TOT on Environmentally Sound Design and Implementation of PWs Community Roads of the PSNP June 13 – 23, 2011 Dessie, Ethiopia By Dessalegn Bezabih Roles.

Similar presentations


Presentation on theme: "TOT on Environmentally Sound Design and Implementation of PWs Community Roads of the PSNP June 13 – 23, 2011 Dessie, Ethiopia By Dessalegn Bezabih Roles."— Presentation transcript:

1 TOT on Environmentally Sound Design and Implementation of PWs Community Roads of the PSNP June 13 – 23, 2011 Dessie, Ethiopia By Dessalegn Bezabih Roles of Supervisors, DAs, Woreda Road Desk Officers in PSNP LBRC

2 1.Role of the Supervisor in LBRC:  Monitor the planning and design of road project (route selection, surveying, setting out, etc.)  Monitor quality of construction as per design (earthwork, drainage system, drainage structures,,  Prepare payment certificates and  Certify or approve payments on behalf of owner Roles of Supervisors, DAs, Woreda Road Desk Officers in PSNP LBRC

3 Environment Friendly PSNP Roads: Roles (Cont’d) 2. Roles of Development Agents:  Plan road work in detail as part of CBPWDP (when to do it and how to do it: Action plan),  Plan the required manpower,  Mobilize community or manpower,  Organize work force,  Guide the actual construction work on site, and  Report the work done periodically.

4 Environment Friendly PSNP Roads: Roles (Cont’d) 3. Roles of Woreda Road Desk or Office:  Train Development Agents on rural road planning and construction,  Facilitate/participate in planning of rural roads like alighnment selection, surveying, setting out,  Supervise rural road construction and assist DAs

5 Environment Friendly PSNP Roads: Roles (Cont’d) 4. Roles of Road Sector Government Institutions:  ERA: Ethiopian Roads Authority – staff training, standardization and technical support  RRAs: Regional Road Authorities – training, supervision and technical support

6 Environment Friendly PSNP Roads: Roles (Cont’d) 5. Roles of Different Programs  ERTTP - Ethiopian Rural Travel and Transport Program, a pilot integrated program, phased out  PSNP - Productive Safety Nets Program of FSP  (SARDP) - Sida-Amhara Rural Development Program, phased out, Nontheless,  Valuable experience achieved  Capacity built at all levels: region, zone, woreda and community  Local staff trained on LBRC, esp. Diploma in S/Wollo

7 Video Show ILO Video

8 Training of Trainer Personnel on Environmentally Sound Design and Implementation of Public Works- Community Roads of the Productive Safety Net Program (PSNP) June 13-24, 2011 Ghion Ambassel Hotel Dessé, Ethiopia