Presentation is loading. Please wait.

Presentation is loading. Please wait.

STRATEGIC ACTIONS PLAN

Similar presentations


Presentation on theme: "STRATEGIC ACTIONS PLAN"— Presentation transcript:

1 STRATEGIC ACTIONS PLAN
Distributed Generation Renewable Energy With the JouleBox™ Hybrid Generators Confidential Proprietary Material Presented by IIG-ECO-GEN Energy, Inc. © 2014 All Rights Reserved STRATEGIC ACTIONS PLAN Available 24/7/365 Green Is Good Concepts for the Future and for the Present Affordable Reliable © IIG-ECO-GEN Energy, Inc

2 STRATEGIC ACTIONS PLAN
IIG-ECO-GEN Energy, Inc. and our financial partners are prepared to enter into Long Term 20 year PPA’s to provide 100% clean, green energy. We will provide ‘Firm Power’ 24/7/365 using a hybrid system of solar, wind and lithium ion batteries. STRATEGIC ACTIONS PLAN Renewable Energy is Needed Now! Concepts for the Future and for the Present © IIG-ECO-GEN Energy, Inc under permission of the Bellagio Trust. All Rights Reserved

3 STRATEGIC ACTIONS PLAN
Traditional Energy Expensive, Pollution, Not Sustainable Fossil Fuels Nuclear Power Plants Renewables Coal, Natural Gas, San Onofre – Shut down produce 4-8 Hours per day All fossil fuels have Fukushima – problems solar, wind, hydro fuel costs and Environmental damage expensive Carbon footprint that transmission costs is not sustainable. Now there is a Better Way STRATEGIC ACTIONS PLAN Concepts for the Future and for the Present © IIG-ECO-GEN Energy, Inc under permission of the Bellagio Trust. All Rights Reserved

4 STRATEGIC ACTIONS PLAN
Traditional Renewable Energy Intermittent Power 4-12 Hours per day – AT BEST Solar panels Concentrated Solar Wind Not enough room Large land footprint Hours per day where the power Environmental damage Environmental damage is needed High Transmission costs High Transmission costs 4-6 Hours per day Now there is a Better Way STRATEGIC ACTIONS PLAN Concepts for the Future and for the Present © IIG-ECO-GEN Energy, Inc under permission of the Bellagio Trust. All Rights Reserved

5 STRATEGIC ACTIONS PLAN
The JouleBox™ Produces Clean, Green Energy 24/7/365 using solar, wind and lithium ion batteries. 5 Proven Technologies have been combined in one box to generate electricity. STRATEGIC ACTIONS PLAN JouleBox™ Hybrid Generator 60 kW Annual kWh produced 525,600 Annual kWh’s are estimated as unit size (60 kW) X 24 hours per day X 365 days in year. Actual production may vary slightly (+ 5%). Concepts for the Future and for the Present © IIG-ECO-GEN Energy, Inc under permission of the Bellagio Trust. All Rights Reserved

6 STRATEGIC ACTIONS PLAN
The JouleBox™ Hybrid Generator Understanding The Technology 5 Proven Technologies have been combined to generate electricity. Solar Panels and DC Generators to constantly charge the batteries. Lithium Ion Battery Brick with patented Serial and Parallel wiring to Charge and Discharge. By not using the 15,000 charge/discharge life cycles, the batteries will last 20 years plus. Vortex Reduction Chamber (VRC). High Pressure Manufactured Wind is sent through a VRC to increase Force with reduced energy to turn the Power Turbine. The Power Turbine turns an AC Generator. High Efficiency Speed Control DC Motors and DC Blower Motors and controllers for greater durability and reliability. We use electronic controllers to maximize efficiency. Our motors use 1/3rd the energy of conventional motors. Power Q – controls the power quality output to sync with the grid and maintain proper harmonics. Clean sine waves, stable Hz and harmonics, no power surges. We have protected the Intellectual Property (IP) with layers of use patents, copyrights and other IP. The software is burned into the chips which eliminates the risk of reverse engineering. All units are GPS equipped with licensing agreements for installation at a specified location. Location modification is allowed under the licensing agreement with notification. STRATEGIC ACTIONS PLAN Concepts for the Future and for the Present © IIG-ECO-GEN Energy, Inc under permission of the Bellagio Trust. All Rights Reserved

7 STRATEGIC ACTIONS PLAN
Distributed Generation STRATEGIC ACTIONS PLAN IIG-ECO-GEN and our financial partners are prepared to invest and build Micro Grid Distributed Generation Power Facilities Next to the PCC, next to sub-stations, … Where the energy is needed! Clusters of 60 kW units – from 3 MW to 50 MW plants or more Why pay high transmission costs? Why suffer losses in transmission? Scalable in size Dependable “Firm Power” We will lease/buy “Right-of-Way” land under transmission lines next to the sub-station where power is needed. Concepts for the Future and for the Present © IIG-ECO-GEN Energy, Inc under permission of the Bellagio Trust. All Rights Reserved

8 STRATEGIC ACTIONS PLAN
Installations By Installing next to the Substations you avoid Transmission Costs. We work with the Grid to stabilize existing energy generation or we can work off-Grid. STRATEGIC ACTIONS PLAN New facility Concepts for the Future and for the Present © IIG-ECO-GEN Energy, Inc under permission of the Bellagio Trust. All Rights Reserved

9 STRATEGIC ACTIONS PLAN
Installations Next to Substations By determining the capacity of the Substation we can build multiple installations in varying sizes. This strengthens the overall Grid. The above shows MW total. STRATEGIC ACTIONS PLAN New JouleBox facility 4.32 MW New JouleBox facility 2.88 MW New JouleBox facility 10.8 MW New JouleBox facility 6.48 MW New JouleBox facility 50.4 MW New JouleBox facility 7.2 MW Concepts for the Future and for the Present © IIG-ECO-GEN Energy, Inc under permission of the Bellagio Trust. All Rights Reserved

10 STRATEGIC ACTIONS PLAN
Installations All JouleBox ® Units are installed inside a safe and secure pre-fab building. Can be sized from 2.88 MW building to multiple buildings with 50.4 MW EACH. Install next to Sub-station where energy is needed (must be in groups of 12 JouleBoxes®). 24/7/365 Satellite communications monitoring. STRATEGIC ACTIONS PLAN Installations are Modular: Building, Racking, Sound & Solar Module Electrical Intertie & Protection Module Communications, IT & Security Module Concepts for the Future and for the Present © IIG-ECO-GEN Energy, Inc under permission of the Bellagio Trust. All Rights Reserved

11 STRATEGIC ACTIONS PLAN
Building, Racking, Sound & Solar Module Can be sized from 2.88 MW building to multiple buildings with 50.4 MW EACH. Install next to Sub-station where energy is needed (must be in groups of 12 JouleBoxes®). STRATEGIC ACTIONS PLAN Concepts for the Future and for the Present © IIG-ECO-GEN Energy, Inc under permission of the Bellagio Trust. All Rights Reserved

12 STRATEGIC ACTIONS PLAN
Electrical Intertie & Grid Protection Module STRATEGIC ACTIONS PLAN Designed by a Senior Member, IEEE IEEE Power Systems Relaying Committee (PSRC), Main Committee IEEE PSRC Rotating Machinery Protection Subcommittee, Chair Emeritus IEEE PSRC Rotating Machinery Protection Subcommittee, Committee Member 12 Units are Combined Power Q (Power Quality Box) regulates sine waves, harmonics, voltage spikes ABB Switchgear Concepts for the Future and for the Present Woodward EasYgen Beckwith Intertie Protection © IIG-ECO-GEN Energy, Inc under permission of the Bellagio Trust. All Rights Reserved

13 Power Plant Communications, IT & Security Module
Site-wide Video Surveillance Network Provided By Uplink to Control Center Cinetcomm’s global networks provide all back office support, systems monitoring and control via satellite communications for IIG-ECO-GEN Energy’s operations. Facility Access Control IT & Satellite Hub Generator Control & Monitoring of all units and component parts 24/7 © IIG-ECO-GEN Energy, Inc under permission of the Bellagio Trust. All Rights Reserved 2014

14 STRATEGIC ACTIONS PLAN
PPA Power Purchase Agreements STRATEGIC ACTIONS PLAN Advantages No Capital Cost to install or maintain equipment. 100% turn key operation. Firm Power, 24/7/365 Satellite Monitoring for safety and guaranteed production at no additional cost.. Maintenance Free – All PPAs include maintenance and repairs. High Quality Power, Clean electricity, stable Hz, synced sine waves, and harmonics, no power surges. No pollution – Clean, Green Electricity! No Fuel Costs. Lower per kWh costs than all other forms of energy generation . Fixed 20 yr. rate per kWh of electricity produced. No escalator for inflation. Rates from US$ $0.32 per kWh depending on credit, sovereign guarantee and escalator clauses. Also Switchgear and transformer requirements Scalable. 3 MW to multiple 50 MW Buildings. Energy is produced next to sub-stations - where the energy is needed! All PPAs are owned by a local Special Purpose Entity (SPE). IIG-ECO-GEN retains a 25% interest in all SPEs to compensate for IP. Reliable Energy Produces Jobs Faster Than Anything Else. Factories Can Operate 24/7 The Power Q in the JouleBox™ controls harmonics, sine waves, Hz, voltage, power surges and auto cut-off for safety. Units can be satellite monitored remotely. Concepts for the Future and for the Present © IIG-ECO-GEN Energy, Inc under permission of the Bellagio Trust. All Rights Reserved 2014

15 STRATEGIC ACTIONS PLAN
Good For Country Local Construction Jobs Local Sourcing of Building Material The Owner of the Facility is a local SPE Jobs in the Facility 24/7/365 Management Engineers Maintenance Security Secure, Reliable, Green ENERGY CREATES JOBS More Anything Else! STRATEGIC ACTIONS PLAN Concepts for the Future and for the Present © IIG-ECO-GEN Energy, Inc under permission of the Bellagio Trust. All Rights Reserved 2014

16 STRATEGIC ACTIONS PLAN
PPA Power Purchase Agreements IIG-ECO-GEN Energy, Inc. and our financial partners are prepared to enter into Long Term 20 Year PPA’s to provide 100% clean, green energy. We will provide ‘Firm Power’ 24/7/365 using a hybrid system of solar, wind and lithium ion batteries. STRATEGIC ACTIONS PLAN Concepts for the Future and for the Present © IIG-ECO-GEN Energy, Inc under permission of the Bellagio Trust. All Rights Reserved

17 STRATEGIC ACTIONS PLAN
Contact IIG-ECO-GEN STRATEGIC ACTIONS PLAN Green Energy Concepts for the Future and for the Present © IIG-ECO-GEN Energy, Inc under permission of the Bellagio Trust. All Rights Reserved 72,000 CFM


Download ppt "STRATEGIC ACTIONS PLAN"

Similar presentations


Ads by Google