Status of TC5 (incl. ECSS Transfer) CEN-TC5 WG 6 report to 7th Plenary Meeting CEN-TC5 (status 15 December 2014)

Similar presentations


Presentation on theme: "Status of TC5 (incl. ECSS Transfer) CEN-TC5 WG 6 report to 7th Plenary Meeting CEN-TC5 (status 15 December 2014)"— Presentation transcript:

1 Status of TC5 (incl. ECSS Transfer) CEN-TC5 WG 6 report to 7th Plenary Meeting CEN-TC5 (status 15 December 2014)

2 Status of transfer of ECSS to EN 6 newly published ECSS documents sent to UAP Now total of 105 documents transferred (of the 121 agreed) 75 Published by CEN 24 documents completed successfully CEN UAP of which on 6 documents received comments CEN NWI raised for the ECSS TRL Adoption Notice (ECSS-E-AS-11C) CEN-TC5 meeting - 16 December 2014CEN -TC5 WG 6 Status Report2

3 Sent to CEN on 13 Nov.2014 to start UAP 1.FprEN 16603-32-08 Space engineering - Materials 2.FprEN 16602-70 Space product assurance - Materials, mechanical parts and processes 3.FprEN 16602-70-71 Space product assurance - Materials, processes and their data selection 4.FprEN 16602-20-07 Space product assurance -Quality and safety assurance for test centres 5.FprEN 16602-20-08 Space product assurance -Storage, handling and transportation of spacecraft hardware 6.FprEN 16602-70-12 Space product assurance - Design rules for printed circuit boards CEN-TC5 meeting - 16 December 2014CEN -TC5 WG 6 Status Report3

4 Comments received from new CEN UAP 1.FprEN 16603-50-53 - SpaceWire - CCSDS packet transfer protocol (N294) 2.FprEN 16602-70-45 - Mechanical testing of metallic materials (N278) 3.FprEN 16602-70-46 - Requirements for manufacturing and procurement of threaded fasteners (N279) 4.FprEN 16603-31-02 - Two-phase heat transport equipment (N293) 5.FprEN 16603-60-30 - Satellite AOCS requirements (N288) 6.FprEN 16602-70-56 - Vapour Phase Bioburden Reduction for Flight Hardware (N287) All documents were approved. The comments will be checked and dispositioned by ECSS. NOTE: The number in “()” is the N-number of the CEN UAP ballot paper document. CEN-TC5 meeting - 16 December 2014CEN -TC5 WG 6 Status Report4

5 ECSS NWIP sent to CEN 7 new ECSS activities were adopted by CEN. 1 new ECSS activity submitted for adoption on 11 Nov. 2014 CEN-TC5 meeting - 16 December 2014 No.EN numberECSS numberEnglish TitleResolution of CEN NWI Due date NWI Vote Vote NWI started VOTE RESULT 1EN16601-01ECSS-S-ST-00C EN 16600 series - Description, implementation and general requirements N21216/12/201301/11/2013Adopted 2EN16603-20-20ECSS-E-ST-20-20CInterface requirements for electrical powerN21116/12/201301/11/2013Adopted 3EN16602-70-39ECSS-Q-ST-70-39CWelding of metallic materials for flight hardwareN21001/12/201301/11/2013Adopted 4EN16602-70-14ECSS-Q-ST-70-14CSpace product assurance - CorrosionN25410/03/201427/01/2014Adopted 5EN16602-70-15ECSS-Q-ST-70-15C Space product assurance - Non-destructive testing or non-destructive inspection N25310/03/201427/01/2014Adopted 6EN16603-31-04ECSS-E-ST-31-04C Space engineering - Exchange of thermal model data for space applications N25510/03/201427/01/2014Adopted 7EN16604-20ECSS-U-20CSpace sustainability – Planetary protectionN26710/03/201427/01/2014Adopted 8EN16603-11ECSS-E-AS-11C Space engineering - Adoption Notice of ISO 16290, Space systems - Definition of the Technology Readiness Levels (TRLs) and their criteria of assessment Sent to CEN- TC5 Secretariat 11Nov2014 CEN -TC5 WG 6 Status Report5