Presentation is loading. Please wait.

Presentation is loading. Please wait.

Introduction to WP 8F SG 8 Seminar Peter Scheele, Germany, for the Chairman of WP 8F.

Similar presentations


Presentation on theme: "Introduction to WP 8F SG 8 Seminar Peter Scheele, Germany, for the Chairman of WP 8F."— Presentation transcript:

1 Introduction to WP 8F SG 8 Seminar Peter Scheele, Germany, for the Chairman of WP 8F

2 Peter Scheele, Germany, for the Chairman of WP 8F SG 8 SeminarWP 8F Chair/Vice-Chair WP 8F Chairman Mr. Stephen Blust Cingular Wireless Tel.: +1 404 236 5924 E-mail: Stephen.blust@cingular.com WP 8F Vice-Chairman and WG SERV Chairman Mr. Kyu-Jin Wee Ministry of Information and Communication, Republic of Korea Tel.: +8 227 106 551 E-mail: kjwee@rrl.go.kr WP 8F Vice-Chairman and AH Workplan Chairman Mr. Håkan Ohlsén Ericsson, Sweden Tel.: +46 703 717 612 E-mail: hakan.ohlsen@ericsson.com

3 Peter Scheele, Germany, for the Chairman of WP 8F SG 8 SeminarWP 8F Scope (1): IMT-2000, defined by a set of interdependent ITU Recommendations. International Mobile Telecommunications-2000, also known as the Third Generation Mobile Systems, fulfils the goal of making anywhere, anytime communications a reality. As a strategic priority of ITU, IMT- 2000 provides a framework for world-wide wireless access by considering a highly capable wireless system of terrestrial and/or satellite based networks. WP 8F is responsible for the overall radio system aspects of IMT- 2000 and beyond. It has the prime responsibility within ITU-R Study Group 8 for issues related to the terrestrial component of IMT-2000 and beyond;

4 Peter Scheele, Germany, for the Chairman of WP 8F SG 8 SeminarWP 8F Scope (2): It liaises with ITU-T on network-related standardisation activities of IMT-2000 and beyond, and with ITU-D in relation to the application of IMT-2000 in developing countries. It maintains strong cooperative efforts with external organizations and defined standards development organisations (SDOs). It works closely with Working Party 8D on issues related to the satellite component of IMT-2000 and beyond. It is the lead group for the overall maintenance of existing and development of new Recommendations on IMT-2000, collaborating with Working Party 8D on the satellite elements.

5 Peter Scheele, Germany, for the Chairman of WP 8F SG 8 SeminarWP 8F Scope (3): WP 8F constructs the future of IMT-2000 and beyond by looking at a long-term vision and coordinating this with spectrum needs. WP 8F considers these broad areas of impact in their work: the needs of the evolving marketplace for future wireless communications, the technologies required to fulfill those needs, the spectrum which is the natural resource of wireless, other issues associated with the world-wide advancement of IMT-2000 systems. A key element is the considerations of the needs of developing countries and how IMT-2000 can appropriately be tuned to meet those needs.

6 Peter Scheele, Germany, for the Chairman of WP 8F SG 8 SeminarWP 8F Scope (4): WP 8F provides a focal point for considerations on spectrum implications of the future development of IMT-2000. WP 8F is providing clarification of spectrum requirements as input to WRCs, considering spectrum requirements and recognizing the marketplace and the future development of systems beyond IMT- 2000. WP 8F works closely with the ITU-T Special Study Group on IMT- 2000 to ensure that IMT-2000 is considered from a coordinated system perspective.

7 Peter Scheele, Germany, for the Chairman of WP 8F SG 8 SeminarWP 8F Structure: WP 8F Plenary WRCSPECDEV TECH SAT Coord Ad-Hoc Migrate Ad-Hoc Workplan Working Groups Ad-Hoc and Coordination Groups Coordination with external forums (research, standards, other ITU groups, etc.) SERV

8 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 WRC-03 WRC-07 WRC Future Services / Market Analysis Draft text for WRC-07: Spectrum estimate Candidate freq ranges When What for / name Methods to satisfy agenda Footnote text Pooled / shared / paired / etc. ? Future Spectrum Calculation Methodology Future Spectrum Estimate Spectrum Survey Future Technology Assumptions Sharing Studies WP 8F WRC preparations WP 8F other spectrum- related activities 2.5 GHz Spectrum Plan Radio Aspects SG 8 SeminarWP 8F Work Plan Peter Scheele, Germany, for the Chairman of WP 8F

9 SG 8 SeminarWP 8F Meeting Schedule: Group Meeting number STARTSTOPPLACE WP 8F1413-Oct-0420-Oct-04Shanghai, China WP 8F1501-Feb-0508-Feb-05Geneva, Switzerland WP 8F1608-Jun-0515-Jun-05Quebec City, Canada WP 8F1712-Oct-0519-Oct-05Finland WP 8F1825-Jan-0601-Feb-06[Bangkok] WP 8F1903-May-0610-May-06[France] WP 8F2023-Aug-0630-Aug-06[USA] WP 8F2117-Jan-0725-Jan-07[Geneva] WP 8F2223-May-0731-May-07TBD WP 8F2313-Feb-0820-Feb-08TBD WP 8F2411-Jun-0818-Jun-08TBD WP 8F2508-Oct-0815-Oct-08TBD

10 SG 8 Seminar WP 8F web page http://www.itu.int/ITU-R/study-groups/rsg8/rwp8f/index.asp Peter Scheele, Germany, for the Chairman of WP 8F

11 SG 8 Seminar Peter Scheele, Germany, for the Chairman of WP 8F Thank you

12 Back Up SG 8 Seminar Peter Scheele, Germany, for the Chairman of WP 8F

13 Peter Scheele, Germany, for the Chairman of WP 8F SG 8 SeminarWP 8F Structure: GroupScope Future Services & Market Aspects WG SERV - to stimulate and co-ordinate the undertaking of market forecast studies - to develop deliverables on services, market and spectrum calculation methodology to assist in the preparation for WRC-07 in terms of potential spectrum requirements - to give examples of potential services and applications that could be delivered by future developments of IMT 2000 and systems beyond - this future services and market aspects work should drive the overall direction of WP 8F Developing WG DEV - to ensure that the requirements of the developing countries are reflected in the work and deliverables of WP 8F in the future development of IMT-2000 and systems beyond IMT-2000 - to revise the spectrum survey as part of the WRC-07 preparations - to update the IMT-2000 handbook if required Technology WG TECH - to provide the technology input into the WRC-07 preparations in terms of the assumptions of the potential capabilities and trends in radio access technology - to develop liaison with external research and standardisation forums - to manage the research topics web site and its findings - to update the relevant IMT-2000 radio interface related recommendations.

14 Peter Scheele, Germany, for the Chairman of WP 8F SG 8 SeminarWP 8F Structure: GroupScope Spectrum WG SPEC - to undertake co-existence studies and develop spectrum plans, including sharing of IMT-2000 and its enhancements with other radio services/systems. - to undertake co-existence studies, including sharing and compatibility of future development of IMT-2000 and systems beyond IMT-2000 with other radio services to support the WRC preparations for potential additional spectrum and frequency ranges [WRC-03 Resolution 228 resolves 5] - evaluation of the potential candidate bands to fulfil the spectrum requirements of the future development of IMT 2000 and systems beyond IMT-2000 and to identify what the potential additional spectrum may be for - to update ITU-R M.1036 to include detailed spectrum arrangements for 2.5 GHz

15 Peter Scheele, Germany, for the Chairman of WP 8F SG 8 SeminarWP 8F Structure: GroupScope WRC Preparations WG WRC - to prepare the draft text for the CPM report for WRC-07 - to consider methods to satisfy the expected WRC-07 agenda item Satellite Coordination SAT COORD - coordinate and ensure that the aspects of the satellite component of IMT-2000 are considered in the work of the development of deliverables of WP 8F Workplan AH W-PLAN - to coordinate the work of WP 8F to facilitate an efficient and timely production of its prioritised deliverables Migration AH MIGRATE - to produce texts on the migration and evolution aspects of IMT-2000 and its enhancements to support the ITU-D activities.


Download ppt "Introduction to WP 8F SG 8 Seminar Peter Scheele, Germany, for the Chairman of WP 8F."

Similar presentations


Ads by Google