/b Intermediate report on project liaison activities M18/M36SAITC33 D5.4 Project conference for EU audience M30TUBITAK5

9 SEERA-EI PSC02 meeting, Bucharest, 7-8 July 2009 Milestones Lead benefi- ciary Deli- very date Means of verifica- tion Objective addressed M5.1 -Intermediate dissemination and related activities reports available IPPM18D5.2a D5.3a O8: - Enable information exchange with rest of ERA, carry out international collaboration activities, and contribute to EU policy on eInfrastructures M5.2 -Project conference for EU audience TUBITAKM30D5.4 Conference M5.3 -Final dissemination and related activities reports available IPPM36D5.2b D5.3b

10 SEERA-EI PSC02 meeting, Bucharest, 7-8 July 2009 Person-months per participant Participant number P01P02P03P04P05P06P07P08P09P10 Participant short name GRNETGSRTMoESPUoTMoCTSAITCIPP- BAS MoISMARNETASM Person- months per participant 6355567334 Participant number P11P12P13P14P15P16P17P18P19- Participant short name RENAMMoESUoMANCSRoEdu Net MoSUoB- RCUB TUBITAKULAKBIM Person- months per participant 444343322 Total PMs: 76

11 SEERA-EI PSC02 meeting, Bucharest, 7-8 July 2009 Timing of WP5 and its components

12 SEERA-EI PSC02 meeting, Bucharest, 7-8 July 2009 WP5 Activity Leaders (Task leaders)  Actions  Define the activity leader per task  Send the name + email of the activity leaders per partner to me  Create/Subscribe to the mailing lists  Communication about dissemination: „-all” list

13 SEERA-EI PSC02 meeting, Bucharest, 7-8 July 2009 Planning for 1 st project period (18 months)  Dissemination events have to target at all society levels, including policy-makers, users, commercial environment, mass media  1 regional policy meeting + 1 regional dissemination event for broader public: when? where? suggestions?  1 country-level dissemination event per country targeting local public, 20 attendants per event minimum  Policy Meetings organization: 1-1 per project partner  Maintaining:  Publications and paper repository  Event calendar  Promotional package, communication infrastructure

14 SEERA-EI PSC02 meeting, Bucharest, 7-8 July 2009 Event Actions (EA)  Plan four event minimum 1-2 month ahead  Let other partners attend on the event if you are an organizer (!visa!)  Announce the event on the Dissemaination Agenda! (automatic email will go to the appropriate lists)  Please, provide enough info on:  Minimal info about dissemination events (before)  Name/DATE/Type/Target/Location/Description/Contact/etc.  Links to web presence (if any)  PR materials created for the event  Minimal info about dissemination event (after)  Presentations uploaded to Dissemination Portal  Pictures uploaded to Dissemination Portal  Evaluation Form of the training upload to Dissemination Portal

15 SEERA-EI PSC02 meeting, Bucharest, 7-8 July 2009 Papers/Presentations/PR/Other Media  Actions  Repository location (SAITC?)  SEERA-EI project s should be mentioned in the material in standardized mode  Create the reference template  Upload the material to the common repository and comment it  Where, who, impact, etc.  Digitalized version (TV/Radio/newspaper),

16 SEERA-EI PSC02 meeting, Bucharest, 7-8 July 2009 Dissemination event monitoring  Quantitative  Number of events  Number of attendees (event size)  Number of communities  Number of Institutes/governmental organizations  Number of SMEs  …  Qualitative  Feedback from attendees  Type of Institutes/SMEs/governmental organizations  … Action: Please send your ideas Event organizer/participants should provide the statistics after the event

17 SEERA-EI PSC02 meeting, Bucharest, 7-8 July 2009 Dissemination actions done…  Open e-IRG Workshop, Prague, Czech Republic May 14-15, 2009  E-IRG meeting of delegates, Prague, Czech Republic May 15 and June 17, 2009  Press-release in BAS bulletin, Sofia, Bulgaria http://www.bas.bg/fce/001/0145/files/bul135.pdf May, 2009  7FP Infoday, Sofia, Bulgaria June 2, 2009  Super-computer center competition for software environment for biochemistry, seismology, air pollution, dynamics, Sofia, Bulgaria June, 2009

18 SEERA-EI PSC02 meeting, Bucharest, 7-8 July 2009 Coming events so far…  Workshops  On-line seminars  Brochures  Any other suggestions?

19 SEERA-EI PSC02 meeting, Bucharest, 7-8 July 2009 WP5 THANK YOU FOR THE ATTENTION !


Download ppt "SEERA-EI WP5 – Dissemination and liaison with pan- European initiatives Bucharest, 7 July 2009 Roumen Trifonov SAITC"

Similar presentations


Ads by Google