1 Independent Lighting Solutions Specialist Case Study Packaging Store Developments in Professional LED Lighting

2 Patrick Kelly – Business Development Manager Who is Llumarlite?  Established 1992  Head Office – Aylesbury. Northern Office - Leeds  Independent Lighting Solutions Specialists  Complete Turnkey Package  32 Employees within Group + up-to 60 installers  National Coverage Introduction

3 Technology Partners

4 Latest LED Technology

5 Our Clients

6 BV Dairy - Shaftesbury Packaging Store – Lighting & Controls Refurb Professional LED Lighting High Sensitivity Occupancy Sensors

7 Environment  Poorly lit space – potential hazard Luminaires  1 x 70w & 2 x 70w SS Flu  Burnt-out fluorescent tubes  Plastic Diffuser clips broken Installation  Inefficient orientation of luminaire Energy  Excessive use of lighting load – wasted light Controls  2 wall switches typically left ON Initial Site Observations

8 Power Logging : Pre-install Circuit 22 – 1.52kWh Circuit 23 – 1.78kWh Total Load – 3.3kWh ----------- 554.4kWh per Week Dusk to Dawn Ext. Lighting Load

9 Lighting  Point for Point Replacement  Removed unnecessary lights  6ft IP65 Weatherproof Body  Samsung Linear LED Boards  Helvar LED Driver Controls  High Sensitivity Occupancy Sensors  Infrared Handset Programmable  5m Mounting Height – 10m Dia Detection Installation  Custom made mounting brackets & suspensions  Re-wired to 3 Occupancy Switching Circuits  One row of lighting moved further into the aisle  5 Year Product Warranty incl. 1 Year On-site Proposed Solution

10 Lighting Design – 3D Model  Lighting calculations computer modelled using Relux

11 Lighting Design - Plots  Lighting Industry Federation trained design team

12 Lighting Design – Lux Calcs  Designed in accordance with Part L and CIBSE Recommendations  Emergency Lighting schemes designed to meet BS5266

13 Lighting Load Comparison

14 Before & After – Aisle A Before : 85 luxAfter : 233 lux CIBSE Recommendation : minimum 150 lux Lights Removed

15 Before & After – Aisle B Before : 35 – 50 luxAfter : 268 lux CIBSE Recommendation : minimum 150 lux Row moved

16 Before & After – Cross Aisle Before : 75 luxAfter : 223 lux CIBSE Recommendation : minimum 150 lux

17 Power Logging : Post-install Circuit 22 – 0.39kWhCircuit 23 – 0.26kWh New: Total Load – 0.66kWh ---------- 55.65kWh per Week 395W LED Load 265W LED Load 490W LED & Ext. Lighting Load Old: Total Load – 3.3kWh ------------- 554.4kWh per Week

18 Return On Investment

19 Revenue Stream Financials  Income between Year 3 to 11 incl. £31,000  Maintenance Benefit Year 1 to 11 incl. £7,000+  Positive Impact on Operational Costs  No Installation or Maintenance Disruption to the Business

20 Benefits / Summary  Installed around the clients operational commitments  Recycling by Llumarlite for clients ISO 14001 commitments  Major improvement to the lit environment  91% Energy Reduction proven by Power Loggers  Project Cost £5,745 - 2 Year Return on Investment  £38,000 Income Stream from Energy & Maintenance Benefit  Enhanced Capital Allowances – Total Project Value Qualifies  Capital Funding - Financing Solutions Available

21 Independent Lighting Solutions Specialist www.llumarlite.co.uk Developments in Professional LED Lighting Case Study


Download ppt "Independent Lighting Solutions Specialist Case Study Packaging Store Developments in Professional LED Lighting."

Similar presentations


Ads by Google