Presentation is loading. Please wait.

Presentation is loading. Please wait.

CEOS Working Group on Information Systems and Services - 1 Core Site WGISS Test Facility WGCV & WGISS Efforts John Faundeen & Stu Doescher, USGS WGISS-15.

Similar presentations


Presentation on theme: "CEOS Working Group on Information Systems and Services - 1 Core Site WGISS Test Facility WGCV & WGISS Efforts John Faundeen & Stu Doescher, USGS WGISS-15."— Presentation transcript:

1 CEOS Working Group on Information Systems and Services - 1 Core Site WGISS Test Facility WGCV & WGISS Efforts John Faundeen & Stu Doescher, USGS WGISS-15 May 2003 Toulouse, France

2 CEOS Working Group on Information Systems and Services - 2 Background o September 2001 proposal via WGCV (Yves-Louis Desnos) o WGISS-13 Discussions (Peter Churchill) o Spring of 2002 – USGS agrees to sponsor a WTF o The WTF plan discussed at … n WGCV Ottawa Meeting (May 2002) n WGISS Frascati Subgroup (May 2002) n WGISS Alexandria Subgroup (Sept. 2002) o The WGCV/WGISS WTF plan approved 15 October 2002 o edcsgs16.cr.usgs.gov/wgiss/ n username = calval99 password = wgiss03

3 CEOS Working Group on Information Systems and Services - 3 Objectives · * Establish linkages between site data archives to facilitate improved product access and knowledge assessments of the long-term stability and interoperability to address the challenges of the Terrestrial Carbon Observation (TCO) theme. * Ramp-up validation efforts, leveraging off of the infrastructure and protocols developed through existing site activities, · * Address science questions suitable for combined field and multi-resolution data. · * Enable ready collaboration between validation investigators and existing science networks and programs. · * Facilitate validation activities directed at better product knowledge and assessment of the products stability and interoperability.

4 CEOS Working Group on Information Systems and Services - 4 Goals: Phase I o Simple, Web-Based Interface Over CEOS Core Sites o Allow Users to Specify Conversion Parameters o Provide Access to EO and in-situ Data o Begin With MODIS & Landsat o Allow Reprojecting o Allow Reformatting into GeoTIFF

5 CEOS Working Group on Information Systems and Services - 5 Goals Phase II · Incorporate GTOS Terrestrial Ecosystem Monitoring Sites · Add CEOP/NASDA, CSIRO, GT-net, ILTERS as Phase II efforts · Enable synergy within and between Satellite/Sensor science teams for data collection and subsequent research · Provide science community with immediate, easily accessible data from CEOS member sensors · Provide a focus for ongoing satellite, aircraft, and ground data collection for validation of CEOS member satellite/sensor products · Provide scientists with sets of readily accessible in-situ and CEOS member instrument data for algorithm validation and improvement · Build on infrastructure of existing scientific networks and validation sites · Realize international cost-sharing opportunities

6 CEOS Working Group on Information Systems and Services - 6 The WGCV/WGISS WTF

7 CEOS Working Group on Information Systems and Services - 7 The WGCV/WGISS WTF

8 CEOS Working Group on Information Systems and Services - 8 The WGCV/WGISS WTF

9 CEOS Working Group on Information Systems and Services - 9 The WGCV/WGISS WTF

10 CEOS Working Group on Information Systems and Services - 10 The WGCV/WGISS WTF

11 CEOS Working Group on Information Systems and Services - 11 The WGCV/WGISS WTF

12 CEOS Working Group on Information Systems and Services - 12 The WGCV/WGISS WTF Email Notification for User: EMAIL:

13 CEOS Working Group on Information Systems and Services - 13 Re-Projection Tool Results Boreas Test Site MODIS Data in Sinusoidal Projection Boreas MODIS re-projected from Sinusoidal to Universal Transverse Mercator

14 CEOS Working Group on Information Systems and Services - 14 NAMING CONVENTIONS: DATA SET NAMES MOD09A1 MODIS/Terra Surface Reflectance 8-Day L3 Global 500m ISIN Grid ShortName Instrument Platform Parameter Temporal Resolution Processing Level Global or Swath Spatial Resolution Grid or not

15 CEOS Working Group on Information Systems and Services - 15 MOD09A1.A2000185.h11v05.003.2000193081710.hdf ShortName Julian Acquisition Date TileID Processing Version Julian Processing Data Year, Day, Hour, Minute, Seconds NAMING CONVENTIONS: FILE NAMES

16 CEOS Working Group on Information Systems and Services - 16 Summary o Close to Phase 1 Completion n SPOT Requirements Creep for Vegetation Accommodated o WGCV Happy With Results o CEOS Plenary Demo Planned n November 2003 o Phase II Requirements Captured n June 2003


Download ppt "CEOS Working Group on Information Systems and Services - 1 Core Site WGISS Test Facility WGCV & WGISS Efforts John Faundeen & Stu Doescher, USGS WGISS-15."

Similar presentations


Ads by Google