Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 Project Risk SBIR Topic No: N??-???Award Date: mm/dd/yyyy Provide a picture/graphic depicting the issue CONTACTS TPOC: Name, OrgTPOC Email: SBIR Technology.

Similar presentations


Presentation on theme: "1 Project Risk SBIR Topic No: N??-???Award Date: mm/dd/yyyy Provide a picture/graphic depicting the issue CONTACTS TPOC: Name, OrgTPOC Email: SBIR Technology."— Presentation transcript:

1 1 Project Risk SBIR Topic No: N??-???Award Date: mm/dd/yyyy Provide a picture/graphic depicting the issue CONTACTS TPOC: Name, OrgTPOC Email: SBIR Technology Manager: Name, OrgTWH: POC Transition PM: Name, OrgContractor: Objectives: Short statement explaining the project technology and program objectives Navy/Prog Req’t: Brief description of the Navy need, as related to the Program of Record (PoR) requirements, driving technology development Benefit/Payoff: Brief description of the benefit & payoff to the Navy Deliverable: Brief description of the matured product to be delivered for fleet use Challenge/Risk: Brief description of the technical risk this project is seeking to reduce Acq/Trans Strategy: Brief description of the strategy to transition products to Navy use, including how products from the effort will be acquired (i.e. direct Phase III contract, purchased via a Prime Contractor, placed on a certified products list, etc). Include additional work that may be performed under a Phase III. 1 SBIR Working Papers – Not for Distribution No YesITAR Current Status:ActiveComplete Your Logo PMO: Rev 6 22 Apr 2014

2 Contractor:Topic #: Contract#: Start DateCompletion Date Mm/dd/yy 2 SBIR Working Papers – Not for Distribution CategoryContract Objectives (Baseline) Status TechnicalHighlight the key technical objectives for Phase I Status of the technical Objectives TransitionPhase I transition objectives, (what was planned for presenting to proposed technology to the programs of record). Highlight any discretionary technical assistance efforts. Status of transition & any changes in the transition strategy. Indicate whether issues in baseline are resolving RiskIndicate major issues/risks with regard to technology development identified in the baseline (included schedule, cost. performance and transition risks) Show status of technical risk reduction & any changes in technical issues/risks relative to the baseline. Initial TRL1-8Current TRLTarget TRLContract Deliv/Rpts ProvidedYes or No Your Logo PMO: Rev 6 22 Apr 2014

3 3 Picture Depicting Concept Phase I Option: Briefly explain the project technology objective and tasking of the during the Phase I option. Phase II Tasking: Brief description the overall tasks for the Phase II development. Include the technology development, testing and certifications required. Highlight the expected deliverables for Phase II (i.e. source code, prototypes, reports, etc). Highlight any discretionary technical assistance efforts planned for Phase II. Phase II Objective: Brief description of the overall objective of the next phase of development. Include the estimated TRL expected at the end of this phase Technical/Developmental Risks: Brief description of the technical risk this project is seeking to reduce during Phase II. 3 SBIR Working Papers – Not for Distribution No YesITAR Current Status:ActiveComplete Your Logo PMO: Rev 6 22 Apr 2014


Download ppt "1 Project Risk SBIR Topic No: N??-???Award Date: mm/dd/yyyy Provide a picture/graphic depicting the issue CONTACTS TPOC: Name, OrgTPOC Email: SBIR Technology."

Similar presentations


Ads by Google