Download presentation
Presentation is loading. Please wait.
Published byCheyenne Bugg Modified over 10 years ago
1
Sustainable Residential Design Project Project 9 DS413: Design Studio 413 May 9, 2012
2
Coded Floorplan/Site Plan N
6
Coded Floorplan/Site plan
7
1. Sustainable Site 1A: Permeable concrete for driveway 1A: Permeable concrete for driveway 1B: Using a previously developed site 1B: Using a previously developed site 1C: Site is near schools, restaurants, and other services 1C: Site is near schools, restaurants, and other services 1D: Rain garden-harvests water 1D: Rain garden-harvests water 1E: Use of local plants 1E: Use of local plants
8
2. Water Efficiency 2A: Rain harvesting barrels 2A: Rain harvesting barrels 2B: Rain garden 2B: Rain garden 2C: Low-flow plumbing fixtures 2C: Low-flow plumbing fixtures 2D: Greywater system 2D: Greywater system 2E: Dual-flush toilet 2E: Dual-flush toilet
9
3. Energy and Atmosphere 3A: shades to block out unwanted heat 3A: shades to block out unwanted heat 3B: utilizing rainwater with rain garden 3B: utilizing rainwater with rain garden 3C: environmentally friendly HVAC system 3C: environmentally friendly HVAC system 3D: Energy Star Kitchen Appliances 3D: Energy Star Kitchen Appliances 3E: Energy Star Washing Machine and Dryer 3E: Energy Star Washing Machine and Dryer
10
4. Materials & Resources 4A: Recycle bins 4A: Recycle bins 4B: Dining room table made from recycled barn wood 4B: Dining room table made from recycled barn wood 4C: Kitchen cabinets (and all other furniture and trim in house) made from FSC certified wood 4C: Kitchen cabinets (and all other furniture and trim in house) made from FSC certified wood 4D: Countertop made within 500 mi. of site 4D: Countertop made within 500 mi. of site 4E: Bamboo flooring 4E: Bamboo flooring
11
5. Indoor Environmental Quality 5A: Carbon Dioxide monitors 5A: Carbon Dioxide monitors 5B: Low VOC paint through-out house 5B: Low VOC paint through-out house 5C: Green Label Plus carpeting-low emitting 5C: Green Label Plus carpeting-low emitting 5D: Daylight in 75% of the space 5D: Daylight in 75% of the space 5E: Heat and lighting controls are easily accessible 5E: Heat and lighting controls are easily accessible
12
6. Innovation & Design Process 6A: Rainwater harvesting reduces water use 6A: Rainwater harvesting reduces water use 6B: Light colored roof to reduce heat absorption 6B: Light colored roof to reduce heat absorption 6C: Low-flow plumbing fixtures 6C: Low-flow plumbing fixtures 6D: Well-insulated walls, doors, and windows 6D: Well-insulated walls, doors, and windows 6E: Windows placed on south wall to absorb heat from winter sun. 6E: Windows placed on south wall to absorb heat from winter sun.
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.