Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 The following presentation is from the Oracle Webcast “What’s New in P6 EPPM Release 8.1.” As a partner, you may not use the Oracle Power Point template,

Similar presentations


Presentation on theme: "1 The following presentation is from the Oracle Webcast “What’s New in P6 EPPM Release 8.1.” As a partner, you may not use the Oracle Power Point template,"— Presentation transcript:

1 1 The following presentation is from the Oracle Webcast “What’s New in P6 EPPM Release 8.1.” As a partner, you may not use the Oracle Power Point template, rather you must format the presentation slides according to your own template and branding. NOTE:

2 What’s New in Primavera P6 EPPM Release 8.1 May 19, 2011 Brian Saldutti Oracle Primavera Product Strategy

3 3 Agenda Refreshed User Interface Resource Management Project Management Risk Management Portfolio Management Administration Technologies P6 Professional Mobile Reporting

4 4 Refreshed User Interface

5 5 Icons replaced with text for easier readability Main navigation moved to tabs to easily identify where you are

6 6 Refreshed User Interface Detailed pages modernized and simplified

7 7 Refreshed User Interface Control Center Performance UI Scalability Buttons always appear when page scrolls to improve usability

8 8 Resource Management

9 9 Dates and duration fields available for viewing and updating in Resource Assignments tab

10 10 Resource Management Filter options available when assigning resources including currently opened projects

11 11 Resource Management Assign resources to multiple assignments at once and search for best fit

12 12 Resource Management Run Check Resource Overallocation to identify resource constraints that may impact the project

13 13 Resource Management Automatic notification appears when service is completed

14 14 Resource Management See resource overallocation in week increments Take action to fix the overallocation

15 15 Project Management

16 16 Project Management New fields available in EPS View – Last Scheduled Date Last Leveled Date Last Apply Actuals Date

17 17 Project Management Define Gantt bars based on User Defined Fields (UDFs)

18 18 Project Management Risk adjusted schedule views to reflect Risk Analysis data

19 19 Risk Management

20 20 Risk Management x Organize categories in a hierarchy for risk breakdown structure

21 21 Risk Management x Copy and paste risks within a single project or across multiple projects

22 22 Risk Management x Relative thresholds support for use across multiple projects

23 23 Risk Management Additional fields to better track and analyze risks

24 24 Risk Management Risk exposure and score available at the project level for analysis

25 25 Portfolio Management

26 26 Portfolio Management Drill into WBS UDFs Drill down to view and edit WBS UDF’s via the Dashboard and Portfolios

27 27 Administration

28 28 Project Scheduled Services Specify a rolling date when configuring project services

29 29 Scheduled Services Status Standardized log files for all services including translation support

30 30 User Sessions Administrators can reset sessions for users who have been locked out.

31 31 Technologies

32 32 New platforms Google Chrome 9 Browser Server platform – HP-UX Itanium Administration – Oracle Enterprise Manager 11g JRE 1.6.0_24+ BI Publisher 11g UCM 11g Brazilian Portuguese language support Additional Tools Project integrity checker Jackrabbit to UCM migration tool Technologies

33 33 P6 Professional

34 34 P6 Professional – Supports: stand alone and work groups P6 EPPM – Includes: P6 Web and Optional Client P6 PMDB End Users using P6 Optional Client End Users using P6 Web client P6 PMDB End Users using P6 Professional Import/Export Stand alone or Offline mode for P6 EPPM End Users using P6 Professional with local database Local P6 PMDB P6 EPPM Optional Client & P6 Professional 8.1

35 35 Mobile

36 36 Mobile – iPhone App Email comments and photos related to a task View assigned tasks by project Update time spent, time left & dates Graphical indicator of health/status Star favorite tasks

37 37 Mobile – Email Updates Filter list of tasks Send email to request tasks View assigned tasks by project Update time spent, time left & dates Easily mark a task complete Email changes to update P6 project Receive confirmation message for updates

38 38 Reporting

39 39 Reporting Changes P6 Schema increased to store calculated fields Incremental update of projects via trickle process – Project filter, Manual or Automatic publication Global Publishing Services BI Publisher 11g support – Web based report layout editor – Create reports that combine P6 data with other data sources P6 Analytics – Unlimited number of codes supported Benefits Improved performance Near real-time reporting ODS an optional component for BI Reporting SQL Server support 39 Reporting

40 40 P6 Reporting Database 2.x P6 Data Warehouse P6 Analytics 1.x P6 EPPM 8.1 P6 PMDB Resource Utilization Star Resource Assignment Star Project History Star Project Activity Star OBIEE+/SE-1 Oracle BI Answers P6 Metadata Oracle BI Interactive Dashboards P6 Catalog Oracle BI Publisher Near Real-Time Operational Reporting Transactional Reporting Static Operational Reporting Analytical Reporting ODS ETL Periodic Extract, Transform & Load Process Extension Tables and Views Reporting

41 41 Reporting Project options to enable publication and set priority

42 For more information please visit: www.oracle.com/primavera


Download ppt "1 The following presentation is from the Oracle Webcast “What’s New in P6 EPPM Release 8.1.” As a partner, you may not use the Oracle Power Point template,"

Similar presentations


Ads by Google