1 GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS 4.1.9 I&T Engineer B. Grist WBS 4.1.9.1 Reliability & QA D. Marsh WBS 4.1.9.2 Environmental Test Manager M. Lovellette Online Manager R. Claus Science Verification, Analysis, and Calibration E. do Couto e Silva Particle Test Manager G.Godfrey Integration, Facilities, Configuration, and Test O.Millican (Acting) Instrument Operations Coordinator S. Williams Mechanical Ground Support Equipment TBD I&T Preparation 4.1.9.3 EM1 Model I&T&C Calibration Unit I&T 4.1.9.4 Flight LAT I&T 4.1.9.6 Mission I&T Support 4.1.9.7 I&T Preparation 4.1.9.3 EM1 Model I&T&C Calibration Unit I&T 4.1.9.4 Flight LAT I&T 4.1.9.6 Mission I&T Support 4.1.9.7 I&T Preparation 4.1.9.3 Flight LAT I&T 4.1.9.6 Mission I&T Support 4.1.9.7 I&T Preparation 4.1.9.3 EM1 Model I&T&C Calibration Unit I&T 4.1.9.4 Flight LAT I&T 4.1.9.6 Mission I&T Support 4.1.9.7

2 GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 2 Function of Environmental Test Demonstrate the the LAT meets all environmental requirements –Electromagnetic Compatibility –Structure: “modes” & “loads” –Thermal limits –Workmanship Exact test requirements/ implementation is TBD Do not over test

3 GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 3 ENVIRONMENTAL TEST FLOW RECEIVING INSPECTION EMI/EMC MODAL SURVEY VIBE/ ACOUSTIC TBAL/TVAC POST TEST INSPECTION EMI TRR VIBE TRR TVAC TRR PRE SHIP REVIEW Before shipment to NRL there will be combined preship and environmental test readiness review Functional test required before and after each environmental test Inspection of instrument will be performed before and after each test TRR = Test Readiness Review

4 GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 4 EMI/EMC TESTING Test to: GSFC 433-RQMT-0005 Demonstrates that adequate margin exists between susceptibility and noise levels Ensure compatibility of LAT with other SV systems Ensure compatibility of other SV system with LAT Principal test areas –Radiated Emissions –Conducted Emission –Radiated Susceptibility –Conducted Susceptibility –Magnetic survey if required Baseline test facility Naval Center for Space Technology - –2 Anechoic chambers Typical test duration 3-5 days

5 GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 5 MODAL SURVEY Verifies dynamic characteristics of structure Issue: –With the deletion of the qual. grid we expect the requirement for a fixed base modal survey Not determined at this point if this will be done on the grid with mass simulators or on the integrated LAT –Late in the program if there is a problem Modes could also be verified with a base driven shake Fixed base modal survey can be done at NRL –Expected duration one week

6 GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 6 Random vibration/acoustic Verifies workmanship Verifies structural integrity Verifies modes Can be performed by random vibration testing, acoustic, or vibroacoustic testing Typical test duration 3 - 5 days

7 GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 7 Thermal Balance Testing Verifies thermal model Verifies ability to operate in vacuum and at upper and lower temperature limits Test should be performed in as close to flight configuration as possible –Thermal blankets –Heat pipes –Radiators –Facility inputs: heaters/ solar simulators/ cold plates Thermal model is verified for cold case and hot case Functional tests performed after cold soak and during hot plateau Possibly performed after integration with SV

8 GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 8 Thermal Cycling Verification of workmanship Plan is for four total cycles at integrated LAT level –Thermal balance counts as one Duration of cycles TBD Comprehensive performance testing to be performed at each plateau Functional testing will be performed throughout TVAC except when the instrument must be off for cooling ramps/soaks Close door & Functional test TBAL Cold TBAL Hot ~28 days

9 GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 9 QA / MA Support GSE verification –Mechanical GSE document verification Shipping containers Transportation dolly Test fixtures Lifting fixtures Cooling cart (if required) –Electrical GSE document verification Computer system Ground power system Test harnesses Breakout boxes Preship review and verification Dispensation of open problem/non conformance reports and their impact on further testing

10 GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 10 QA/MA - con’t Receiving inspection at NRL Verification of cleanliness, temperature, humidity controls and ESD Test facilities verification Review test plans and procedures Test support and verification of test results Preparation of work orders, anomaly and anomaly resolution reports Inspection of hardware prior to and after test Preparation and management of test logs and status reporting –Test conductors log –Event logbook –Anomaly reports –Configuration status –Mate/demate logs, etc.

11 GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 11 Schedule FY02: –PDR Test requirements definition –CDR Preliminary test plans & resource identification FY03 –Finalize test plans –Finalize resource identification / allocation FY04 –Finalize test procedures –Begin environmental testing FY05 –Complete environmental testing –Prepare test reports, close all anomalies –Support observatory level environmental testing FY06 –Support LEO